CN203320457U - Rigid-flexible concrete anti-collision guardrail - Google Patents

Rigid-flexible concrete anti-collision guardrail Download PDF

Info

Publication number
CN203320457U
CN203320457U CN2013203320958U CN201320332095U CN203320457U CN 203320457 U CN203320457 U CN 203320457U CN 2013203320958 U CN2013203320958 U CN 2013203320958U CN 201320332095 U CN201320332095 U CN 201320332095U CN 203320457 U CN203320457 U CN 203320457U
Authority
CN
China
Prior art keywords
steel
steel pipe
concrete panel
roadbed
guard bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203320958U
Other languages
Chinese (zh)
Inventor
鲁智君
王剑波
陈宏伟
金尧
杨吉春
金焕庆
祝仲龙
周一勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou xiaoshan road and bridge engineering department
Original Assignee
Hangzhou xiaoshan road and bridge engineering department
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou xiaoshan road and bridge engineering department filed Critical Hangzhou xiaoshan road and bridge engineering department
Priority to CN2013203320958U priority Critical patent/CN203320457U/en
Application granted granted Critical
Publication of CN203320457U publication Critical patent/CN203320457U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a rigid-flexible concrete anti-collision guardrail, and relates to road traffic safety facilities. The rigid-flexible concrete anti-collision guardrail is composed of a road bed, a cement stabilized base, a pavement, a reinforced concrete panel, a steel pipe and the like. According to the concrete anti-collision guardrail with a steel pipe structure, the lower end of the steel pipe is arranged in the road bed and the cement stabilized base, and the upper end of the steel pipe is poured with the reinforced concrete panel together. As the steel pipe structure is arranged in the concrete anti-collision guardrail, the concrete anti-collision guardrail organically combines the rigid characteristic of a reinforced concrete anti-collision guardrail and the flexible characteristic of a waveform anti-collision guardrail to make the best of the both anti-collision guardrails and combine rigidity and flexibility, the safety performance of the anti-collision guardrail is increased, and the degree of damage of vehicle collision is also reduced. The concrete anti-collision guardrail is practical, safe and economic and can effectively ensure the safety of highway operation and reduce the loss of traffic accidents.

Description

Hard and soft property concrete anti-collision guard bar
Technical field
The utility model relates to a kind of highway subgrade steel concrete anticollision barrier, refers in particular to a kind of have rigidity and the flexible steel concrete anticollision barrier in conjunction with feature.
Background technology
Anticollision barrier is a kind of traffic safety facilities that is widely used in highway and bridge, and it is divided into the steel concrete anticollision barrier of rigidity and flexible waveform anticollision barrier usually.The rigidity anticollision barrier is generally made by Reinforced Concrete Materials, it is mainly used on bridge, strength and stiffness are very large, during Vehicular impact rigidity anticollision barrier, anticollision barrier can not be subjected to displacement and make vehicle produce buffering, therefore vehicle generally can not fall below bridge floor, but can cause damaged vehicle serious.The flexible protection guardrail generally is comprised of steel pipe pile and corrugated sheet, is mainly used on roadbed, and strength and stiffness are generally little, and when dilly clashes into, anticollision barrier can be subjected to displacement and make vehicle produce buffering, therefore can reduce the damaged vehicle degree; But, when large heavy vehicle clashes into, the flexible protection guardrail, by badly damaged, is difficult to prevent that vehicle from falling to road surface or below bridge floor when having an accident, and will cause heavy losses.Above-mentioned two kinds of anticollision barriers respectively have pluses and minuses, for the flexible characteristic of the rigidity characteristic by the steel concrete anticollision barrier and waveform anticollision barrier combines, learn from other's strong points to offset one's weaknesses, only have to adopt and there is rigidity and the flexible steel concrete anticollision barrier in conjunction with feature, could both improve the security performance of anticollision barrier, reduce again the extent of damage of Vehicular impact.
Summary of the invention
Technical problem to be solved in the utility model is to overcome the defect of prior art and a kind of practicality is provided, safe, economical has rigidity and a flexible hard and soft property concrete anti-collision guard bar in conjunction with feature, ensures the highway safety operation, reduces Traffic Accident Loss.
Technical problem of the present utility model is achieved through the following technical solutions:
A kind of hard and soft property concrete anti-collision guard bar, comprise roadbed, cement stabilized base course, road surface and steel concrete panel, described concrete anti-collision guard bar also comprises steel pipe, and this steel pipe lower end is squeezed in roadbed and cement stabilized base course, and upper end and steel concrete panel are built one.
The integrative-structure of building of described steel pipe upper end and steel concrete panel is at the assembling reinforcement of steel pipe upper end, concreting.
Described steel pipe is the steel hollow section, external diameter 130 ~ 150mm, wall thickness 4 ~ 5mm, length 2 ~ 3m; The length that described steel pipe lower end is squeezed in roadbed and cement stabilized base course is 1 ~ 2m, and the length that steel pipe upper end and steel concrete panel are built one is 1/2 ~ 2/3 of steel concrete panel height.
Described steel concrete panel is the segmented steel concrete panel extended along road direction, the length of every section steel concrete panel is 3 ~ 4m, be equipped with 3 ~ 4 steel pipes in every section steel concrete panel, between every adjacent two sections steel concrete panels, the partitioning slot of reserved 1 ~ 2cm, all fill yielding material in each partitioning slot.
Described steel concrete panel bottom is provided with a plurality of horizontal spilled water holes that tilt to shoulder, and the aperture of each horizontal spilled water hole is 3 ~ 5cm, and the spacing between adjacent two horizontal spilled water holes is 1.5 ~ 2m.
Described road surface is provided with along both sides along the cross fall of shoulder inclination.
The edge of described roadbed is provided with side slope.
Compared with prior art, the utility model is mainly a kind of concrete anti-collision guard bar with steel tubular structure, it is that the steel pipe lower end is squeezed in roadbed and cement stabilized base course, upper end and steel concrete panel are built one, by interior steel tubular structure made this concrete anti-collision guard bar the organically combine rigidity characteristic of steel concrete anticollision barrier and the flexible characteristic of waveform anticollision barrier established, learn from other's strong points to offset one's weaknesses, temper toughness with gentleness, both improved the security performance of anticollision barrier, reduced again the extent of damage of Vehicular impact, it is also a kind of practicality, safety, economic concrete anti-collision guard bar, the operation of effective guarantee highway safety, reduce Traffic Accident Loss.
The accompanying drawing explanation
Fig. 1 is facade structures schematic diagram of the present utility model.
Fig. 2 is side structure schematic diagram of the present utility model.
The specific embodiment
Below will to the utility model embodiment, elaborate again by above-mentioned accompanying drawing.
As shown in Figure 1 and Figure 2,1. roadbed, 2. cement stabilized base course, 3. road surface, 4. steel concrete panel, 5. steel pipe, 6. laterally spilled water hole, 7. side slope, 8. partitioning slot.
Hard and soft property concrete anti-collision guard bar, it is a kind of traffic safety facilities, mainly comprise highway roadbed 1, be laid on the cement stabilized base course 2 on roadbed and be laid on the road surface 3 on cement stabilized base course, on the cement stabilized base course 2 of pavement edge, steel concrete panel 4 is set again.
Described roadbed 1 is to fill to the requirement height by design, and possesses the supporting capacity of regulation, and this shoulder is provided with side slope 7, and side slope is necessarily processed, so that roadbed 1 can reach overall stability; Described cement stabilized base course 2 has some strength and rigidity, mainly as the basis of steel concrete panel 4, bears vertical load and horizontal loading simultaneously; Described road surface 3 is load-carrying members of vehicle pass-through, and these 3 surfaces, road surface are provided with along the cross fall of roadbed 1 edge tilt, to facilitate the ponding rapid drainage on road surface.
Squeeze into steel pipe 5 in described roadbed 1 and cement stabilized base course 2, this steel pipe is the steel hollow section, its specification quantity is determined according to road quality classification and highway subgrade geological conditions, general external diameter 130~150mm, wall thickness 4~5mm, length 2~3mm, the length that steel pipe 5 lower ends are squeezed in roadbed 1 and cement stabilized base course 2 is 1 ~ 2m; Steel pipe 5 upper ends are stretched out cement stabilized base course 2 and are exposed, this upper end is by assembling reinforcement and concreting, thereby form the steel concrete panel 4 of building one with steel pipe 5 upper ends, steel pipe 5 upper end length are 1/2 ~ 2/3 of steel concrete panel 4 height, mainly bear the vertical force of steel concrete panel 4 and the horizontal force action of Vehicular impact.
4 of described steel concrete panels are on cement stabilized base course 2, and be set to along the segmented steel concrete panel 4 of road direction extension, every section steel concrete panel 4 all has independent collision prevention function, and its specification is definite according to road quality classification, and length is generally 3 ~ 4m; Be equipped with 3 ~ 4 steel pipes in every section steel concrete panel 4, the partitioning slot 8 of reserved 1 ~ 2cm between every adjacent two sections steel concrete panels 4, the yielding materials such as the interior all filled bitumens of each partitioning slot, to reduce by every section frictional resistance between steel concrete panel 4 and to increase aesthetic measure.The Main Function of partitioning slot 8 is: one, make to reduce integral rigidity after 4 segmentations of steel concrete panel, increase flexibility, and have independent collision prevention function; Two, reduce thermal (temperature difference) stress, guaranteed the quality of steel concrete panel 4; Three, avoid roadbed 1 differential settlement to bring the settlement crack of steel concrete panel 4.
The bottom of described steel concrete panel 4 is provided with a plurality of horizontal spilled water holes 6 that tilt at an angle to roadbed 1 edge, each horizontal spilled water hole 6 is all transverse drainage facilities of setting separated by a distance between steel concrete panel 4 and cement stabilized base course 2, the aperture of each horizontal spilled water hole 6 is 3 ~ 5cm, and the spacing between adjacent two horizontal spilled water holes 6 is 1.5 ~ 2m.The road surface 3 ponding mainly road surface 3 by having cross fall, to roadbed 1 edge-diffusion, then drain into roadbed side slope 7 by a plurality of horizontal spilled water hole 6 of steel concrete panel 4 bottoms fast.
This concrete anti-collision guard bar combines the rigid function of steel concrete panel 4 and the flexibility function of steel pipe 5, learns from other's strong points to offset one's weaknesses, and tempers toughness with gentleness.When Vehicular impact steel concrete panel 4, steel concrete panel 4 is easy deformed damaged unlike corrugated sheet; Simultaneously, due to the flexibility effect of steel pipe 5, make steel pipe after being impacted 5 produce elastic deformations, but and allow every section steel concrete panel 4 generating horizontal displacements, thereby make accident vehicle produce cushioning effect, to reduce vehicle and occupant's damage; When removing vehicle impact, as steel pipe 5 distortion, within elastic range, steel concrete panel 4 can arrive original straight state by immediate recovery again.
Embodiment described in the utility model only is not used in restriction scope of the present utility model for the utility model is described.Should be understood that in addition, after having read content described in the utility model, those skilled in the art can make various changes or modifications the utility model, these equivalent form of values fall within the application's appended claims limited range equally.

Claims (7)

1. a hard and soft property concrete anti-collision guard bar, comprise roadbed (1), cement stabilized base course (2), road surface (3) and steel concrete panel (4), it is characterized in that described concrete anti-collision guard bar also comprises steel pipe (5), this steel pipe lower end is squeezed in roadbed (1) and cement stabilized base course (2), and upper end and steel concrete panel (4) are built one.
2. hard and soft property concrete anti-collision guard bar according to claim 1, is characterized in that the integrative-structure of building of described steel pipe (5) upper end and steel concrete panel (4) is at steel pipe (5) upper end assembling reinforcement, concreting.
3. hard and soft property concrete anti-collision guard bar according to claim 1, is characterized in that described steel pipe (5) is the steel hollow section, external diameter 130 ~ 150mm, wall thickness 4 ~ 5mm, length 2 ~ 3m; The length that described steel pipe (5) lower end is squeezed in roadbed (1) and cement stabilized base course (2) is 1 ~ 2m, and the length that steel pipe (5) upper end and steel concrete panel (4) are built one is 1/2 ~ 2/3 of steel concrete panel height.
4. hard and soft property concrete anti-collision guard bar according to claim 1, it is characterized in that the segmented steel concrete panel of described steel concrete panel (4) for extending along road direction, the length of every section steel concrete panel (4) is 3 ~ 4m, be equipped with 3 ~ 4 steel pipes (5) in every section steel concrete panel, between every adjacent two sections steel concrete panels (4), the partitioning slot (8) of reserved 1 ~ 2cm, all fill yielding material in each partitioning slot.
5. hard and soft property concrete anti-collision guard bar according to claim 1, it is characterized in that described steel concrete panel (4) bottom is provided with a plurality of horizontal spilled water holes (6) to roadbed (1) edge tilt, the aperture of each horizontal spilled water hole is 3 ~ 5cm, and the spacing between adjacent two horizontal spilled water holes (6) is 1.5 ~ 2m.
6. hard and soft property concrete anti-collision guard bar according to claim 1, is characterized in that surface, described road surface (3) is provided with along both sides along the cross fall of roadbed (1) edge tilt.
7. according to the described hard and soft property concrete anti-collision guard bar of claim 1 ~ 6 any one, it is characterized in that the edge of described roadbed (1) is provided with side slope (7).
CN2013203320958U 2013-06-09 2013-06-09 Rigid-flexible concrete anti-collision guardrail Expired - Fee Related CN203320457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203320958U CN203320457U (en) 2013-06-09 2013-06-09 Rigid-flexible concrete anti-collision guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203320958U CN203320457U (en) 2013-06-09 2013-06-09 Rigid-flexible concrete anti-collision guardrail

Publications (1)

Publication Number Publication Date
CN203320457U true CN203320457U (en) 2013-12-04

Family

ID=49659823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203320958U Expired - Fee Related CN203320457U (en) 2013-06-09 2013-06-09 Rigid-flexible concrete anti-collision guardrail

Country Status (1)

Country Link
CN (1) CN203320457U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386317A (en) * 2017-07-03 2017-11-24 浙江大学城市学院 Foam concrete lightweight barricade and construction method are excavated after a kind of first precompressed of deep ultra-soft soil
CN109356057A (en) * 2018-12-10 2019-02-19 潘晓东 A kind of Expressway Central Strip lower-rigid-upper-flexible combined anti-collision guard rail

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386317A (en) * 2017-07-03 2017-11-24 浙江大学城市学院 Foam concrete lightweight barricade and construction method are excavated after a kind of first precompressed of deep ultra-soft soil
CN109356057A (en) * 2018-12-10 2019-02-19 潘晓东 A kind of Expressway Central Strip lower-rigid-upper-flexible combined anti-collision guard rail
CN109356057B (en) * 2018-12-10 2024-03-01 潘晓东 Rigid-flexible combined anti-collision guardrail under central dividing strip of expressway

Similar Documents

Publication Publication Date Title
CN110670433B (en) Construction structure for constructing road on soft soil foundation
CN104727235B (en) Bridge integral reinforcing device
KR101633431B1 (en) Expandable bridge sidewalk and it's construction method
CN103452130B (en) The deformed bar net board-like barricade of reinforcement earth pillar
CN104153311B (en) A kind of highway barrier bracing means and reinforcement means thereof
CN205772854U (en) The walking track of a kind of gantry crane lifting steel truss girder sections supports
CN203320457U (en) Rigid-flexible concrete anti-collision guardrail
CN204125872U (en) A kind of highway barrier bracing means
CN103966947A (en) Beam-falling-resistant device based on bridge beam shock absorption
CN206828906U (en) A kind of temporary pavement bedding structure for Metro Deep Excavation
KR101068299B1 (en) the structure for transit of vehicles in pulling up bridge and the construction method therewith
CN210341519U (en) Soft soil roadbed reinforcing device
JP6013701B2 (en) Bridge
CN207228152U (en) A kind of H type pile plate wall for reinforcing unstable slope
JPS6012484B2 (en) road protection barrier
CN205742080U (en) A kind of safeguard structure for hydroelectric project
CN211312174U (en) Flexible swing type abutment structure suitable for integral bridge
CN108049421A (en) A kind of H type pile plate wall for reinforcing unstable slope
CN111274647B (en) Gravity balance anti-arching structure for expansive soil cutting of high-speed railway and design method
CN109024266B (en) Central separation belt concrete wall type guardrail connecting structure meeting double-bridge settlement difference and construction method
CN216689183U (en) Seat type reinforced concrete protective guardrail for highway subgrade section
CN213804950U (en) Active service bridge passage widening structure
CN204626426U (en) Pile foundation cap combines anti-selection structure
CN211735058U (en) Concrete anti-collision guardrail with steel pipe pile foundation
CN204875494U (en) Scalable abutment of plain type suitable for bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204

Termination date: 20200609

CF01 Termination of patent right due to non-payment of annual fee