CN203284774U - 一种用于复合地基处理的刚性桩 - Google Patents
一种用于复合地基处理的刚性桩 Download PDFInfo
- Publication number
- CN203284774U CN203284774U CN2013203141110U CN201320314111U CN203284774U CN 203284774 U CN203284774 U CN 203284774U CN 2013203141110 U CN2013203141110 U CN 2013203141110U CN 201320314111 U CN201320314111 U CN 201320314111U CN 203284774 U CN203284774 U CN 203284774U
- Authority
- CN
- China
- Prior art keywords
- pile
- cap bag
- rigid pile
- rigid
- longitudinal rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203141110U CN203284774U (zh) | 2013-06-03 | 2013-06-03 | 一种用于复合地基处理的刚性桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203141110U CN203284774U (zh) | 2013-06-03 | 2013-06-03 | 一种用于复合地基处理的刚性桩 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203284774U true CN203284774U (zh) | 2013-11-13 |
Family
ID=49541146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013203141110U Expired - Lifetime CN203284774U (zh) | 2013-06-03 | 2013-06-03 | 一种用于复合地基处理的刚性桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203284774U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266595A (zh) * | 2013-06-03 | 2013-08-28 | 建华建材(中国)投资有限公司 | 一种用于复合地基处理的刚性桩及其生产方法 |
CN106088082A (zh) * | 2016-08-03 | 2016-11-09 | 浙江大学建筑设计研究院有限公司 | 采用可位移式套筒连接的复合配筋先张法预应力混凝土桩 |
CN106968244A (zh) * | 2017-02-21 | 2017-07-21 | 南昌大学 | 一种frp管与半预制半现浇再生混凝土预应力叠合桩基础及制备方法 |
-
2013
- 2013-06-03 CN CN2013203141110U patent/CN203284774U/zh not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266595A (zh) * | 2013-06-03 | 2013-08-28 | 建华建材(中国)投资有限公司 | 一种用于复合地基处理的刚性桩及其生产方法 |
CN103266595B (zh) * | 2013-06-03 | 2016-02-24 | 建华建材(中国)投资有限公司 | 一种用于复合地基处理的刚性桩及其生产方法 |
CN106088082A (zh) * | 2016-08-03 | 2016-11-09 | 浙江大学建筑设计研究院有限公司 | 采用可位移式套筒连接的复合配筋先张法预应力混凝土桩 |
CN106968244A (zh) * | 2017-02-21 | 2017-07-21 | 南昌大学 | 一种frp管与半预制半现浇再生混凝土预应力叠合桩基础及制备方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383418B (zh) | 抗震型预制混凝土实心方桩及其生产方法 | |
CN103821677B (zh) | 装配式预应力活性粉末混凝土风电塔架 | |
CN100336649C (zh) | 一种离心法蒸汽养护制造预应力高强混凝土空心方桩的方法 | |
CN101831875A (zh) | 预应力混凝土圆柱式空心桥墩预制拼装工艺 | |
CN104416675A (zh) | 先张法预应力离心混凝土方桩的制作工艺 | |
CN202000251U (zh) | 一种预应力混凝土圆柱式空心桥墩预制结构 | |
CN202519664U (zh) | 高强钢筋增强预应力uhpc薄壁管桩构件 | |
CN105926771B (zh) | 一种装配整体式框架柱梁的中节点连接结构及其施工方法 | |
CN202990170U (zh) | 一种配置交叉斜向体内预应力的剪力墙结构 | |
CN107932700A (zh) | 预制高强混凝土桥墩及其成型模具和制造方法 | |
CN203284774U (zh) | 一种用于复合地基处理的刚性桩 | |
CN104947603A (zh) | 一种钢筋混凝土梁桥主梁加固构造及加固方法 | |
CN107435293B (zh) | 用于预制拼装桥墩的预应力frp筋张拉锚固装置及其施工方法 | |
CN103266595B (zh) | 一种用于复合地基处理的刚性桩及其生产方法 | |
CN207714114U (zh) | 一种预制高强混凝土桥墩 | |
CN113605260B (zh) | 一种采用钢纤维自应力混凝土加固石拱桥的方法 | |
CN201943070U (zh) | 增韧型预应力离心混凝土桩 | |
CN102363957A (zh) | 一种后张预应力复合抗拔桩 | |
CN102373702A (zh) | 混凝土圆桩及其加工方法 | |
CN201502181U (zh) | 先张法预应力混凝土桩及其张拉锚固件 | |
RU133548U1 (ru) | Многопустотная керамзитобетонная плита перекрытия с повышенной анкеровкой арматуры | |
CN207656905U (zh) | 一种预制高强混凝土桥墩的成型模具 | |
CN102071701A (zh) | 非预应力离心混凝土桩 | |
CN203755302U (zh) | 先张法预应力混凝土桩 | |
CN203939023U (zh) | 抗震型预制混凝土三角形实心桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 212413 Jurong City, Jiangsu Province under the town along the Yangtze River Development Zone Patentee after: JIANHUA CONSTRUCTION MATERIALS INVESTMENT CO.,LTD. Address before: 212413 Jurong City, Jiangsu Province under the town along the Yangtze River Development Zone Patentee before: ZHENJIANG JIANHUA MANAGEMENT CONSULTING CO.,LTD. |
|
CP03 | Change of name, title or address |
Address after: 212413 Jurong City, Jiangsu Province under the town along the Yangtze River Development Zone Patentee after: ZHENJIANG JIANHUA MANAGEMENT CONSULTING CO.,LTD. Address before: 212413 Jiangsu Province, Zhenjiang City, Jurong Province under the town along the Yangtze River Development Zone Patentee before: JIANHUA BUILDING MATERIAL (CHINA) INVESTMENT Co.,Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20160601 Address after: 061000 No. 10 Sunshine Avenue, Cangzhou Economic Development Zone, Hebei, Cangzhou Patentee after: Jianhua building materials (Cangzhou) Co.,Ltd. Address before: 212413 Jurong City, Jiangsu Province under the town along the Yangtze River Development Zone Patentee before: JIANHUA CONSTRUCTION MATERIALS INVESTMENT CO.,LTD. |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160914 Address after: Rugao City, Jiangsu province Nantong city 226500 Yuan Zhen Guo car Horse Lake Community Neighborhood Committee Patentee after: TONGCHI JIANHUA BUILDING MATERIAL (NANTONG) CO.,LTD. Address before: 061000 No. 10 Sunshine Avenue, Cangzhou Economic Development Zone, Hebei, Cangzhou Patentee before: Jianhua building materials (Cangzhou) Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20131113 |