CN203361595U - Multifunctional building lifting scaffold - Google Patents

Multifunctional building lifting scaffold Download PDF

Info

Publication number
CN203361595U
CN203361595U CN 201320261825 CN201320261825U CN203361595U CN 203361595 U CN203361595 U CN 203361595U CN 201320261825 CN201320261825 CN 201320261825 CN 201320261825 U CN201320261825 U CN 201320261825U CN 203361595 U CN203361595 U CN 203361595U
Authority
CN
China
Prior art keywords
screw
screw thread
vertical rod
threaded
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320261825
Other languages
Chinese (zh)
Inventor
鲁应乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320261825 priority Critical patent/CN203361595U/en
Application granted granted Critical
Publication of CN203361595U publication Critical patent/CN203361595U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

A multifunctional building lifting scaffold comprises two upper horizontal rods, anti-skidding foot ladders and stand columns, the two ends of the two upper horizontal rods are connected with threaded lifting rods respectively, wherein the threaded lifting rods are perpendicular to the horizontal plane, the bottom ends of the threaded lifting rods are arranged in threaded sleeves, the bottom ends of the threaded sleeves are provided with the stand columns, one side of each stand column is provided with one anti-skidding foot ladder, the top ends of the threaded sleeves are provided with first threaded clamps fixed on the outer walls of the threaded lifting rods, a first shearing rod is connected between the two lifting threaded rods at the front end and the two threaded sleeves, and a second shearing rod is connected between the two threaded sleeves and the two stand columns. The multifunctional building lifting scaffold is compact in structure, simple and light, and the lifting operation is easy and convenient to carry out.

Description

A kind of multifunctional building lifting false work
Technical field
The utility model relates to a kind of multifunctional building lifting false work.
Background technology
In known technology, the bottom of scaffold support body suspension scaffold will be sealed, and to prevent object, falls down the generation security incident.The scaffold that lands is directly to set up on the ground or on floor, the processing such as draining of need to being hardened to ground, and vertical rod bottom pad is established plank or channel-section steel to enlarge the load-bearing area; And suspension scaffold is that vertical rod is set directly on the shaped steel picked out outside building is backward through special consolidation process, therefore pre-buried to installation site, distributed dimension, the reinforcing of shaped steel, choose in length and building, to the length of reinforcing section, certain very strict regulation arranged outward, therefore the suspension scaffold each point is set all very important, must definitely guarantees safety.
At present traditional scaffold function is very single, can not meet the construction of demand different aspects originally, the constructor need to lease extremely accessory of different scaffolds, need to spend a lot of time and find different stools, or adopt the padded construction of unsteady object, this kind of method is easy to produce physical fatigue, working area is limited, build two-layer more than during operation in the air, owing to setting up wicket frame inconvenience, randomness is very large, while climbing foot-driven lever up and down in addition, the sliding color empty danger of pin, be easy to produce unexpected when the workman constructs.
The utility model content
The technical problem that the utility model solves is to provide a kind of multifunctional building lifting false work, to solve the shortcoming in the above-mentioned background technology.
The technical problem that the utility model solves realizes by the following technical solutions:
A kind of multifunctional building lifting false work, comprise two upper width horizon bars, anti-skidding foot of ladder and column, described two upper width horizon bar two ends are connected with respectively the screw thread elevating lever vertical with horizontal plane, the bottom of screw thread elevating lever all is arranged in screw shell, the bottom of screw shell arranges column, one side of column is equipped with anti-skidding foot of ladder, the top of threaded sleeve is provided with the first screw clamp be fixed on screw thread elevating lever outer wall, between two elevating screw thread bars of front end and two screw shells and be connected with respectively the first scissors bar and the second scissors bar between two screw shells and two columns, the first scissors bar and the second scissors bar are locked respectively fixing by expense.
Screw thread Multifunctional lift scaffold of the present utility model, described anti-skidding foot of ladder comprises vertical rod, the top of vertical rod is connected on screw shell by upper width non-slip feet treadle, be connected lower width non-slip feet treadle by positon of near bottom between vertical rod and column, on the vertical rod outer wall on lower width non-slip feet treadle top, screw thread all be set.
Screw thread Multifunctional lift scaffold of the present utility model, the described lower width horizon bar be actively set in vertical rod that is provided with between two vertical rods of left end and right-hand member, fix by the second screw clamp be arranged on screw thread in the vertical rod of lower width horizon bar bottom.
When screw thread Multifunctional lift scaffold of the present utility model is specifically used, first the elevating screw thread bar is extracted in screw shell, after arriving the height needed, use the first screw clamp to fix, realize the lifting of elevating screw thread bar, while carrying out lower width horizon bar lifting, after lower width horizon bar is elevated to the height needed, by the second screw clamp, fix, finally on two, width horizon bar and lower width horizon bar are placed operating platform, can implement the compact conformation of multi-level construction requirement, simply, light, descending operation is simple and easy, lifting stops arbitrarily and firmly, the stage construction construction, resistance to overturning is high, adjust scaffold operating time and trouble when effectively the minimizing personnel work, the lifting of handled easily height space length, can effectively improve engineering staff's efficiency, can be widely used in various constructions.
Beneficial effect
The utility model compact conformation, simple, light, descending operation is simple and easy, lifting stop arbitrarily and firmly, the stage construction construction, resistance to overturning is high; Adjust scaffold operating time and trouble when effectively the minimizing personnel work, the lifting of handled easily height space length, can effectively improve engineering staff's efficiency, can be widely used in various constructions.
The accompanying drawing explanation
Fig. 1 is a kind of multifunctional building lifting false work;
In figure: 1, upper width horizon bar; 2, anti-skidding foot of ladder; 3, column; 4, screw thread elevating lever; 5, screw shell; 6, the first screw clamp; 7, the first scissors bar; 8, the second scissors bar; 9, expense lock; 10, vertical rod; 11, upper width non-slip feet treadle; 12, lower width non-slip feet treadle; 13, lower width horizon bar; 14, the second screw clamp.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
As shown in Figure 1, a kind of multifunctional building lifting false work, comprise two upper width horizon bars 1, anti-skidding foot of ladder 2 and column 3, described two upper width horizon bar 1 two ends are connected with respectively the screw thread elevating lever 4 vertical with horizontal plane, the bottom of screw thread elevating lever 4 all is arranged in screw shell 5, the bottom of screw shell 5 arranges column 3, one side of column 3 is equipped with anti-skidding foot of ladder 2, the top of threaded sleeve 5 is provided with the first screw clamp 6 be fixed on screw thread elevating lever 4 outer walls, between two elevating screw thread bars 4 of front end and two screw shells 5 and be connected with respectively the first scissors bar 7 and the second scissors bar 8 between two screw shells 5 and two columns 3, the first scissors bar 7 and the second scissors bar 8 are locked 9 by expense respectively and are fixed.
Screw thread Multifunctional lift scaffold of the present utility model, described anti-skidding foot of ladder 2 comprises vertical rod 10, the top of vertical rod 10 is connected on screw shell 5 by upper width non-slip feet treadle 11, be connected lower width non-slip feet treadle 12 by positon of near bottom between vertical rod 10 and column 3, on vertical rod 10 outer walls on lower width non-slip feet treadle 12 tops, screw thread all be set.
Screw thread Multifunctional lift scaffold of the present utility model, the described lower width horizon bar 13 be actively set in vertical rod 10 that is provided with between two vertical rods 10 of left end and right-hand member, fixing by the second screw clamp 14 be arranged on screw thread in the vertical rod 10 of lower width horizon bar 13 bottoms.
When screw thread Multifunctional lift scaffold of the present utility model is specifically used, first elevating screw thread bar 4 is extracted in screw shell 5, after arriving the height needed, use the first screw clamp 6 fixing, realize the lifting of elevating screw thread bar 4, while carrying out 13 lifting of lower width horizon bar, after lower width horizon bar 13 is elevated to the height needed, fixing by the second screw clamp 14, finally on two, width horizon bar 1 and lower width horizon bar 13 are placed operating platform, can implement the compact conformation of multi-level construction requirement, simply, light, descending operation is simple and easy, lifting stops arbitrarily and firmly, the stage construction construction, resistance to overturning is high, adjust scaffold operating time and trouble when effectively the minimizing personnel work, the lifting of handled easily height space length, can effectively improve engineering staff's efficiency, can be widely used in various constructions.
Above demonstration and described basic principle of the present utility model and principal character and advantage of the present utility model, the technician of the industry should understand, the utility model is not restricted to the described embodiments, that in above-described embodiment and manual, describes just illustrates principle of the present utility model, under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications, these changes and improvements all fall in claimed the utility model scope, the claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (3)

1. a multifunctional building lifting false work, it is characterized in that, comprise two upper width horizon bars, anti-skidding foot of ladder and column, described two upper width horizon bar two ends are connected with respectively the screw thread elevating lever vertical with horizontal plane, the bottom of screw thread elevating lever all is arranged in screw shell, the bottom of screw shell arranges column, one side of column is equipped with anti-skidding foot of ladder, the top of threaded sleeve is provided with the first screw clamp be fixed on screw thread elevating lever outer wall, between two elevating screw thread bars of front end and two screw shells and be connected with respectively the first scissors bar and the second scissors bar between two screw shells and two columns, the first scissors bar and the second scissors bar are locked respectively fixing by expense.
2. a kind of multifunctional building lifting false work according to claim 1, it is characterized in that, described anti-skidding foot of ladder comprises vertical rod, the top of vertical rod is connected on screw shell by upper width non-slip feet treadle, be connected lower width non-slip feet treadle by positon of near bottom between vertical rod and column, on the vertical rod outer wall on lower width non-slip feet treadle top, screw thread all be set.
3. a kind of multifunctional building lifting false work according to claim 2, it is characterized in that, the described lower width horizon bar be actively set in vertical rod that is provided with between two vertical rods of left end and right-hand member, fix by the second screw clamp be arranged on screw thread in the vertical rod of lower width horizon bar bottom.
CN 201320261825 2013-05-10 2013-05-10 Multifunctional building lifting scaffold Expired - Fee Related CN203361595U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320261825 CN203361595U (en) 2013-05-10 2013-05-10 Multifunctional building lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320261825 CN203361595U (en) 2013-05-10 2013-05-10 Multifunctional building lifting scaffold

Publications (1)

Publication Number Publication Date
CN203361595U true CN203361595U (en) 2013-12-25

Family

ID=49809381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320261825 Expired - Fee Related CN203361595U (en) 2013-05-10 2013-05-10 Multifunctional building lifting scaffold

Country Status (1)

Country Link
CN (1) CN203361595U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029805A (en) * 2019-03-26 2019-07-19 中国五冶集团有限公司 A kind of adjustable overhanging I-steel pre-embedded device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029805A (en) * 2019-03-26 2019-07-19 中国五冶集团有限公司 A kind of adjustable overhanging I-steel pre-embedded device
CN110029805B (en) * 2019-03-26 2023-10-13 中国五冶集团有限公司 Adjustable I-steel pre-buried device of encorbelmenting

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN210195192U (en) Scaffold frame that construction was used
CN208121575U (en) A kind of operating platform for bridge tower thwart beam construction
CN203361595U (en) Multifunctional building lifting scaffold
CN213626572U (en) Tool type external cantilever operation platform
CN211473327U (en) Building external climbing type building construction operation platform
CN206418751U (en) One kind can freely lift flexible assembled hoistway operation platform
CN104453243B (en) Cast-in-situ concrete beam steadily enters the erection device and method of mould
CN208310154U (en) A kind of construction scaffold
CN204290129U (en) A kind of New Type Isolating Switch repairing frame
CN202810170U (en) Multifunctional thread lifting scaffold
CN201284559Y (en) Fastener type steel pipe scaffold template stand
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN203488077U (en) Ladder for building workers
CN211114732U (en) Portable movable reinforcement operation platform
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN207526085U (en) A kind of attachment type raise scaffold structure
CN201381638Y (en) Fastener type steel pipe scaffold template bracket
CN205531290U (en) Light -duty simple and easy scaffold board support
CN206189829U (en) Auto -lock lifting foot hand rack
CN210713750U (en) Engineering construction is with safe type hanging flower basket
CN203878962U (en) Independent supporting device for high-place operation hanging basket cantilever
CN205046572U (en) Bulky concrete removes over -and -under type construction platform
CN211572485U (en) Lifting integrated scaffold for building construction
CN206220455U (en) A kind of construction support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225

Termination date: 20160510