CN203255551U - Scrap metal storage bin - Google Patents

Scrap metal storage bin Download PDF

Info

Publication number
CN203255551U
CN203255551U CN 201320146202 CN201320146202U CN203255551U CN 203255551 U CN203255551 U CN 203255551U CN 201320146202 CN201320146202 CN 201320146202 CN 201320146202 U CN201320146202 U CN 201320146202U CN 203255551 U CN203255551 U CN 203255551U
Authority
CN
China
Prior art keywords
warehouse
broken metal
discharging
scrap metal
discharge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320146202
Other languages
Chinese (zh)
Inventor
袁靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Regeneration technology (Suzhou) Co., Ltd. garnor resources
Original Assignee
SUZHOU JIANUO RESOURCE REGENERATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU JIANUO RESOURCE REGENERATION TECHNOLOGY Co Ltd filed Critical SUZHOU JIANUO RESOURCE REGENERATION TECHNOLOGY Co Ltd
Priority to CN 201320146202 priority Critical patent/CN203255551U/en
Application granted granted Critical
Publication of CN203255551U publication Critical patent/CN203255551U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model discloses a scrap metal storage bin which comprises a supporting frame and a cylindrical bin body fixed on the supporting frame. A feeding port is formed in the top of the bin body, at least two discharge ports are formed in the bottom of the bin body, the upper portion of each discharge port is of a tapered structure, at least one side face of the lower portion of each discharge port is a vertical face, and a discharge valve is arranged below each discharge port. Scrap metal can be stored through the bin body and can be automatically discharged through the discharge ports, therefore, accumulation and bridging of the scrap metal are avoided, and in addition, the discharge amount of the discharge ports is controlled through the discharge valves. Compared with a well-known device for storing and discharging the scrap metal, the scrap metal storage bin reduces storage cost, reduces pollution to air and water, and avoids waste of metal resources to a certain degree.

Description

A kind of broken metal storage warehouse
Technical field
The utility model relates to the Secondary Metals Industry field, is specifically related to a kind of broken metal storage warehouse.
Background technology
In recent years, along with the quickening of process of industrialization, the development of Secondary Metals Industry more and more receives the concern of country and enterprise.As everyone knows, metalwork is in the process of using, because the burn into of metalwork damages and natural selection, all can produce a large amount of waste metals every year.Because therefore most metals can both, if arbitrarily abandon or place these waste metals, namely cause the pollution of environment with the form recycle of secondary metal, have caused again the waste of limited metals resources.
And in order to realize the again recycle of broken metal, it is particularly important that the storage of broken metal and discharging become.Existing broken metal stores the general dual mode that adopts, and first kind of way is spent material storage reservation or revocation metal, but the material bin cost is too high, has caused like this storage cost higher; The second way is outdoor accumulation, namely directly a pile broken metal is piled up in the open or in certain not open-air zone, when broken metal need to use, manually be transported on the corresponding station, owing to contain a large amount of deleterious particles in the broken metal, outdoor accumulation not only can produce air, water body pollutes, also can make the broken metal corrosion, cause the waste of metals resources, the place floor area of stacking simultaneously broken metal is large, pick and place material inconvenience, cause production efficiency low.
The utility model content
For solving the problems of the technologies described above, we have proposed a kind of broken metal storage warehouse, by being provided with inlet point at described warehouse top, the bottom is provided with at least two discharging openings, discharging opening top is provided with tapered structure, and vertical plane is arranged at least one side, bottom, and the accumulation that has destroyed between broken metal is built bridge, at least two discharging openings, when having increased the discharging area, when wherein certain discharging opening need to overhaul, remaining discharging opening is normally discharging still, the discharge valve that each discharging opening below is provided with, be used for regulating the discharging flow, and when having discharging opening to overhaul, be convenient to cut off discharging, easy and simple to handle, and improved production efficiency.
For achieving the above object, the technical solution of the utility model is as follows:
A kind of broken metal storage warehouse comprises bracing frame and the cylindrical warehouse that is fixed on the bracing frame; Described warehouse top is provided with inlet point, and the bottom is provided with at least two discharging openings; Pyramidal structure is arranged on described discharging opening top, and vertical plane is arranged at least one side, bottom; Described discharging opening below is provided with discharge valve.
Preferably, described cylindric warehouse is pressed the spiral fashion roll-forming by banded steel plate; Place, described banded steel plate both sides of the edge is provided with L shaped crimping; Described steel plate is mutually stung at adjacent two L shaped crimping places and is added connection.
Preferably, support frame as described above is provided with base plate and the stay bearing plate that is fixedly arranged on the base plate; Described stay bearing plate diameter is greater than described warehouse diameter.
Pass through technique scheme, a kind of broken metal storage warehouse described in the utility model, by warehouse is pressed the spiral fashion roll-forming by banded steel plate, mutually sting and add connection at adjacent two L shaped crimping places, has realized the storage of broken metal, compares Plate Welding, cheap, and the environmental pollution of having avoided welding to cause is controlled the flow of discharging opening discharging by the unlatching size of discharge valve, has realized the discharging of discharging opening; By discharging opening top is provided with tapered structure, vertical plane is arranged at least one side, bottom, the accumulation that has destroyed between broken metal is built bridge, and at least two discharging openings are when having increased the discharging area, when wherein certain discharging opening need to overhaul, remaining discharging opening is normally discharging still, therefore, with known spent material storehouse broken metal is stored and to compare, reduced the storage cost, simple to operate; Pile up outdoor comparing with known broken metal, reduced the pollution to air and water body, avoided the waste of metals resources, reduced cost of labor, improved production efficiency.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, the below will do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art, apparently, accompanying drawing in the following describes only is embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structural representation of the disclosed a kind of broken metal storage warehouse of the utility model embodiment;
Fig. 2 is the cross section structure scheme drawing of the banded steel plate of the disclosed a kind of broken metal storage warehouse of the utility model embodiment;
Fig. 3 is that the banded steel plate of the disclosed a kind of broken metal storage warehouse of the utility model embodiment is stung the structural representation after adding.
The specific embodiment
Below in conjunction with the accompanying drawing among the utility model embodiment, the technical scheme among the utility model embodiment is clearly and completely described, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
Below in conjunction with embodiment and the specific embodiment the utility model is described in further detail.
Embodiment.
As shown in Figure 1, a kind of broken metal storage warehouse, comprise bracing frame and the cylindrical warehouse 2 that is fixed in the bracing frame top, bracing frame is provided with base plate 11 and the stay bearing plate 12 that is fixedly arranged on the base plate 11, and stay bearing plate 12 diameters are greater than warehouse 2 diameters, base plate 11 and stay bearing plate 12 adopt the mixed clay structure of reinforcing bar, the area of contact of itself and warehouse 2 bottoms is large, has reduced the pressure of 2 pairs of bracing frames of warehouse, compares other steel structure, sound construction, cheap.
Warehouse 2 tops are provided with inlet point 21, warehouse 2 centre portions are pressed the helicoidal structure roll-forming by banded steel plate 3, as shown in Figure 2, place, banded steel plate 3 both sides of the edge is provided with L shaped crimping, steel plate 3 rolls in the process by spiral fashion, and as shown in Figure 3, two adjacent L shaped crimpings are mutually stung and added connection, steel plate 3 rolls in the process, steel plate 3 edge joint positions do not use welding, and adopt stinging of two adjacent L shaped crimpings to add connection, have guaranteed the working strength of warehouse 2, Assembly ﹠Disassembly is simple to operate, cheap, warehouse 2 bottoms are provided with two discharging openings 22, and discharging opening is provided with irregularly shaped, and its below is provided with discharge valve 23, and discharging opening 22 belows are provided with load-transfer device 24.
Inlet point 21 by warehouse 2 tops, broken metal is placed in the warehouse 2, thereby realized the memory function of warehouse 2, warehouse 2 centre portions adopt banded steel plate 3 by the spiral fashion roll-forming, steel plate 3 edge joint positions are mutually stung and are added connection, therefore warehouse 2 is cheap, Assembly ﹠Disassembly is all very convenient, pyramidal structure is arranged on discharging opening 22 tops, and vertical plane all is arranged in four sides, bottom, and the accumulation that has destroyed between broken metal is built bridge, warehouse 2 bottoms are provided with two discharging openings 22, not only increased the discharging area, when one of them discharging opening 22 needs maintenance, the still normally discharging of another discharging opening 22.Two discharge valves 23 that discharging opening 22 belows all are provided with are used for control discharging flow, when broken metal only is in storing state, close discharge valve 23, and discharging opening 22 just can't carry out discharging; When broken metal needs discharging, open discharge valve 23, then corresponding discharging opening 22 can carry out discharging; When discharging opening 22 needs maintenance, cut-out will be overhauled the discharge valve 23 that discharging opening 22 belows are provided with and can be overhauled discharging opening 22, and still normally discharging of the discharging opening 22 that need not to overhaul, and broken metal unloads on the load-transfer device 24 from discharging opening 22, and load-transfer device 24 directly is transported to broken metal on the station of appointment.
Therefore, a kind of broken metal storage warehouse described in the utility model, realized the memory function of broken metal by warehouse 2, flow by 22 dischargings of discharge valve 23 control discharging openings, realized the discharging of discharging opening 22, compare known spent material storehouse broken metal is stored, reduced the storage cost, and simple to operate; Compare outside the direct stacked chamber of known broken metal, reduced the pollution of air and water body, avoided to a certain extent the corrosion of broken metal, thereby avoided the waste of metals resources, and realized the automatic discharging of broken metal, be transported to the appointment station by load-transfer device 24, compared and knownly be transported to the appointment station by artificial work, reduce cost of labor, improved production efficiency.
To the above-mentioned explanation of disclosed a kind of broken metal storage warehouse embodiment, make this area professional and technical personnel can realize or use the utility model.Multiple modification to these embodiment will be apparent concerning those skilled in the art, and General Principle as defined herein can in the situation that does not break away from spirit or scope of the present utility model, realize in other embodiments.Therefore, the utility model will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (3)

1. a broken metal storage warehouse is characterized in that, comprises bracing frame and the cylindrical warehouse that is fixed on the bracing frame; Described warehouse top is provided with inlet point, and the bottom is provided with at least two discharging openings; Pyramidal structure is arranged on described discharging opening top, and vertical plane is arranged at least one side, bottom; Described discharging opening below is provided with discharge valve.
2. broken metal storage warehouse according to claim 1 is characterized in that, described cylindric warehouse is pressed the spiral fashion roll-forming by banded steel plate; Place, described banded steel plate both sides of the edge is provided with L shaped crimping; Described steel plate is mutually stung at adjacent two L shaped crimping places and is added connection.
3. broken metal storage warehouse according to claim 1 is characterized in that, support frame as described above is provided with base plate and the stay bearing plate that is fixedly arranged on the base plate; Described stay bearing plate diameter is greater than described warehouse diameter.
CN 201320146202 2013-03-28 2013-03-28 Scrap metal storage bin Expired - Fee Related CN203255551U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320146202 CN203255551U (en) 2013-03-28 2013-03-28 Scrap metal storage bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320146202 CN203255551U (en) 2013-03-28 2013-03-28 Scrap metal storage bin

Publications (1)

Publication Number Publication Date
CN203255551U true CN203255551U (en) 2013-10-30

Family

ID=49468137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320146202 Expired - Fee Related CN203255551U (en) 2013-03-28 2013-03-28 Scrap metal storage bin

Country Status (1)

Country Link
CN (1) CN203255551U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105890292A (en) * 2014-12-25 2016-08-24 程长春 Vacuum metal bin with reinforcing ribs

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105890292A (en) * 2014-12-25 2016-08-24 程长春 Vacuum metal bin with reinforcing ribs

Similar Documents

Publication Publication Date Title
CN203255551U (en) Scrap metal storage bin
CN204366928U (en) Welding stirrup carrying case
CN207714048U (en) A kind of shield-tunneling construction flat bed transport vehicle sleeper
CN206499149U (en) Modular shelf steel plateform system
CN204112592U (en) Special-shaped steel column with honeycomb web plate and L-shaped section
CN205327799U (en) Novel fresh -keeping storage transport case of vegetables
CN115772961A (en) Stable steel structure floor support plate
CN208502016U (en) A kind of energy conservation and environmental protection type steel bar truss floor support plate
CN203558488U (en) Trough type supporting structure for hopper and feeding machine
CN209816986U (en) Stretch forming non-welding assembled water tank
CN205444620U (en) Steel bar truss building carrier plate die block
CN206307537U (en) A kind of oil storage tank with multiple independent memory spaces
CN216406344U (en) Roof purline for steel plate bin
CN219620656U (en) Hoisting device and system for pipeline or small-sized steel member
CN217200917U (en) Double-element full-automatic safe storage device
CN205221604U (en) Environment -friendly underground double -layer oil tank
CN206351858U (en) A kind of steel scrap stores up anti-corrosive apparatus
CN204180908U (en) A kind of livestock material special collector
CN208915687U (en) A kind of detachable mesh sheet plate of Anti-fall using U-shaped reinforcing rib
CN203753721U (en) Sealed type rebar waste box
CN204150344U (en) Fence type turnover pallet
CN202187591U (en) Tower silo
CN214452772U (en) Iron floor table
CN204112594U (en) Honeycomb-shaped steel web-steel pipe concrete flange combined section L-shaped column
CN208815714U (en) A kind of New Thin-walled Combined steel plate shear wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: The regeneration technology of No. 58 Qingjian Lake Science and Technology Park 215122 Jiangsu Province, Suzhou City Industrial Park only 2401 new road garnor resources (Suzhou) Co. Ltd.

Patentee after: Regeneration technology (Suzhou) Co., Ltd. garnor resources

Address before: 215011 Jiangsu Province, Suzhou City Industrial Park Plaza Building 2 room 902 new Tianxiang Suzhou garnor Recycling Technology Co. Ltd.

Patentee before: Suzhou Jianuo Resource Regeneration Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131030

Termination date: 20160328