CN203348769U - SF6 equipment comprehensive inflating pipeline system - Google Patents
SF6 equipment comprehensive inflating pipeline system Download PDFInfo
- Publication number
- CN203348769U CN203348769U CN 201320347357 CN201320347357U CN203348769U CN 203348769 U CN203348769 U CN 203348769U CN 201320347357 CN201320347357 CN 201320347357 CN 201320347357 U CN201320347357 U CN 201320347357U CN 203348769 U CN203348769 U CN 203348769U
- Authority
- CN
- China
- Prior art keywords
- gas tube
- tube joint
- inflating
- equipment
- bore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008033 biological extinction Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010292 electrical insulation Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
Images
Landscapes
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
The utility model relates to an SF6 equipment comprehensive inflating pipeline system and belongs to the technical field of an SF6 equipment inflating pipeline device. The technical purpose to be achieved is that the SF6 equipment inflating pipeline device which can adapt to valves of different types is provided. The SF6 equipment comprehensive inflating pipeline device comprises inflating pipe adapters which can be sequentially connected and have gradually smaller diameters. The diameters of the two ends of each inflating pipe adapter are different. The large-diameter ends of the inflating pipe adapters are provided with inner threads and the small-diameter ends of the inflating pipe adapters are provided with outer threads. The SF6 equipment comprehensive inflating pipeline system is applicable to the electric power department.
Description
Technical field
The utility model SF6 equipment complex loading line system, belong to SF6 filling apparatus air pipe device technique field.
Background technique
SF6 has good electrical insulation properties and excellent arc extinction performance, so SF6 equipment is often used at power department, due to the SF6 device fabrication, producer differs, equipment valve model is various, bring very large inconvenience to the inflation of daily SF6 equipment, need to prepare various joints, and operating process also needs SC, increase staff's working strength, and delayed job schedule.
The model utility content
The utility model overcomes the deficiency that prior art exists, and technical problem to be solved is: a kind of SF6 filling apparatus air pipe device that can adapt to various different model valves is provided.
For solving the problems of the technologies described above, the technological scheme that the utility model adopts is: SF6 equipment complex loading line system, comprise and a plurality ofly can connect successively the gas tube joint that bore reduces gradually, the bore difference at described gas tube joint two ends, the end that gas tube joint bore is large is provided with internal thread, and the end that gas tube joint bore is little is provided with outside thread.
Described SF6 equipment complex loading line system also includes the casing that above-mentioned gas tube joint is installed; Be disposed with from big to small the groove of laying above-mentioned gas tube joint in casing, the other volume board that is provided with each gas tube joint of described groove.
The beneficial effect that the utility model compared with prior art has is: the utility model is by the gas tube adapter system of a plurality of different bores, the quick-acting joint that is assembled into the needed bore of filling channel that can be random, facilitated installation and the use of SF6 filling apparatus air pipe, increased work efficiency.
The accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail:
Fig. 1 is structural representation of the present utility model;
In figure: 1 is that gas tube joint, 2 is that first order gas tube joint, 3 is second level gas tube joint.
Embodiment
As shown in Figure 1, the utility model SF6 equipment complex loading line system, comprise and a plurality ofly can connect successively the gas tube joint 1 that bore reduces gradually, the bore difference at described gas tube joint 1 two ends, the end that gas tube joint 1 bore is large is provided with internal thread, and the end that gas tube joint 1 bore is little is provided with outside thread.
The small-caliber end outside thread of first order gas tube joint 2 and second level gas tube joint 3 heavy caliber internal threads on figure, all gas tube joints 1 can connect successively.
In the process that described gas tube joint 1 uses, can choose at random according to the caliber of SF6 filling apparatus air pipe, if only need two joints just can only use first order gas tube joint 2 and second level gas tube joint 3.
Described SF6 equipment complex loading line system also includes the casing that above-mentioned gas tube joint 1 is installed; Be disposed with from big to small the groove of laying above-mentioned gas tube joint 1 in casing, the other volume board that is provided with each gas tube joint 1 of described groove, the convenient preservation compiled heavy caliber and the small-bore size that also can write gas tube joint 1 on board exactly simultaneously, the convenient use.
The above is only preferred implementation of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the technology of the present invention principle; can also make some improvement and modification, these improve and modification also should be considered as protection domain of the present utility model.
Claims (2)
1.SF6 equipment complex loading line system, it is characterized in that: comprise a plurality ofly can connecting successively the gas tube joint (1) that bore reduces gradually, the bore difference at described gas tube joint (1) two ends, the end that gas tube joint (1) bore is large is provided with internal thread, and the end that gas tube joint (1) bore is little is provided with outside thread.
2. SF6 equipment complex loading line system according to claim 1 is characterized in that: described SF6 equipment complex loading line system also includes the casing that above-mentioned gas tube joint (1) is installed; Be disposed with from big to small the groove of laying above-mentioned gas tube joint (1) in casing, the other volume board that is provided with each gas tube joint (1) of described groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320347357 CN203348769U (en) | 2013-06-18 | 2013-06-18 | SF6 equipment comprehensive inflating pipeline system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320347357 CN203348769U (en) | 2013-06-18 | 2013-06-18 | SF6 equipment comprehensive inflating pipeline system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203348769U true CN203348769U (en) | 2013-12-18 |
Family
ID=49748669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320347357 Expired - Fee Related CN203348769U (en) | 2013-06-18 | 2013-06-18 | SF6 equipment comprehensive inflating pipeline system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203348769U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104235534A (en) * | 2014-08-29 | 2014-12-24 | 苏州福润机械有限公司 | Connector applied to valve |
CN111578022A (en) * | 2020-04-02 | 2020-08-25 | 中国科学院空天信息创新研究院 | Aerify decompression rapid disassembly structure |
-
2013
- 2013-06-18 CN CN 201320347357 patent/CN203348769U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104235534A (en) * | 2014-08-29 | 2014-12-24 | 苏州福润机械有限公司 | Connector applied to valve |
CN111578022A (en) * | 2020-04-02 | 2020-08-25 | 中国科学院空天信息创新研究院 | Aerify decompression rapid disassembly structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206377367U (en) | A kind of electrical equipment Petrochemical Pipe Joints easy to disassemble with installing | |
CN104235544A (en) | Magnetic connecting elbow pipe | |
CN203348769U (en) | SF6 equipment comprehensive inflating pipeline system | |
CN203394560U (en) | Pipeline system capable of implementing remote liquid supply of hydraulic bracket | |
CN203549271U (en) | Bonded-type leakage-stopping set | |
CN204649491U (en) | A kind of New type of S F 6multi-purpose gas way adapter | |
CN103277621A (en) | Polyethylene pipe fast connector | |
CN104791571A (en) | Universal gas sampling connector | |
CN204592704U (en) | A kind of pipeline sand holes leak stoppage device | |
CN203434309U (en) | Connecting clamp | |
CN203348799U (en) | Fast adapter system of oil changing pipeline of transformer | |
CN204283238U (en) | A kind of petroleum sleeve joint | |
CN205173763U (en) | Compressor mouth of pipe quick change coupler | |
CN203644508U (en) | Combined transformer oil injection set | |
CN204729806U (en) | A kind of pipeline is tightly connected device | |
CN204165692U (en) | A kind of dismountable tensimeter and pressure unit joint | |
CN103855636B (en) | Isolating switch moving contact dismantling device | |
CN203150192U (en) | Water-cooling cable convenient to overhaul | |
CN203258231U (en) | Direct-through pipe connector | |
CN207364665U (en) | The cleaning of pipeline and low pressure gas check | |
CN102735550A (en) | Built-in type lossless high-pressure rapid pressure device for pipeline | |
CN203461805U (en) | Fast gun replacing device for oiling testing machine | |
CN203231079U (en) | Fast gas-filling device of SF6 switch | |
CN205342992U (en) | Hydraulic pressure pipe joints extracting tool | |
CN206770825U (en) | Quick-mountable pipe jointer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131218 Termination date: 20170618 |
|