CN203263064U CN 201320249484 CN201320249484U CN203263064U CN 203263064 U CN203263064 U CN 203263064U CN 201320249484 CN201320249484 CN 201320249484 CN 201320249484 U CN201320249484 U CN 201320249484U CN 203263064 U CN203263064 U CN 203263064U
Authority
CN
China
Prior art keywords
hot water
water
temperature
beverage
cold water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320249484
Other languages
Chinese (zh)
Inventor
刘宗熹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GINO CREATION CO Ltd
Original Assignee
GINO CREATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GINO CREATION CO Ltd filed Critical GINO CREATION CO Ltd
Priority to CN 201320249484 priority Critical patent/CN203263064U/en
Application granted granted Critical
Publication of CN203263064U publication Critical patent/CN203263064U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Apparatus For Making Beverages (AREA)

Abstract

The utility model provides a high-temperature abacterial beverage brewing and boiling machine. A main boiler is adopted to directly heat cold water supplied by a water supply pump into overheated hot water exceeding boiling temperature; heat exchange is carried out between the overheated hot water and cold water before being heated through a preheating heat exchanger, so that the overheated hot water is cooled into moderate-temperature hot water; the moderate-temperature hot water is transported to at least one auxiliary boiler; a temperature detector, a water level detector and a temperature compensating heater are arranged on the auxiliary boiler; when the fact that the moderate-temperature hot water in the auxiliary boiler cannot reach the temperature set value is detected, the temperature compensating heater is started to heat the moderate-temperature hot water in a compensating manner. The high-temperature abacterial beverage brewing and boiling machine has the advantages that a large amount of moderate-temperature hot water with stable temperature can be supplied during the process of brewing and boiling beverage for one time, so that the beverage brewing and boiling quality is improved, the beverage brewing and boiling time is saved, and the sanitation is guaranteed as the moderate-temperature hot water used for brewing and boiling beverage is boiled in advance.

Description

Machine is boiled in the punching of high temperature aseptic beverage
Technical field
The utility model relates to a kind of beverage brewing machine, refers to that especially a kind of high temperature aseptic beverage rushes the machine that boils.
Background technology
The beverage brewing machine is applied to preparation example such as the beverages such as coffee, teas, mainly by a heater, extraneous water source is heated to the Temperature Setting of 95 ℃ for example, and by a water supply installation, hot water is distributed to a beverage that presets the beverage food materials and prepares in container, hot water and food materials are interacted be prepared into beverage.
When the teas beverages such as preparation example such as black tea, must in preparation procedure, supply a large amount of hot water to this beverage and prepare in container.Have the large volume boiler of beverage brewing machine now because using in a large number continuously hot water, the hot water temperature can't be controlled at the proper temperature scope, causes to rush and boils the drink mouthfeel shakiness of completing, the shortcoming that quality is not good.
TaiWan, China bulletin M317237 Patent Case (call in the following text and quote case as proof), a kind of " the preheating cold water structure of drink maker " is provided, mainly include steam copper and heating kettle, wherein: steam copper, be provided with the main water inlet tube road, and by the outer winding of main water inlet tube road direction, the first inlet pipeline, the second inlet pipeline are arranged, this first inlet pipeline is connected to steam copper, the second inlet pipeline is the winding preheating zone, this preheating zone is fixedly arranged on steam copper inside, and both spaces are not connected, again, steam copper is provided with heater, and this steam copper top is provided with steam (vapor) outlet; Heating kettle is provided with heater, this heating kettle winding second inlet pipeline, and be provided with outlet pipe in the heating kettle top.Quote case as proof and mainly use steam copper that extraneous cool water heating is become warm water, re-use heating kettle and warm water is heated into the hot water of temperature required setting, with the required time of heating again of the heater that shortens heating kettle.
The above-mentioned major defect of quoting case as proof for its steam copper and heating kettle all without attemperating unit, the second inlet pipeline water temperature such as too high heating kettle can not produce cooling function, leaving water temperature is too high may scald food materials and operating personnel, the second inlet pipeline water temperature such as too low heating kettle also can't start the temperature difference program of replenishing, leaving water temperature is too low, and to brew rear beverage mouthfeel not good, and more severe patient has the misgivings that the public safety accident occurs.Moreover, being used for rushing the hot water that boils beverage and not boiled in advance, in hot water, bacteria containing amount may be too high, and health is surveyed worry.Temperature is boiled in the best punching that different types of beverage is had nothing in common with each other, for example: use 95 ℃ of hot water punchings to boil black tea, use 85 ℃ of hot water punchings to boil green tea etc.If when using the hot water punching that surpasses boiling temperature to boil beverage, may scald the skin such as dispute of drinking person.Therefore, quote as proof case through the warm water temperature of steam copper preheating zone preheating not higher than the hot water temperature through the heating kettle heating, and it boils the hot water temperature of beverage not higher than boiling temperature for punching; Also namely quote the hot water of case as proof without boiling fully, may have the too high health of bacteria containing amount to survey the problem of worry.
Moreover, quote case as proof and only can supply without temperature controlled hot water, to boil temperature not identical due to the punching of the best of different types of beverage (such as coffee, green tea, black tea etc.); Quote case as proof and only can supply without temperature controlled hot water, can't be applicable to punching and boil different types of beverage, if it is not beverage is boiled in the hot water punching of using non-best punching to boil temperature, good with causing punching to boil the mouthfeel of rear beverage.And the preheating zone of its use is fit to the beverage brewing program of general low discharge, and for example adopted formula coffee or single cup of extraction tea, be unable to supply for example above a large amount of waters of 1500cc.Moreover, quote case as proof and also do not possess dilution and the cooling function that adds hot-water flooding and cold water after punching is boiled in beverage arranged.Quote case as proof and only can additionally add hot water, cold water and/or ice cube with manual type in completing the beverage that boils of punching, to change temperature and the concentration of beverage.The artificial addition manner of this kind is not only during operating cost, and can't keep best in quality and the mouthfeel of beverage, may cause the client to cross waiting time of a specified duration and the problem such as dissatisfied beverage quality.
Summary of the invention
The purpose of this utility model namely is to provide a kind of high temperature aseptic beverage punching to boil machine, its hot water that boils beverage for punching is heated to be about 120 ℃ by a main boiler in advance, carry out heat exchange by a preheating heat exchanger and cold water again, be cooled to a thermophilic hot water for soaking beverage, reach complete sterilization to guarantee that health is without anxiety.
Of the present utility model time a purpose is to provide a kind of high temperature aseptic beverage punching to boil machine, it uses at least one auxiliary pot, to this compensating property of thermophilic hot water heating process, and can be in a beverage brewing program of a large amount of hot water of needs, the quick compensatory heating effect that relies on this auxiliary pot, a large amount of hot water of supply equilibrium temperature, quality is boiled in the lifting punching and speed is boiled in punching, can't use continuously the shortcoming of hot water and temperature shakiness to improve existing beverage brewing machine.
Another purpose of the present utility model is to provide a kind of high temperature aseptic beverage punching to boil machine, its hot water that can supply multiple different temperatures carries out the beverage brewing program, to coordinate different types of beverage (such as coffee, green tea, black tea etc.), supply is fit to the best punching of this kind beverage and boils temperature hot water, cook the different beverages of best mouthfeel with punching, make this beverage brewing machine for the multiple different beverages of preparation, promote its equipment mobility and range of application.
Another purpose of the present utility model is to provide a kind of high temperature aseptic beverage punching to boil machine, it can be set according to the user after completing the beverage brewing program, selects hot water and/or cold water with set volume, automatic powder adding is added on punching and boils in rear beverage, to change concentration and/or the temperature of beverage; It is not only easy to operate rapid, more can keep best in quality and the mouthfeel of beverage, simultaneously with the suitable drink of beverage fast cooling to a temperature.
Can reach the high temperature aseptic beverage punching of foregoing invention purpose and boil machine, include: one connects the supply-water pump of extraneous cold water; One is connected and carries the cold water pipe of this cold water with this supply-water pump; One receives the main boiler of this cold water from this cold water pipe, and it is provided with a temperature detecting device and a heater, is used for this cool water heating to one is surpassed the overheated hot water (being generally 120 ℃ of general sterilization temperatures) of boiling temperature; One is connected and receives the hot-water line of this overheated hot water with this main boiler; The preheating heat exchanger of one suitable heat exchange area makes the cold water that enters in this cold water pipe before this main boiler, in advance with this hot-water line in overheated hot water carry out heat exchange, with temperature of cold water rises, this overheated hot water is lowered the temperature into a thermophilic hot water; At least one receives the auxiliary pot by this thermophilic hot water of this preheating heat exchanger, its temperature detecting device and one that is provided with thermophilic hot water temperature value in this auxiliary pot of a detecting is repaid warm heater, when thermophilic hot water does not reach a desired temperature in the detecting of this temperature detecting device should auxiliary pot, start this repay warm heater with this thermophilic hot water heating to this desired temperature; An and hot water supply pipe, it receives this thermophilic hot water by this auxiliary pot, and be arranged at rushing on this hot water supply pipe by one and boil solenoid control, this thermophilic hot water is supplied to a beverage that presets beverage ingredient prepares in container, make this thermophilic hot water interact into a beverage with this beverage ingredient.
In a preferred embodiment, this preheating heat exchanger is comprised of the outer tube that an inner tube and an interval are coated on this inner tube outside; Wherein, this outer tube is connected between this main boiler and this auxiliary pot, passes through for this overheated hot water; This inner tube is connected between this supply-water pump and this main boiler, passes through for this cold water; Make cold water and the overheated hot water of flow through respectively this inner tube and outer tube carry out in advance heat exchange.
In a preferred embodiment, this at least one auxiliary pot is comprised of one first auxiliary pot and one second auxiliary pot institute, and the thermophilic hot water by this first and second auxiliary pot is selected to enter in this hot water supply pipe respectively by one first magnetic valve and one second solenoid control.
In a preferred embodiment, this first auxiliary pot and this second auxiliary pot receive this thermophilic hot water from the different length of this preheating heat exchanger inner tube respectively, make this thermophilic hot water that enters this first auxiliary pot and this second auxiliary pot have different temperature values, and this first auxiliary pot and this second auxiliary pot set value the compensatory different temperatures that is heated to of this thermophilic hot water respectively.
In a preferred embodiment, this high temperature aseptic beverage punching is boiled machine and is more included a hot water water injection pipe, this hot water water injection pipe is connected to not yet and boils on this hot water supply pipe of magnetic valve through this punching, and controlled by a hot water water injecting electromagnetic valve that is arranged on this hot water water injection pipe, this hot water is injected to have completed rush in this beverage that boils.
In a preferred embodiment, the cold water water injection pipe that machine more includes a reception extraneous cold water that this supply-water pump is supplied is boiled in this high temperature aseptic beverage punching, and controlled by a cold water water injecting electromagnetic valve that is arranged on this cold water water injection pipe, this cold water is injected to have completed rush in this beverage that boils.
In a preferred embodiment, further be provided with the flowmeter of this cold water flow of calculating on this cold water pipe, when this cold water reaches a setting flow value, namely stop this supply-water pump and supply water.
In a preferred embodiment, be respectively equipped with a water level detector on this main boiler and at least one auxiliary pot, when its water level in pot did not reach a water level settings value, the warm heater of repaying that limits the heater of this main boiler and at least one auxiliary pot was activated and heats.
In a preferred embodiment, this main boiler further is provided with a relief valve, and it is used for carrying out pressure release when vapour pressure is too high in this main boiler, and exhaust steam.
In a preferred embodiment, this cold water pipe water inlet end is provided with a check valve, prevents the overheated hot water return scald of this main boiler supply-water pump.
In a preferred embodiment, this main boiler further is provided with a blast pipe and an exhaust solenoid valve, when intaking first for this main boiler, opens this exhaust solenoid valve, discharges this main boiler inner air by this blast pipe.
Compared with prior art, adopt the advantage that the utlity model has of technique scheme to be: machine is boiled in high temperature aseptic beverage punching provided by the utility model, after its hot water that supplies punching to boil beverage is boiled fully by a main boiler in advance, carry out heat exchange by a preheating heat exchanger and cold water again, be cooled to a thermophilic hot water for soaking beverage, reach complete sterilization to guarantee that health is without anxiety.More can be in beverage brewing program, a large amount of hot water of supply equilibrium temperature, quality is boiled in punching and speed is boiled in punching and can promote, and the user need not to wait the beverage brewing machine need of having now time of consuming of heat hot water once again.And the hot water that can supply multiple different temperatures carries out the beverage brewing program, to coordinate different types of beverage (such as coffee, green tea, black tea etc.), supply is fit to the best punching of this kind beverage and boils temperature hot water, cook the different beverages of best mouthfeel with punching, make this beverage brewing machine for the multiple different beverages of preparation, promote its equipment mobility and range of application.
Description of drawings
Fig. 1 is the schematic perspective view that machine the first embodiment is boiled in the punching of the utility model high temperature aseptic beverage, and wherein the partial interior member is represented by dotted lines;
Fig. 2 is similar to Fig. 1, and is the schematic appearance of Fig. 1;
Fig. 3 is the section enlarged diagram of preheating heat exchanger shown in Figure 1;
Fig. 4 is the schematic perspective view that machine the second embodiment is boiled in the punching of the utility model high temperature aseptic beverage;
Fig. 5 is the structural representation of middle preheating heat exchanger embodiment illustrated in fig. 4;
Fig. 6 is the schematic perspective view that machine the 3rd embodiment is boiled in the punching of the utility model high temperature aseptic beverage.
The specific embodiment
Machine is boiled in high temperature aseptic beverage punching provided by the utility model, and the hot water that mainly punching is boiled beverage boils in advance, guarantees that health is without anxiety; Simultaneously in beverage brewing program, a large amount of hot water of supply equilibrium temperature are to promote the beverage brewing quality and to save punching and boil the time.
Please consult simultaneously Fig. 1 and Fig. 2, machine the first embodiment is boiled in this high temperature aseptic beverage punching: include: a supply-water pump 10; One carries out the main boiler 20 of main heating work; The auxiliary pot 30 of at least one compensating property heating work; One preheating heat exchanger 60 and the pipe-line system of being correlated with and Control Component etc.
Wherein, this main boiler 20 can become an overheated hot water to the extraneous cool water heating that this supply-water pump 10 is carried via a cold water pipe 40.This main boiler 20 is provided with temperature detecting device 23 and a heater 24 of these main boiler 20 interior reservoir coolant-temperature gage values of detecting, when detecting obtains these main boiler 20 interior reservoir coolant-temperature gages lower than default lower limit, namely start 24 pairs of inner water storages of this main boiler 20 of this heater and be heated to the overheated hot water over boiling temperature, for example: 120 ℃.This overheated hot water is by a hot-water line 41, carries out heat exchange through this preheating heat exchanger 60 with cold water, is one for example after the thermophilic hot water of 95 ℃ by lower the temperature, is delivered to compensating property heating in this at least one auxiliary pot 30.
This main boiler 20 further is provided with a water level detector 25, when these Zhu Guo Lu 20 inner storing waters of detecting do not reach a designated water level height, limits this heater 24 and is activated, and prevents empty the burning.This water level detector 25 is arranged at this main boiler 20 tops, and it is short probe pattern, makes the inner liquid level of this main boiler 20 near main boiler 20 tops.
This main boiler 20 tops further are provided with a relief valve 27, hot water heating process Yin Wendu surpass 100 ℃ reach boiling more than, can produce vapour pressure, the relief valve 27 of vapour pressure through being positioned at main boiler 20 highest points discharged, pressure release on the one hand, exhaust steam on the one hand.This main boiler 20 tops also are provided with a safety relief valve 28, and when it surpassed a setting value in these main boiler 20 internal vapor pressure, the releasing pressure automatically steam discharge guaranteed that main boiler 20 safety are without anxiety.
This main boiler 20 further is provided with a blast pipe 21 and an exhaust solenoid valve 22, main boiler 20 is when installation water inlet first or the rear empty stove water inlet of maintenance, because the stove internal memory has air, when therefore intaking first, start simultaneously supply-water pump 10 and exhaust solenoid valve 22, during water inlet, one end water inlet is discharged furnace air by blast pipe 21 simultaneously, is convenient to moisturizing.Also can replace the manual exhaust of intaking when exhaust solenoid valve 22 supplies main boiler 20 empty stove by hand-operated valve, also implement by the equivalence that the utility model can be expected certainly.
As shown in Figure 3, this preheating heat exchanger 60 is comprised of the outer tube 62 that an inner tube 61 and an interval are coated on this inner tube 61 outsides, wherein, these outer tube 62 1 ends are connected with this hot-water line 41, the overheated hot water that this main boiler 20 is produced flows in this outer tube 62, and the other end of this outer tube 62 is connected to this auxiliary pot 30 with another hot-water line 41a; This inner tube 61 is essentially the part of this cold water pipe 40, and the cold water in this cold water pipe 40 is flowed in this main boiler 20 via this inner tube 61.Cold water and the overheated hot water of this inner tube 61 and outer tube 62 of flowing through respectively carries out heat exchange in advance, so, heat front cold water and carry out heat exchange with the rear overheated hot water of heating in advance, not only make hot water can by first be heated to one guarantee health without the anxiety boiling temperature after, again via after being cooled to suitable punching and boiling the thermophilic hot water of temperature with the cold water heat exchange, then enter in auxiliary pot 30; More make cold water enter again the interior heating of main boiler 20 after preheating, can reduce the time that main boiler 20 heating cold water consume.
This at least one auxiliary pot 30 receives by the thermophilic hot water after this preheating heat exchanger 60 via a hot-water line 41, and to this compensating property of thermophilic hot water heating work.Because the main heating work to cold water is born by main boiler 20, and auxiliary pot 30 is not only when this thermophilic hot water reaches a desired temperature, carry out the compensatory heating work of antipode short time, therefore, be able to use in a large number during once program is boiled in punching of hot water at needs, a large amount of hot water by these auxiliary pot 30 supply equilibrium temperatures carry out the beverage brewing program.
This auxiliary pot 30 is provided with the temperature detecting device 31 and of these auxiliary pot 30 interior hot water temperature's values of a detecting and repays warm heater 32, when 31 detectings of this temperature detecting device should auxiliary pot 30 interior thermophilic hot water when not reaching the desired temperature of for example 95 ℃ ± 1 ℃, start this repay warm heater 32 with this thermophilic hot water heating to this desired temperature.when punching boil need such as the teas beverage such as black tea a large amount of when using hot water continuously, this thermophilic the hot water temperature may successively decrease, perhaps because causing more greatly temperature detecting device 23, main boiler 20 volumes detect the temperature deficiency when restarting heater 24, or cold water temperature is different produces heat exchange temperature not simultaneously because winter and summer changes, the outlet hot water temperature of this hot-water line 41 may be not enough, at this moment, when the temperature detecting device 31 of auxiliary pot 30 detects the temperature deficiency, can start and repay warm heater 32 and heat, supply temperature, its advantage is the compensatory heating via auxiliary pot 30, can make rushing of hot water boil temperature more accurate, it is more stable that beverage mouthfeel is boiled in punching.
This at least one auxiliary pot 30 further is provided with a water level detector 33, when detecting should auxiliary pot 30 inner storing waters reach a designated water level height, limits this and repays warm heater 32 and be activated, and prevents empty burning.
When beginning to carry out the beverage brewing program, control module (scheming not shown) namely starts the working power that magnetic valve 44 is boiled in this supply-water pump 10 and a punching, by this supply-water pump 10, extraneous cold water is pumped into a cold water pipe 40 that is connected in 20 of this supply-water pump 10 and main boilers, after this cold water pipe 40 extends to bottom near this main boiler 20, flow in this main boiler 20, and be heated to form an overheated hot water; This overheated hot water is again via this hot-water line 41, first carry out heat exchange by this preheating heat exchanger 60 with this cold water, and after being lowered the temperature into a thermophilic hot water, flow into again in this auxiliary pot 30, when this temperature detecting device 31 detects this thermophilic hot water temperature deficiency, namely start this and repay 32 pairs of these compensating property of thermophilic hot water heating works of warm heater; At last, reach stable punching and boiled the thermophilic hot water of temperature, via a hot water supply pipe 42, to be delivered to a water sprinkler 43 by the thermophilic hot water of this auxiliary pot 30, and evenly be spilled into a beverage that presets beverage ingredient and prepare in container 45, make this thermophilic hot water interact into a beverage with this beverage ingredient, this beverage flows into an interior storage of storage barrel 46 again, and this water sprinkler 43 also can be a Dey-Dose, and this water sprinkler 43 also can be a brewing device punching and boils drink.
Further be provided with a flowmeter 11 that calculates this cold water flow on this cold water pipe, when this cold water reaches one when setting flow value, this control module namely stops the working power that magnetic valve 44 is boiled in this supply-water pump 10 and this punching, stops supplying water and the beverage brewing program.Also be provided with a check valve 12 that prevents the cold water adverse current on this cold water pipe.
Please consult simultaneously Fig. 4 and Fig. 5, machine the second embodiment is boiled in this high temperature aseptic beverage punching, its main composition is identical with above-mentioned the first embodiment, below only be explained with regard to different piece: this at least one auxiliary pot is comprised of first auxiliary pot of 30a and second auxiliary pot of 30b, and wherein this first auxiliary pot of 30a and this second auxiliary pot of 30b receive this thermophilic hot water from the different length of the outer tube 62 (referring to Fig. 5) of this preheating heat exchanger 60 respectively; This outer tube 62 connects a hot-water line 41b at a higher position place, with this thermophilic delivery to this first auxiliary pot of 30a; This outer tube 62 connects another hot-water line 41a at a lower position place, with this thermophilic delivery to this second auxiliary pot of 30b; Make this thermophilic hot water of entering this first auxiliary pot of 30a and this second auxiliary pot of 30b because carrying out area and the asynchronism(-nization) of heat exchange with cold water, and has different temperature values, wherein, enter the temperature of this this thermophilic hot water of first auxiliary pot of 30a a little more than the temperature of the thermophilic hot water that enters this second auxiliary pot of 30b.This first auxiliary pot of 30a and this second auxiliary pot of 30b are respectively with the compensatory different temperatures setting value that is heated to of this thermophilic hot water.Thermophilic hot water by this first and second auxiliary pot 30a, 30b is controlled by first and second different magnetic valve 56,57 respectively, and the thermophilic hot water of selecting arbitrary auxiliary pot of 30a, 30b to supply enters in this hot water supply pipe 42.So, thermophilic hot water to this beverage that this beverage brewing machine can be supplied two kinds of different temperatures prepares in container 45, to coordinate different beverage ingredients to carry out the beverage brewing program, for example: open the first magnetic valve 56 when using 95 ℃ of hot water punchings to boil black tea, prepare container 45 by 95 ℃ of hot water to beverages of first auxiliary pot of 30a supply; Open the second magnetic valve 57 when using 85 ℃ of hot water punchings to boil green tea, prepare container 45 by 85 ℃ of hot water to beverages of second auxiliary pot of 30b supply.
Preheating heat exchanger as shown in Figure 5 at the different length place of an outer tube, connects the hot-water line more than two, makes the hot water that exports in different hot-water lines because of heat exchange area and asynchronism(-nization), and has different temperature.In like manner, also can split into two groups of above preheating heat exchangers, on the outer tube of each preheating heat exchanger, respectively at the different length place, the hot-water line that connects an output hot water is connected to each auxiliary pot, with each preheating heat exchanger parallel combination, has equally the equivalent effect of how warm exchange again.
When if three groups or above auxiliary pot are set, can increase the temperature value of beverage brewing machine institute hot-water supply, boil three or more variety classes beverage for punching, the equivalent embodiment that this can expect certainly by the utility model.
See also Fig. 6, machine the 3rd embodiment is boiled in this high temperature aseptic beverage punching, its main composition is identical with above-mentioned the second embodiment, below only be explained with regard to different piece: this high temperature aseptic beverage punching is boiled machine and is more included a hot water water injection pipe 52, this hot water water injection pipe 52 is connected to not yet and boils on this hot water supply pipe 42 of magnetic valve 44 through this punching, and controlled by a hot water water injecting electromagnetic valve 53 that is arranged on this hot water water injection pipe 52, this thermophilic hot water injection is stored in the beverage of this storage barrel 46 (seeing also Fig. 1).When for example diluting black tea infusion, open the first magnetic valve 56 and hot water water injecting electromagnetic valve 53; During dilution green tea millet paste, open the second magnetic valve 57 and hot water water injecting electromagnetic valve 53.So, can change the concentration of this beverage, but not change its temperature, such as beverages such as American weak coffees, it is not only easy to operate rapid for modulation, more can keep best in quality and the mouthfeel of beverage.
In addition, the cold water water injection pipe 54 that machine more includes this supply-water pump 10 extraneous cold water of supplying of reception is boiled in this high temperature aseptic beverage punching, and controlled by a cold water water injecting electromagnetic valve 55 that is arranged on this cold water water injection pipe 54, this cold water injection is stored in the beverage of this storage barrel 46.So, can change the temperature of this beverage and dilute its concentration, making the suitable drink of beverage fast cooling to a temperature, avoiding drinking person to scald dispute, or in this storage barrel 46 interior on the rocks make become the ice drink.
Throttling arrangement (throttling joint or choke valve) 58,59 all is set, in order to control flow in hot water water injection pipe 52 and cold water water injection pipe 54.
Machine is boiled in high temperature aseptic beverage punching provided by the utility model, after its hot water that supplies punching to boil beverage is boiled fully by a main boiler in advance, carry out heat exchange by a preheating heat exchanger and cold water again, be cooled to a thermophilic hot water for soaking beverage, reach complete sterilization to guarantee that health is without anxiety.More can be in beverage brewing program, a large amount of hot water of supply equilibrium temperature, quality is boiled in punching and speed is boiled in punching and can promote, and the user need not to wait the beverage brewing machine need of having now time of consuming of heat hot water once again.And the hot water that can supply multiple different temperatures carries out the beverage brewing program, to coordinate different types of beverage (such as coffee, green tea, black tea etc.), supply is fit to the best punching of this kind beverage and boils temperature hot water, cook the different beverages of best mouthfeel with punching, make this beverage brewing machine for the multiple different beverages of preparation, promote its equipment mobility and range of application.
Above explanation is just illustrative for the utility model; and nonrestrictive, those of ordinary skills understand, in the situation that do not break away from the spirit and scope that claim limits; can make many modifications, variation or equivalence, but within all falling into protection domain of the present utility model.

Claims (10)

1. machine is boiled in a high temperature aseptic beverage punching, it is characterized in that, comprising:
One connects the supply-water pump of extraneous cold water;
One is connected and carries the cold water pipe of this cold water with this supply-water pump;
One receives the main boiler of this cold water from this cold water pipe, and it is provided with a temperature detecting device and a heater, is used for this cool water heating to one is surpassed the overheated hot water of boiling temperature;
One is connected and receives the hot-water line of this overheated hot water with this main boiler;
One preheating heat exchanger makes the cold water that enters in this cold water pipe before this main boiler, in advance with this hot-water line in overheated hot water carry out heat exchange, with temperature of cold water rises, and this overheated hot water is lowered the temperature into a thermophilic hot water;
At least one receives the auxiliary pot by this thermophilic hot water of this preheating heat exchanger, its temperature detecting device and one that is provided with thermophilic hot water temperature value in this auxiliary pot of a detecting is repaid warm heater, when thermophilic hot water does not reach a desired temperature in the detecting of this temperature detecting device should auxiliary pot, start this repay warm heater with this thermophilic hot water heating to this desired temperature; And
One hot water supply pipe, it receives this thermophilic hot water by this auxiliary pot, and be arranged at rushing on this hot water supply pipe by one and boil solenoid control, this thermophilic hot water is supplied to a beverage that presets beverage ingredient prepares in container, make this thermophilic hot water interact into a beverage with this beverage ingredient.
2. machine is boiled in high temperature aseptic beverage according to claim 1 punching, it is characterized in that: this preheating heat exchanger is comprised of the outer tube that an inner tube and an interval are coated on this inner tube outside; Wherein, this outer tube is connected between this main boiler and this auxiliary pot, passes through for this overheated hot water; This inner tube is connected between this supply-water pump and this main boiler, passes through for this cold water; This preheating heat exchanger makes the cold water of flow through respectively this inner tube and outer tube and overheated hot water carry out in advance heat exchange.
3. machine is boiled in high temperature aseptic beverage punching according to claim 1, it is characterized in that: this at least one auxiliary pot is comprised of one first auxiliary pot and one second auxiliary pot, thermophilic hot water by this first and second auxiliary pot is selected to enter in this hot water supply pipe respectively by one first magnetic valve and one second solenoid control.
4. machine is boiled in high temperature aseptic beverage punching according to claim 3, it is characterized in that: this first auxiliary pot and this second auxiliary pot receive this thermophilic hot water from the different length of this preheating heat exchanger inner tube respectively, make this thermophilic hot water that enters this first auxiliary pot and this second auxiliary pot have different temperature values, and this first auxiliary pot and this second auxiliary pot set value the compensatory different temperatures that is heated to of this thermophilic hot water respectively.
5. machine is boiled in high temperature aseptic beverage punching according to claim 1, it is characterized in that: further include a hot water water injection pipe, this hot water water injection pipe is connected to not yet and boils on this hot water supply pipe of magnetic valve through this punching, and controlled by a hot water water injecting electromagnetic valve that is arranged on this hot water water injection pipe, this hot water is injected to have completed rush in this beverage that boils.
6. machine is boiled in high temperature aseptic beverage punching according to claim 1, it is characterized in that: the cold water water injection pipe that further includes a reception extraneous cold water that this supply-water pump is supplied, and controlled by a cold water water injecting electromagnetic valve that is arranged on this cold water water injection pipe, this cold water is injected to have completed rush in this beverage that boils.
7. machine is boiled in high temperature aseptic beverage punching according to claim 1, it is characterized in that: further be provided with the flowmeter of this cold water flow of calculating on this cold water pipe, when this cold water reaches a setting flow value, namely stop this supply-water pump and supply water.
8. machine is boiled in high temperature aseptic beverage punching according to claim 1, it is characterized in that: be respectively equipped with a water level detector on this main boiler and at least one auxiliary pot, when its water level in pot did not reach a water level settings value, the warm heater of repaying that limits the heater of this main boiler and at least one auxiliary pot was activated and heats.
9. machine is boiled in high temperature aseptic beverage punching according to claim 1, and it is characterized in that: this main boiler further is provided with a relief valve, and it is used for carrying out when vapour pressure is too high in this main boiler pressure release and exhaust steam.
10. machine is boiled in high temperature aseptic beverage punching according to claim 1, it is characterized in that: this main boiler further is provided with a blast pipe and an exhaust solenoid valve, when intaking first for this main boiler, open this exhaust solenoid valve, discharge this main boiler inner air by this blast pipe.
CN 201320249484 2013-05-09 2013-05-09 High-temperature abacterial beverage brewing and boiling machine Expired - Fee Related CN203263064U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320249484 CN203263064U (en) 2013-05-09 2013-05-09 High-temperature abacterial beverage brewing and boiling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320249484 CN203263064U (en) 2013-05-09 2013-05-09 High-temperature abacterial beverage brewing and boiling machine

Publications (1)

Publication Number Publication Date
CN203263064U true CN203263064U (en) 2013-11-06

Family

ID=49493575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320249484 Expired - Fee Related CN203263064U (en) 2013-05-09 2013-05-09 High-temperature abacterial beverage brewing and boiling machine

Country Status (1)

Country Link
CN (1) CN203263064U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104138207A (en) * 2013-05-09 2014-11-12 吉诺工业有限公司 High-temperature sterile beverage making machine
CN104643934A (en) * 2015-02-05 2015-05-27 广东新宝电器股份有限公司 Method and device for brewing beverage
CN108348103A (en) * 2015-10-21 2018-07-31 埃莱克特拉有限公司 Professional coffee machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104138207A (en) * 2013-05-09 2014-11-12 吉诺工业有限公司 High-temperature sterile beverage making machine
CN104643934A (en) * 2015-02-05 2015-05-27 广东新宝电器股份有限公司 Method and device for brewing beverage
CN108348103A (en) * 2015-10-21 2018-07-31 埃莱克特拉有限公司 Professional coffee machine

Similar Documents

Publication Publication Date Title
CN103932587A (en) Overheating type beverage brewing machine with constant temperature water supplied
CN103932588A (en) Preheating type constant-temperature water supply beverage brewing machine
CN103110353A (en) Drinking water coffee brewing machine and control method thereof
US20080063772A1 (en) Concentrated fresh brewed tea
CN203263064U (en) High-temperature abacterial beverage brewing and boiling machine
CN105286640A (en) Coffee brewing device and beverage brewing method
CN101103879A (en) Coffee pouring method and coffee machine using the same method to process pouring
CN205697232U (en) A kind of intelligent healthy drinking machine
CN205493571U (en) Coffee brewing device
CN106724852A (en) A kind of pre-warmed instant heating type water boiler of interior circulation
CN202445855U (en) Variable-temperature hot water supply device of drink making machine
CN108937583A (en) A kind of instant heating type drinking machine
CN104138207A (en) High-temperature sterile beverage making machine
CN211795913U (en) Constant-temperature direct drinking water equipment
CN201178984Y (en) Dual-purpose control temperature watering and boiling mechanism for the dense and the tasteless
CN102973155A (en) Modified coffee machine
CN108618617A (en) A kind of method making cold coffee and the coffee machine using this method
CN208864068U (en) A kind of fluid constant temperature system with two-stage cooling
ATE301414T1 (en) DEVICE FOR PRODUCING HOT BEVERAGES
CN202801267U (en) Preheating type heat exchange device of beverage preparation machinery
TWI535405B (en) Preheating constant temperature water supply beverage brewing machine
CN203634003U (en) Novel water boiler
CN104807174A (en) Separating heat storage type cold water heater
CN205197803U (en) Water heating device
CN209153194U (en) A kind of instant heating type drinking machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106

Termination date: 20160509

CF01 Termination of patent right due to non-payment of annual fee