CN203347076U - Steel and concrete flitch beam - Google Patents

Steel and concrete flitch beam Download PDF

Info

Publication number
CN203347076U
CN203347076U CN 201320335527 CN201320335527U CN203347076U CN 203347076 U CN203347076 U CN 203347076U CN 201320335527 CN201320335527 CN 201320335527 CN 201320335527 U CN201320335527 U CN 201320335527U CN 203347076 U CN203347076 U CN 203347076U
Authority
CN
China
Prior art keywords
steel
concrete
flitch
girder
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320335527
Other languages
Chinese (zh)
Inventor
侯兆新
龚超
杨怡婷
张秀湘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Original Assignee
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Building and Construction Co Ltd MCC Group, China Jingye Engineering Corp Ltd filed Critical Central Research Institute of Building and Construction Co Ltd MCC Group
Priority to CN 201320335527 priority Critical patent/CN203347076U/en
Application granted granted Critical
Publication of CN203347076U publication Critical patent/CN203347076U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a steel and concrete flitch beam, and mainly provides a hollow flat beam and the steel and concrete flitch beam comprising the hollow flat beam. The steel and concrete flitch beam comprises the hollow flat beam, a prefabricated concrete plank and a concrete stacked layer. The prefabricated concrete plank and the concrete stacked layer are arranged on the two symmetrical sides of the hollow flat beam respectively in a lap joint mode. The hollow flat beam comprises a plurality of webs, an upper flange plate and a lower flange plate. The upper flange plate and the lower flange plate are connected with the webs, and the webs are arrayed at intervals in the length direction of the upper flange plate and the lower flange plate. The steel and concrete flitch beam is wide in application, good in economy, and convenient to construct.

Description

The steel concrete flitch girder
Technical field
The utility model relates to a kind of steel concrete flitch girder.
Background technology
In steel building, girder steel is important supporting member, at present the solid web section forms such as i iron, hot rolled H-shaped, welded H section steel that adopt more.On solid web section form basis, successively developed the Honeycombed section beam both at home and abroad, Honeycomb Beam is the novel beam that welding combines again of shifting one's position after being cut by certain broken line on H type web.Honeycomb Beam has significantly improved the Rigidity and strength of beam, and the situation underbeam alleviated in the beam dead weight can bear larger load, is applied to larger span, saves steel, transportation mounting cost, and very considerable economic worth is arranged.The hole of Honeycomb Beam web is not only attractive in appearance but also be convenient to lay pipeline, can reduce the building floor height, reduces on the whole construction cost.According to the foreign data introduction, with Honeycomb Beam, replace solid web girder can save steel 25%~50%, save paint and transportation mounting cost 15%~34.6%.But Honeycomb Beam at present, adopt hot rolled H-shaped processing and fabricating to form, the specification Honeycomb Beam edge of a wing thickness and the web thickness that are limited to H shaped steel can not carry out Optimum Matching according to stressed needs, and the processing relative complex.
In structure of steel structure building, building cover structure adopts profiled sheet Combined concrete plate-girder more, and this plate-girder system has short construction period, and field operation is convenient, and building integral is better than the advantages such as prefabricated assembled flooring; But also have the floor structure height large, the out-of-flatness of superstructure soffit need be done furred ceiling, need do fire prevention at the bottom of the profiled sheet plate and process, the shortcomings such as fire retardant anticorrosion expense height.And in highrise building, equipment pipe laying and longitudinal and transverse frame crossbeam due to layer top, all need certain floor height, in Designing Structures of High Rising Buildings, often because of floor height, limit or increase the requirement of the aspects such as clear height, the depth of section that needs the reduce beam, traditional building cover structure is because structure height can not meet the demands more greatly, in order to meet engineering demand just in the urgent need to the development of new Structural Floor System.
The utility model content
For the problems referred to above, the utility model purpose provides a kind of and is widely used, comprehensive benefit is good, in inheriting tradition profiled sheet combination building advantage, and have that structure height is little, the superstructure soffit is smooth without furred ceiling, fire retardant anticorrosion cost saving, room layout, in steel concrete flitch girder structure and this structure, is widely used flexibly, economic performance is good, when inheriting the Honeycomb Beam advantage, there is better economy, and process the flat beam of easy empty stomach.
For achieving the above object, the utility model steel concrete flitch girder, the precast concrete plank and the concrete folding layer that comprise the flat beam of empty stomach and be overlapped on the symmetrical both sides of the flat beam of described empty stomach, the flat beam of wherein said empty stomach comprises some webs, the top flange plate be connected with described web respectively and bottom wing listrium, and described web is along the length direction arranged with interval of described upper and lower frange plate.
Further, described precast concrete plank is overlapped on the two ends of the bottom flange steel plate of girder steel.
Further, also comprise the two-way concrete slab net of building in the concrete folding layer, the hole on the gap between described web or described web.
Further, web is one or more in H shaped steel, work shaped steel or box steel.
Especially, the width of described bottom wing listrium is more than or equal to the width of top flange plate.
Further, described web equidistantly is arranged in parallel.
Particularly, described web plate section direction is along arranging perpendicular to upper and lower frange plate length direction.
Preferably, described web and described upper and lower frange plate connect by being weldingly connected.
1, the flat beam of empty stomach in the utility model steel concrete flitch girder, the hole of web is not only attractive in appearance but also be convenient to lay pipeline, can reduce the building floor height, reduces on the whole construction cost.
2, the flat beam of empty stomach in the utility model steel concrete flitch girder is compared with solid web girder, and deadweight is lighter, supporting capacity is higher; With composite roof truss, compare, architectural construction is simpler, and antiseptic property is better.
3, the flat beam of empty stomach in the utility model steel concrete flitch girder is compared with Honeycomb Beam, and easy to process, steel using amount is economized.
4, the utility model steel concrete flitch girder has short construction period, and field operation is convenient, and building integral is better than the advantages such as prefabricated assembled flooring.
5, the hole of the utility model steel concrete flitch girder web is not only attractive in appearance but also be convenient to lay pipeline, can reduce the building floor height, reduces on the whole construction cost.
6, the utility model steel concrete flitch girder structure height is less, in building height one regularly, can increase building storey, in building floor height and the number of plies one timing, can reduce building height.
7, it is smooth without the many advantages such as furred ceiling, fire retardant anticorrosion cost saving, room layout be flexible that the utility model steel concrete flitch girder has the superstructure soffit.
The accompanying drawing explanation
Fig. 1 is the structural representation that the web of the flat beam of empty stomach in the utility model steel concrete flitch girder adopts i shaped steel;
Fig. 2 is the lateral view of Fig. 1;
The elevation that Fig. 3 is Fig. 1;
The lateral view when web that Fig. 4 is the flat beam of empty stomach in the utility model steel concrete flitch girder adopts box-type section;
Fig. 5 is the utility model steel concrete flitch girder schematic diagram;
The lateral view that Fig. 6 is Fig. 5.
The specific embodiment
Below in conjunction with Figure of description, the utility model is further described.
Embodiment 1
As shown in Figures 1 to 4, the flat beam of empty stomach in the present embodiment steel concrete flitch girder, be welded by top flange steel plate 11, bottom flange steel plate 12, shape steel web 13.
Choose upper bottom flange steel plate width, thickness and grade of steel according to designing requirement, choose cross section, length, spacing and the grade of steel of shape steel web according to designing requirement.To after the unwrapping wire of hot rolled steel plate location, cutting out the bottom flange steel plate, web shaped steel is cut into to segment according to design length in factory.After web shaped steel is located on the web of top flange, welding, after having welded, for ease of web shaped steel and bottom flange Plate Welding, turn over and turn 90 degrees, welding after positioning on the steel plate of bottom flange.
The utility model can be used as a kind of more economical replacement scheme of Honeycomb Beam, can be widely used in the engineerings such as bridge, factory building, office building, steamer and crane bridge.
As illustrated in Figures 5 and 6, the present embodiment steel concrete flitch girder, comprise flat beam 1, precast concrete plank 2, two-way concrete slab net 3 and cast-in-situ concrete overlapping layers 4 on an empty stomach.
Choose upper bottom flange steel plate width, thickness, grade of steel according to designing requirement, choose cross section, length, spacing and the grade of steel of shape steel web according to designing requirement.To after the unwrapping wire of hot rolled steel plate location, cutting out the bottom flange steel plate, web shaped steel is cut into to segment according to design length in factory.After web shaped steel is located on the web of top flange, welding, after having welded, for ease of web shaped steel and bottom flange Plate Welding, turn over and turn 90 degrees, and after positioning on the steel plate of bottom flange, welding obtains flat beam 1 on an empty stomach.On an empty stomach flat beam 1 after installation in position, is laid precast concrete plank 2 on an empty stomach flat lower flange of girder edge bilateral symmetry at the construction field (site).After precast concrete plank 2 has been laid, on-the-spot colligation two-way concrete slab net 3.After 3 colligations of two-way concrete slab net complete, cast-in-situ concrete overlapping layers 4 forms Novel steel Combined concrete plate-girder floor system.
A kind of Novel steel Combined concrete plate-girder of the present utility model can be used as the better replacement scheme of a kind of comprehensive benefit of traditional profiled sheet flitch girder, can be widely used in the structure of steel structure building building cover structure.
Above; it is only preferred embodiment of the present utility model; but protection domain of the present utility model is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement, within all should being encompassed in protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain that claim was defined.

Claims (7)

1. a steel concrete flitch girder, it is characterized in that: the precast concrete plank and the concrete folding layer that comprise the flat beam of empty stomach and be overlapped on the symmetrical both sides of the flat beam of described empty stomach, the flat beam of wherein said empty stomach comprises some webs, the top flange plate be connected with described web respectively and bottom wing listrium, and described web is along the length direction arranged with interval of described upper and lower frange plate.
2. steel concrete flitch girder according to claim 1, is characterized in that, described precast concrete plank is overlapped on the two ends of the bottom flange steel plate of girder steel.
3. steel concrete flitch girder according to claim 1, is characterized in that, also comprises the two-way concrete slab net of building in the concrete folding layer, the hole on the gap between described web or described web.
4. steel concrete flitch girder according to claim 1, it is characterized in that: the width of described bottom wing listrium is more than or equal to the width of top flange plate.
5. steel concrete flitch girder according to claim 1, it is characterized in that: described web equidistantly is arranged in parallel.
6. steel concrete flitch girder according to claim 1 is characterized in that: described web plate section direction is along arranging perpendicular to upper and lower frange plate length direction.
7. steel concrete flitch girder according to claim 1, it is characterized in that: described web and described upper and lower frange plate connect by being weldingly connected.
CN 201320335527 2013-06-09 2013-06-09 Steel and concrete flitch beam Expired - Fee Related CN203347076U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320335527 CN203347076U (en) 2013-06-09 2013-06-09 Steel and concrete flitch beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320335527 CN203347076U (en) 2013-06-09 2013-06-09 Steel and concrete flitch beam

Publications (1)

Publication Number Publication Date
CN203347076U true CN203347076U (en) 2013-12-18

Family

ID=49746992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320335527 Expired - Fee Related CN203347076U (en) 2013-06-09 2013-06-09 Steel and concrete flitch beam

Country Status (1)

Country Link
CN (1) CN203347076U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276848A (en) * 2013-06-09 2013-09-04 中冶建筑研究总院有限公司 Open-web flat beam, as well as steel concrete flitch beam and construction method thereof
CN104532997A (en) * 2014-12-26 2015-04-22 宝钢建筑***集成有限公司 Assembly type floor system and construction method thereof
CN105064511A (en) * 2015-08-12 2015-11-18 浙江绿筑建筑***集成有限公司 Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103276848A (en) * 2013-06-09 2013-09-04 中冶建筑研究总院有限公司 Open-web flat beam, as well as steel concrete flitch beam and construction method thereof
CN103276848B (en) * 2013-06-09 2016-04-27 中冶建筑研究总院有限公司 Open-web flat beam, steel concrete flitch girder and construction method thereof
CN104532997A (en) * 2014-12-26 2015-04-22 宝钢建筑***集成有限公司 Assembly type floor system and construction method thereof
CN105064511A (en) * 2015-08-12 2015-11-18 浙江绿筑建筑***集成有限公司 Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof

Similar Documents

Publication Publication Date Title
CN204386002U (en) A kind of precast assemble floor system
CN103276849B (en) Honeycomb Beam, Combined concrete plate-girder and method for designing
CN104532997A (en) Assembly type floor system and construction method thereof
CN201347598Y (en) Casting formwork component for construction
CN203347077U (en) Steel and concrete flitch beam
CN103276795B (en) Steel-concrete slab-column structure system
CN103255877A (en) Assembling type pre-stress honeycombed ribbed web steel beam
CN103485476A (en) Assembly type corrugated web holding-on H shaped steel composite beam
CN108360725B (en) Z-shaped connection section steel concrete deformed column-invisible beam floor slab assembly system
CN109797871B (en) Double-steel-plate composite shear wall connected by supporting angle steel and composite floor slab connecting node
CN104100037A (en) Combined flat beam
CN203383333U (en) Connection node of steel beam and H-shaped steel column and connection structure of plate beam and H-shaped steel column
CN105649249A (en) Bidirectional profiled steel sheet and concrete composite floor slab internally provided with hollow circular steel pipes
CN103485479A (en) Assembly type prestress honeycombed web composite beam
CN203347076U (en) Steel and concrete flitch beam
CN103276848B (en) Open-web flat beam, steel concrete flitch girder and construction method thereof
CN103485483A (en) Assembly type honeycombed web composite beam
CN203487676U (en) Honeycomb steel hidden beam composite floor system
CN103452219A (en) Honeycomb steel hidden beam composite floor system
CN203347007U (en) Steel-concrete slab-column structure system
CN211172402U (en) Assembled light steel structure house
CN219622069U (en) Assembled light steel strip hollow steel bar truss concrete strip superposed two-way floor slab
CN203701388U (en) Composite floor
CN203347105U (en) Open-web flat beam
CN103510649B (en) The light steel fire-proof composite floor structure of a kind of prefabrication and assembly construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131218

Termination date: 20210609