CN203275986U CN2013202760749U CN201320276074U CN203275986U CN 203275986 U CN203275986 U CN 203275986U CN 2013202760749 U CN2013202760749 U CN 2013202760749U CN 201320276074 U CN201320276074 U CN 201320276074U CN 203275986 U CN203275986 U CN 203275986U
Authority
CN
China
Prior art keywords
unit
data transmission
energy
data
transmission set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202760749U
Other languages
Chinese (zh)
Inventor
吴海红
何伟
周建安
吴胜
彭羽
王雪清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG FRESHPOWER TECHNOLOGY Co Ltd
Original Assignee
ZHEJIANG FRESHPOWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG FRESHPOWER TECHNOLOGY Co Ltd filed Critical ZHEJIANG FRESHPOWER TECHNOLOGY Co Ltd
Priority to CN2013202760749U priority Critical patent/CN203275986U/en
Application granted granted Critical
Publication of CN203275986U publication Critical patent/CN203275986U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a multiple energy centralized monitoring system which comprises a multiple energy monitoring instrument, a data transmission device and an energy monitoring terminal. The data transmission device comprises a central processing unit, a key unit, a display unit, a number of communication units, a network unit and a power supply unit, wherein the key unit, the display unit, a number of communication units, the network unit and the power supply unit are connected with the central processing unit. The multiple energy monitoring instrument is respectively in wireless or wired connection with a number of communication units of the data transmission device. The data transmission device is connected with the energy monitoring terminal through the wireless or wired network unit. The data transmission device receives various types of energy data uploaded by the multiple energy monitoring instrument to realize data access standardization, carries out assembly and integration on the data, centralizes the data into a data report message, and sends the data report message to the energy monitoring terminal. According to the utility model, centralized and unified monitoring and management can be carries out on a lot of energy of different types; the installation and the debugging are convenient; management interfaces are unified; faults can be easily and timely found and timely treated; and the management efficiency is improved.

Description

The various energy resources centralized monitoring system
Technical field
The utility model relates to a kind of monitoring system, relate in particular to a kind of across a plurality of energy fields, the target energy of a plurality of energy fields (as: electricity, water, gas etc.) can be unified monitoring, realize the various energy resources centralized monitoring system of enterprise energy monitoring and automatic management.
Background technology
At present, the monitoring to electricity, water, gas equal energy source in enterprise is generally all separately carried out separately, and different measuring instruments is arranged, and connects different monitoring equipments.Also not across the concentrated monitoring equipment of a plurality of energy fields, when enterprise builds an energy management system, need to install and access by a large amount of equipment, interfaces at present, have following defective:
(1) device category is many, and the supplier of each side is many, and technical support strength is disperseed;
(2) interface is many, and debugging work load is large;
(3) administration interface disunity, the management incomplete phenomena easily occurs in Decentralization, easily neglects the trouble spot and incurs loss through delay processing opportunity, and the efficiency of management is lower.
Summary of the invention
The utility model mainly solves original monitoring to different energy sources separately to carry out separately, and device category is many, and technical support strength is disperseed, interface is many, and debugging work load is large, the administration interface disunity, Decentralization is easily neglected the trouble spot and incurs loss through delay processing opportunity, the technical matters that the efficiency of management is lower; One kind of multiple energy centralized monitoring systems are provided, it is by being converted to unified consensus standard with various energy resources equipment, multiple interfaces, can carry out centralized and unified monitoring management to different types of energy, installment and debugging is convenient, administration interface is unified, be convenient in time find fault, in time deal with, improve the efficiency of management.
Above-mentioned technical matters of the present utility model is mainly solved by following technical proposals: the utility model comprises various energy resources measuring instrument, data transmission set and energy monitor terminal, described various energy resources measuring instrument is or wired be connected wireless with described data transmission set respectively, and described data transmission set is connected with described energy monitor terminal by wireless network or cable network.Data transmission set has a lot of interfaces, to adapt to the connection needs of variety classes energy monitoring instrument.Each energy monitoring instrument, no matter be identical type or different types of, the energy source data that all will collect sends to data transmission set, by data transmission set, these data are assembled and integrated, be concentrated into data that comprise all energy monitoring data and report message, then send to the energy monitor terminal that is positioned at far-end.The energy position that the energy monitoring instrument is monitored as required is arranged on the different local of plant area, and data transmission set also is arranged in plant area, the energy monitor terminal generally be arranged in the management building of enterprise or upper management department in.Therefore, pass through the utility model, can make related management person carry out centralized and unified monitoring management to a large amount of different types of energy, installment and debugging is convenient, administration interface is unified, is convenient in time find fault, in time deal with, and improves the efficiency of management, guarantee effectively that enterprise produces and normally carry out, improve the security of producing.
As preferably, described data transmission set comprises that CPU (central processing unit), push-button unit, display unit, a plurality of communication unit, network element reach the power supply unit that operating voltage is provided for whole data transmission set, and push-button unit, display unit, a plurality of communication unit and network element are connected with described CPU (central processing unit) respectively.A plurality of communication units can be identical type, can be also different types of, can be wired, can be also wireless, to be fit to the needs of various energy resources measuring instrument, are convenient to install and be connected.Display unit adopts LCDs, also can adopt liquid crystal touch screen to realize push-button unit and display unit, with reduced volume.data transmission set receives by communication unit the energy source data that the energy monitoring instrument is uploaded, by CPU (central processing unit) with various energy resources equipment, multiple interfaces is converted to unified consensus standard, communication unit is carried out Dynamic Definition, comprise baud rate, check bit, communication protocol, data message resolution rules etc., realize the standardization of data access, and these data are assembled and integrated, be concentrated into one and comprise all energy monitoring data, the data of each energy monitoring instrument kind sign and identify label report message, by network element, these data are reported message to send to be positioned at again the energy monitor terminal of far-end.
As preferably, described a plurality of communication units comprise Zigbee communication unit and a plurality of 485 communication interface units.Data transmission set carries out data communication by the Zigbee communication unit with the energy monitoring instrument of Zigbee communication unit, carries out data communication by 485 communication interface units with the energy monitoring instrument of 485 communication interfaces.
As preferably, described network element is Ethernet unit and/or GPRS unit.Network element can adopt the Ethernet unit, also can adopt the GPRS unit, and preferred version is that existing Ethernet unit also has the GPRS unit, and flexible choice uses as required.
As preferably, described energy monitoring instrument comprises the two or more instrument in ammeter, water meter, steam table, air table and electric energy acquisition device.Certainly, if enterprise has other instrument of not enumerating here, as tensimeter, thermometer, humidometer etc., also can be connected on demand on data transmission set, be convenient to carry out centralized and unified management by the energy monitor terminal.
The beneficial effects of the utility model are:
(1) all kinds of energy monitoring instrument accesses are quick, and installment and debugging is convenient, to installing the enterprise of energy monitoring instrument, transforms also very convenient; Configuration is convenient, and is with low content of technology;
(2) can carry out centralized and unified monitoring management to different types of energy, administration interface is unified, is convenient in time find fault, in time deal with, and improves the efficiency of management, guarantees effectively that enterprise produces normally to carry out, and improves the security of producing;
(3) all kinds of can source data set the monitoring, more be conducive to carry out energy-conservation analysis-by-synthesis.
Description of drawings
Fig. 1 is a kind of system of the present utility model syndeton block diagram.
Fig. 2 is a kind of circuit theory syndeton block diagram of data transmission set in the utility model.
1. energy monitoring instrument in figure, 2. data transmission set, 3. energy monitor terminal, 11. ammeter, 12. water meters, 13. steam tables, 14. the air table, 15. electric energy acquisition devices, 21. CPU (central processing unit), 22. power supply unit, 23.Zigbee communication unit, 24.485 communication interface units, 25. Ethernet unit, 26.GPRS the unit, 27. push-button units, 28. display units.
Embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment: the various energy resources centralized monitoring system of the present embodiment as shown in Figure 1, comprises various energy resources measuring instrument 1, data transmission set 2 and is positioned at the energy monitor terminal 3 of far-end.As shown in Figure 2, data transmission set 2 comprises CPU (central processing unit) 21, push-button unit 27, display unit 28, Zigbee communication unit 23, five 485 communication interface units 24, Ethernet unit 25, GPRS unit 26 and the power supply unit 22 of operating voltage is provided for whole data transmission set, and push-button unit 27, display unit 28, Zigbee communication unit 23, five 485 communication interface units 24, Ethernet unit 25 and GPRS unit 26 are connected with CPU (central processing unit) 21 respectively.In the present embodiment, energy monitoring instrument 1 comprises ammeter 11, water meter 12, steam table 13, air table 14 and electric energy acquisition device 15, these instrument, on 485 communication interface units 24 that are connected to data transmission set 2 that have, Zigbee communication unit 23 that have and data transmission set 2 carries out wireless telecommunications.Data transmission set 2 is connected with energy monitor terminal 3 by Ethernet unit 25 or GPRS unit 26, according to installation environment or condition can flexible choice use Ethernet unit 25 or GPRS unit 26.
The course of work:
1. 2 pairs of the data transmission sets Zigbee communication unit 23 and 485 communication interface units that are connected with energy monitoring instrument 1 carry out parameter configuration, comprise the meter type sign, the instrument identify label, communications parameter, communication protocol, data report cycle and overcurrent parameter, according to configuration parameter (as baud rate, check bit etc.) open corresponding communication unit, and open corresponding thread, each thread is according to the energy monitoring meter type of communication unit configuration, and according to the data report cycle of setting, energy monitoring instrument 1 is carried out poll, energy monitoring instrument 1 according to polling signal timed sending data acquisition message to data transmission set 2,
2. data transmission set 2 is according to the parameter configuration of communication interface, as instrument type and communication protocol, to the data acquisition message that energy monitoring instrument 1 reports resolve (as: ammeter DLT645-2007 stipulations, 0000FF00 is the active energy message, 0201FF00 is voltage message etc., the communication protocol of supporting has Modbus, DLT645-1997, DLT645-2007, electric power 101, electric power 103 etc.), verification mode (as: the CRC16 that arranges according to communication unit again, CRC32 etc.) data after resolving are carried out integrity verification, and the data after resolving and the overcurrent parameter in parameter configuration compare, judge whether data are abnormal, if abnormal, data transmission set 2 sends warning message to energy monitor terminal 3, warning message comprises the meter type sign, instrument identify label and energy actual measurement parameter and the amount of transfiniting, being convenient to the related personnel in time deals with,
3. data transmission set 2 data that dissimilar energy monitoring instrument 1 is reported are weaved into the message of different-format, containing type sign and device identification in message, to distinguish different energy monitoring instrument 1, message format is: 68+ frame length+type identification (01-electric power; 02-water; The 03-air; 04-steam)+device identification+data type+data+verification and+16, the unsanctioned reported data of checking is arranged in 2. as step, also comprise the data invalidated identification in message, again these messages are converted to unified consensus standard, and be assembled into an intensive data bag, send to energy monitor terminal 3.
The utility model can make related management person carry out centralized and unified monitoring management to a large amount of different types of energy, installment and debugging is convenient, administration interface is unified, be convenient in time find fault, in time deal with, improve the efficiency of management, guarantee effectively that enterprise produces and normally carry out, improve the security of producing.

Claims (5)

1. one kind of multiple energy centralized monitoring systems, it is characterized in that comprising various energy resources measuring instrument (1), data transmission set (2) and energy monitor terminal (3), described various energy resources measuring instrument (1) is or wired be connected wireless with described data transmission set (2) respectively, and described data transmission set (2) is connected with described energy monitor terminal (3) by wireless network or cable network.
2. various energy resources centralized monitoring system according to claim 1, it is characterized in that described data transmission set (2) comprises that CPU (central processing unit) (21), push-button unit (27), display unit (28), a plurality of communication interface unit, network element reach the power supply unit (22) that operating voltage is provided for whole data transmission set, push-button unit (27), display unit (28), a plurality of communication unit and network element are connected with described CPU (central processing unit) (21) respectively.
3. various energy resources centralized monitoring system according to claim 2, is characterized in that described a plurality of communication interface unit comprises Zigbee communication unit (23) and a plurality of 485 communication interface units (24).
4. according to claim 2 or 3 described various energy resources centralized monitoring systems, is characterized in that described network element is Ethernet unit (25) and/or GPRS unit (26).
5. according to claim 1 and 2 or 3 described various energy resources centralized monitoring systems, is characterized in that described energy monitoring instrument (1) comprises the two or more instrument in ammeter (11), water meter (12), steam table (13), air table (14) and electric energy acquisition device (15).
CN2013202760749U 2013-05-20 2013-05-20 Multiple energy centralized monitoring system Expired - Fee Related CN203275986U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202760749U CN203275986U (en) 2013-05-20 2013-05-20 Multiple energy centralized monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202760749U CN203275986U (en) 2013-05-20 2013-05-20 Multiple energy centralized monitoring system

Publications (1)

Publication Number Publication Date
CN203275986U true CN203275986U (en) 2013-11-06

Family

ID=49506357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202760749U Expired - Fee Related CN203275986U (en) 2013-05-20 2013-05-20 Multiple energy centralized monitoring system

Country Status (1)

Country Link
CN (1) CN203275986U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103412520A (en) * 2013-05-20 2013-11-27 浙江新能量科技有限公司 Centralized monitoring system for energy of various kinds and monitoring method thereof
CN103616877A (en) * 2013-11-27 2014-03-05 广州杰赛科技股份有限公司 Monitoring diagnostic method and system for energy pipe network
CN109598918A (en) * 2018-12-26 2019-04-09 宁波三星智能电气有限公司 A kind of transmission method of electric energy meter event information
CN111343063A (en) * 2020-01-21 2020-06-26 珠海瑞捷电气股份有限公司 Communication processing system and method based on Modbus communication protocol
CN112289016A (en) * 2020-10-28 2021-01-29 华能济南黄台发电有限公司 Internet of things intelligent data acquisition and analysis device for heat supply metering system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103412520A (en) * 2013-05-20 2013-11-27 浙江新能量科技有限公司 Centralized monitoring system for energy of various kinds and monitoring method thereof
CN103412520B (en) * 2013-05-20 2015-11-04 浙江新能量科技有限公司 Various energy resources centralized monitoring system and monitoring method thereof
CN103616877A (en) * 2013-11-27 2014-03-05 广州杰赛科技股份有限公司 Monitoring diagnostic method and system for energy pipe network
CN103616877B (en) * 2013-11-27 2017-01-25 广州杰赛科技股份有限公司 Monitoring diagnostic method and system for energy pipe network
CN109598918A (en) * 2018-12-26 2019-04-09 宁波三星智能电气有限公司 A kind of transmission method of electric energy meter event information
CN109598918B (en) * 2018-12-26 2020-06-02 宁波三星智能电气有限公司 Electric energy meter event information transmission method
CN111343063A (en) * 2020-01-21 2020-06-26 珠海瑞捷电气股份有限公司 Communication processing system and method based on Modbus communication protocol
CN111343063B (en) * 2020-01-21 2021-11-30 珠海瑞捷电气股份有限公司 Communication processing system and method based on Modbus communication protocol
CN112289016A (en) * 2020-10-28 2021-01-29 华能济南黄台发电有限公司 Internet of things intelligent data acquisition and analysis device for heat supply metering system

Similar Documents

Publication Publication Date Title
CN103412520B (en) Various energy resources centralized monitoring system and monitoring method thereof
CN203275986U (en) Multiple energy centralized monitoring system
CN204758748U (en) Cubical switchboard intelligent integrated monitoring devices
CN106990384A (en) A kind of three-phase electric energy meter false wiring detection means and detection method
CN105738857A (en) Electric energy meter and acquisition terminal integrated testing device
CN201629036U (en) Power resource energy consumption monitoring system for teaching areas
CN206114147U (en) Thermal meter monitoring system of power plant
CN204679570U (en) Secondary equipment of intelligent converting station Commissioning Analysis platform
CN202025058U (en) Digital display secondary cable core aligner based on wireless technology
CN105141357A (en) Automatic detection and verification system based on secondary system of vehicle-mounted mobile station
CN106776193B (en) The virtual measuring method of apparatus for monitoring power supply slave failure
CN105720683A (en) Device for intelligently selecting and inspecting onsite bus of electric power meter
CN214252961U (en) IR46 electric energy meter fault simulation device
CN103592507A (en) Voltage loop alarm for metering devices of transformer station
CN210244416U (en) GIS (geographic information System) manufacturing monitoring information system based on mobile terminal
CN206164211U (en) DTU data intelligent acquisition platform
CN210865046U (en) Test equipment on-line monitoring system with various alarm functions
CN210376496U (en) Super large current monitor
CN202948303U (en) Networked switch cabinet monitoring system
CN207623966U (en) A kind of computer information management accident warning device
CN203465012U (en) Passive, wireless and hierarchical-distribution power transformation switch cabinet temperature measurement online monitoring system
CN112462164A (en) Intelligent test system of well low-voltage plate cabinet
CN106169815B (en) It stands end automated system operator workstation method for monitoring operation states and system
CN213581816U (en) Real-time data acquisition system for outlet contact
CN204154891U (en) The energy metering device long distance control system of a kind of sing on web GIS

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ZHEJIANG FRESHPOWER TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: ZHEJIANG FRESH POWER TECHNOLOGY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Hangzhou City, Zhejiang province 310013 Gongshu District 332 south new building

Patentee after: ZHEJIANG FRESHPOWER TECHNOLOGY CO., LTD.

Address before: Hangzhou City, Zhejiang province 310013 Gongshu District 332 south new building

Patentee before: Zhejiang Freshpower Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106

Termination date: 20210520

CF01 Termination of patent right due to non-payment of annual fee