CN203241277U - Mold capable of realizing integral track-resistance test of multilayer asphalt mixture - Google Patents

Mold capable of realizing integral track-resistance test of multilayer asphalt mixture Download PDF

Info

Publication number
CN203241277U
CN203241277U CN 201320263973 CN201320263973U CN203241277U CN 203241277 U CN203241277 U CN 203241277U CN 201320263973 CN201320263973 CN 201320263973 CN 201320263973 U CN201320263973 U CN 201320263973U CN 203241277 U CN203241277 U CN 203241277U
Authority
CN
China
Prior art keywords
side form
layer
threaded hole
via hole
layers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320263973
Other languages
Chinese (zh)
Inventor
王慧
刘少文
申俊敏
沈佳
赵建斌
董立山
***
董文春
刘向东
董灵山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Hangtian Hangyu Test & Control Technology Institute
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Beijing Hangtian Hangyu Test & Control Technology Institute
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Hangtian Hangyu Test & Control Technology Institute, Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Beijing Hangtian Hangyu Test & Control Technology Institute
Priority to CN 201320263973 priority Critical patent/CN203241277U/en
Application granted granted Critical
Publication of CN203241277U publication Critical patent/CN203241277U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a mold capable of realizing the integral track-resistance test of multilayer asphalt mixtures. The mold comprises a soleplate (5) and more than two layers of side forms, wherein the layers of a test piece are determined according to the situation of a simulated pavement structure, and the height of each layer of side form is 4cm to 10cm; the four layers of side forms are characterized in that the mold comprises the soleplate (5) and the four layers of side forms from bottom to top, the peripheries of the four layers of side forms are correspondently provided with through holes and threaded holes, and the through holes and the threaded holes with the same serial number are matched with one another; the through holes of an upper layer are fixedly connected with the threaded holes of a lower layer in two adjacent layers through internal hexagonal screws. Each layer of side form is not fixed, so that the mold is convenient to dismount, the different asphalt mixtures can be formed in the different layers, the defect of an existing mold that only the track test of a single structural layer of asphalt mixture can be carried out can be overcome, and a purpose for testing the integral track resistance of the multilayer asphalt mixtures can be realized; the defect of the existing mold that a side plate is easy to clamp in an etching groove, that the direction of a test piece is inconvenient to change in the process for grinding and forming the test piece in two opposite directions, and that the existing mold is inconvenient to strip can be overcome.

Description

A kind of mould that can realize the whole anti-rut performance test of multilayer asphalt
Technical field
The utility model belongs to the shop experiment Instrument technology field that Asphalt Pavement Performance is estimated, and is specifically related to a kind of mould that can realize the whole anti-rut performance test of multilayer asphalt.
Background technology
China's rapid development of economy, driving the magnitude of traffic flow increases significantly, the traffic channelization of highway, Class I highway, and the situation of overload heavy duty grows in intensity, in addition summer rare lasting high temperature, the rut problem has become affects the outstanding problem that highway in China develops in a healthy way.
The existence of rut has seriously affected the flatness on road surface, makes wheel path brea bed reduced thickness, has reduced the bulk strength of surface layer and pavement structure, also further causes thus other pavement destructions such as crack, hole groove; Rainy day time channel table impeded drainage can be caused in the highway section that has larger rut groove, so that the anti-slide performance on road surface descends, vehicle direction when overtaking other vehicles or change the track is difficult to control, has affected the stability of trailer reversing; The safety that affects high speed traveling because the existence of ponding, vehicle are easy to float the cunning.In addition, can be covered by ice and snow at cold district rut groove, also so that the anti-slide performance on road surface reduces serious threat traffic safety, and the existence of rut shortened the serviceable life on road surface, reduced the service quality of road.Therefore, correctly estimate the rut situation of bituminous pavement significant for effective control rut disease.
For this reason, propose in China's " highway engineering pitch and Asphalt Mixture Experiment rules " to adopt asphalt mixture in track test to estimate the anti-rut performance of asphalt.Rut test piece adopts the moulding of rolling forming machine, long 300mm, wide 300mm, thick 50~100mm.What but this method obtained only is the anti-rut performance of certain asphalt pavement material, can't react the anti-rut performance of whole asphalt pavement structure.Also therefore such phenomenon occurred, the anti-rut performance of each brea bed satisfies the dynamic stability index request of stipulating in the wheel tracking test in the pavement structure, but more serious rut disease still occurred in the actual road surface.Tracing it to its cause, mainly be that what to test in the actual road surface is the anti-rut performance of whole pavement structure, and the reaction of traditional wheel tracking test method only is the anti-rut performance of certain asphalt pavement material.
Some researchists have carried out the research of the anti-rut performance of asphalt pavement structure for this reason, and double-layer structure, three-decker are arranged.The die trial of multiple layer combination structure asphalt rut is achieved in that die trial is made of base plate and four side plates, and four side plates are installed on the base plate 5, forms the container of a carrying asphalt.All exceed other two side plates rolling two side forms that direction arranges along wheel tracking test, and before and after it two sections cutting is set respectively, the cutting on two side plates is mutually corresponding.Be provided with respectively two side plates on the perpendicular direction direction rolling with wheel tracking test, these two side plate height are selected according to the height of every layer of asphalt, are fixed between two other side plate along cutting.
But the die trial of this multiple layer combination structure asphalt rut exists some defectives: the one, and side plate is easy to be stuck in the cutting, makes troubles to practical operation.The 2nd, this die trial is made troubles to the operation of turning the test specimen direction in two reverse direction roller-compaction processes of regulation and stipulation.In the rolling moulding, need to roll 2 in a direction first and come and go in the standard; Off-load; Lifting rolling wheel, with the test specimen reverses its direction; Adding identical load rolls till the Marshall standard packing 100% ± 1% again.The die trial of this multiple layer combination structure asphalt rut all exceeds other two side plates owing to rolling two side plates that arrange on the direction along wheel tracking test, so make troubles for the operation of turning the test specimen direction.The 3rd, two side plates of this die trial all exceed other two side plates, and make troubles to the demoulding by cutting and fixing in four limits.
Summary of the invention
The utility model easily is stuck in the cutting in order to solve the existing mold side plate exactly, and existing mold is given and to be turned the test specimen direction in two reverse direction rolling shaping test piece processes and make troubles, and the defective of making troubles to the demoulding.Thereby a kind of mould that can realize the whole anti-rut performance test of multilayer asphalt is proposed, with the purpose that reaches simple in structure, easy to use, production cost is low, easy to utilize.
The technical solution of the utility model:
A kind of mould that can realize the whole anti-rut performance test of multilayer asphalt comprises base plate and the side form more than 2 layers; The height of the number of plies of test specimen, each layer side form is decided according to the situation of simulated roadway structure, and the height of every layer of side form is 4~10cm;
As a kind of situation wherein, the situation of 4 layers of side form is specific as follows: from the bottom to top, comprise base plate, ground floor side form, second layer side form, the 3rd layer of side form, the 4th layer of side form; Base plate is long 32.8cm, wide 32.8cm, the rectangular parallelepiped of high 0.5cm; The xsect of each layer side form is " returning " font, and the outside is square, and the length of side is 32.8cm, and the inboard is square, and the length of side is 30cm; Four limits of every layer of side form are demountable part, are fixedly connected with by the side direction screw on four angles;
Base plate and each layer side form be the position of correspondence all around, is provided with the via hole, the threaded hole that are used for assembling of reservation; On four limits of plate upper surface, be provided with threaded hole No. 1 to No. 6; The ground floor side form is provided with via hole No. 1 to No. 6, and four limits on surface are provided with threaded hole No. 7 to No. 12 thereon; Second layer side form is provided with via hole No. 7 to No. 12, and four limits on surface are provided with threaded hole No. 13 to No. 18 thereon; The 3rd floor side form is provided with via hole No. 13 to No. 18, and four limits on surface are provided with threaded hole No. 19 to No. 24 thereon; The 4th floor side form is provided with via hole No. 19 to No. 24;
The via hole of identical numbering and threaded hole, corresponding supporting one by one; Via hole on the ground floor side form, the threaded hole with corresponding on the base plate is fixedly connected with by socket head cap screw; Second layer side form and ground floor side form, the 3rd layer of side form and second layer side form, the 4th layer of side form and the 3rd layer of side form are fixedly connected with same method.
The beneficial effects of the utility model:
1. each layer side form do not fixed, for convenience detach, can the different asphalt of layering moulding, thus the defective that existing wheel tracking test mould can only carry out single structure layer pitch mixing wheel tracking test improved, reached the purpose of carrying out the whole anti-rut performance test of multilayer asphalt;
2. overcome the multiple layer combination structure Asphalt Mixture Experiment die side plate that proposes in the former studies and easily be stuck in defective in the cutting;
3. overcome the multiple layer combination structure Asphalt Mixture Experiment mould that proposes in the former studies inconvenient to the operation that both direction rolling shaping test piece brings.
4. overcome the inconvenience that the multiple layer combination structure Asphalt Mixture Experiment mould that proposes in the former studies brings to the demoulding.No matter four limits of which layer side form can be for convenience detach.
5. simple in structure, easy to use, production cost is low, and is easy to utilize.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is combination schematic diagram of the present utility model;
Fig. 3 is the floor map of base plate;
Fig. 4 is the floor map of ground floor side form;
Fig. 5 is the floor map of second layer side form;
Fig. 6 is the floor map of the 3rd layer of side form;
Fig. 7 is the floor map of the 4th layer of side form.
Each mark of accompanying drawing represents respectively:
1-ground floor side form;
2-second layer side form;
The 3rd layer of side form of 3-;
The 4th layer of side form of 4-;
The 5-base plate;
On the L1-threaded hole 1(base plate);
On the L2-threaded hole 2(base plate);
On the L3-threaded hole 3(base plate);
On the L4-threaded hole 4(base plate);
On the L5-threaded hole 5(base plate);
On the L6-threaded hole 6(base plate);
On the L7-threaded hole 7(ground floor side form);
On the L8-threaded hole 8(ground floor side form);
On the L9-threaded hole 9(ground floor side form);
On the L10-threaded hole 10(ground floor side form);
On the L11-threaded hole 11(ground floor side form);
On the L12-threaded hole 12(ground floor side form);
On the L14-threaded hole 14(second layer side form);
On the L15-threaded hole 15(second layer side form);
On the L16-threaded hole 16(second layer side form);
On the L17-threaded hole 17(second layer side form);
On the L18-threaded hole 18(second layer side form);
On the 3rd layer of side form of L19-threaded hole 19();
On the 3rd layer of side form of L20-threaded hole 20();
On the 3rd layer of side form of L21-threaded hole 21();
On the 3rd layer of side form of L22-threaded hole 22();
On the 3rd layer of side form of L23-threaded hole 23();
On the 3rd layer of side form of L24-threaded hole 24();
On the G1-via hole 1(ground floor side form);
On the G2-via hole 2(ground floor side form);
On the G3-via hole 3(ground floor side form);
On the G4-via hole 4(ground floor side form);
On the G5-via hole 5(ground floor side form);
On the G6-via hole 6(ground floor side form);
On the G7-via hole 7(second layer side form);
On the G8-via hole 8(second layer side form);
On the G9-via hole 9(second layer side form);
On the G10-via hole 10(second layer side form);
On the G11-via hole 11(second layer side form);
On the G12-via hole 12(second layer side form);
On the 3rd layer of side form of G13-via hole 13();
On the 3rd layer of side form of G14-via hole 14();
On the 3rd layer of side form of G15-via hole 15();
On the 3rd layer of side form of G16-via hole 16();
On the 3rd layer of side form of G17-via hole 17();
On the 3rd layer of side form of G18-via hole 18();
On the 4th layer of side form of G19-via hole 19();
On the 4th layer of side form of G20-via hole 20();
On the 4th layer of side form of G21-via hole 21();
On the 4th layer of side form of G22-via hole 22();
On the 4th layer of side form of G23-via hole 23();
On the 4th layer of side form of G24-via hole 24().
Embodiment
A kind of mould that can realize the whole anti-rut performance test of multilayer asphalt comprises base plate and the side form more than 2 layers; The height of the number of plies of test specimen, each layer side form is decided according to the situation of simulated roadway structure, and the height of every layer of side form is 4~10cm;
As a kind of situation wherein, the situation of 4 layers of side form is specific as follows: from the bottom to top, comprise base plate, ground floor side form, second layer side form, the 3rd layer of side form, the 4th layer of side form; Base plate is long 32.8cm, wide 32.8cm, the rectangular parallelepiped of high 0.5cm; The xsect of each layer side form is " returning " font, and the outside is square, and the length of side is 32.8cm, and the inboard is square, and the length of side is 30cm; Four limits of every layer of side form are demountable part, are fixedly connected with by the side direction screw on four angles;
Base plate and each layer side form be the position of correspondence all around, is provided with the via hole, the threaded hole that are used for assembling of reservation; On four limits of plate upper surface, be provided with threaded hole No. 1 to No. 6; The ground floor side form is provided with via hole No. 1 to No. 6, and four limits on surface are provided with threaded hole No. 7 to No. 12 thereon; Second layer side form is provided with via hole No. 7 to No. 12, and four limits on surface are provided with threaded hole No. 13 to No. 18 thereon; The 3rd floor side form is provided with via hole No. 13 to No. 18, and four limits on surface are provided with threaded hole No. 19 to No. 24 thereon; The 4th floor side form is provided with via hole No. 19 to No. 24;
The via hole of identical numbering and threaded hole, corresponding supporting one by one; Via hole on the ground floor side form, the threaded hole with corresponding on the base plate is fixedly connected with by socket head cap screw; Second layer side form and ground floor side form, the 3rd layer of side form and second layer side form, the 4th layer of side form and the 3rd layer of side form are fixedly connected with same method.
Below in conjunction with accompanying drawing, workflow of the present utility model is further described.
As depicted in figs. 1 and 2, a kind of mould that can realize the whole anti-rut performance test of multilayer asphalt, comprise base plate, ground floor side form, second layer side form, the 3rd layer of side form, the 4th layer of side form (situation of more multi-layered side form, slightly).
They are according to being assembled by the mode on lower the reaching, for ease of assembly corresponding position is reserved around them respectively via hole, threaded hole.
As shown in Figure 3, base plate is long 32.8cm, wide 32.8cm, and the rectangular parallelepiped of high 0.5cm has been reserved six threaded holes on four limits on surface thereon, is respectively threaded hole 1, threaded hole 2, threaded hole 3, threaded hole 4, threaded hole 5, threaded hole 6.
As shown in Figure 4, the plane of ground floor side form is the square of outside length of side 32.8cm, the square of inboard length of side 30cm, six via holes have been reserved on its four limits, respectively via hole 1, via hole 2, via hole 3, via hole 4, via hole 5, via hole 6, having reserved six threaded holes on four limits on surface thereon, is respectively threaded hole 7, threaded hole 8, threaded hole 9, threaded hole 10, threaded hole 11, threaded hole 12.
As shown in Figure 5, the plane of second layer side form is the square of outside length of side 32.8cm, the square of inboard length of side 30cm, six via holes have been reserved on its four limits, respectively via hole 7, via hole 8, via hole 9, via hole 10, via hole 11, via hole 12, having reserved six threaded holes on four limits on surface thereon, is respectively threaded hole 13, threaded hole 14, threaded hole 15, threaded hole 16, threaded hole 17, threaded hole 18.
As shown in Figure 6, the plane of the 3rd layer of side form is the square of outside length of side 32.8cm, the square of inboard length of side 30cm, six via holes have been reserved on its four limits, respectively via hole 13, via hole 14, via hole 15, via hole 16, via hole 17, via hole 18, six threaded holes have been reserved on four limits on surface thereon, are respectively threaded hole 19, threaded hole 20, threaded hole 21, threaded hole 22, threaded hole 23, threaded hole 24.
As shown in Figure 7, the plane of the 4th layer of side form is the square of outside length of side 32.8cm, and the square of inboard length of side 30cm has been reserved six via holes on its four limits, is respectively via hole 19, via hole 20, via hole 21, via hole 22, via hole 23, via hole 24.
The ground floor side form is installed on the base plate, adopt socket head cap screw to pass via hole 1, via hole 2, via hole 3, via hole 4, via hole 5, the via hole 6 of ground floor side form, be fixed on threaded hole 1, threaded hole 2, threaded hole 3, threaded hole 4, threaded hole 5, threaded hole 6 on the base plate.Form the container of a carrying ground floor asphalt, so just can be according to the method roller-compaction ground floor test specimen of standard.
Then on ground floor side form surface second layer side form is installed, the employing socket head cap screw passes via hole 7, via hole 8, via hole 9, via hole 10, via hole 11, the via hole 12 on the second layer side form, is fixed on threaded hole 7, threaded hole 8, threaded hole 9, threaded hole 10, threaded hole 11, threaded hole 12 on the ground floor side form.Form the container of a carrying second layer asphalt, so just can be according to the method roller-compaction second layer test specimen of standard.
Next continue to install on the surface of second layer side form the 3rd layer of side form, adopt hex screw to pass the 3rd layer of via hole 13, via hole 14, via hole 15, via hole 16, via hole 17, the via hole 18 on the side form, be fixed on threaded hole 13, threaded hole 14, threaded hole 15, threaded hole 16, threaded hole 17, threaded hole 18 on the second layer side form.Form the container of the 3rd layer of asphalt of a carrying, so just can be according to the 3rd layer of test specimen of method roller-compaction of standard.
Next continue to install on the surface of the 3rd layer of die trial the 4th layer of side form, adopt hex screw to pass the 4th layer of via hole 19, via hole 20, via hole 21, via hole 22, via hole 23, the via hole 24 on the side form, be fixed on the 3rd layer of threaded hole 19, threaded hole 20, threaded hole 21, threaded hole 22, threaded hole 23, the threaded hole 24 on the side form.The upper surface of such the 3rd layer of bitumen mixture specimen and the 4th layer of side form have just formed a container that carries asphalt, same the 4th layer of test specimen of method roller-compaction according to standard.
By that analogy, can also continue to increase the number of plies of die trial, be not limited to 4 layers of a kind of situation.
The height of the number of plies of test specimen and each layer side form is according to the situation of the pavement structure of simulation and fixed.The height of every layer of side form is between 4~10cm, when the thickness of bituminous pavement single structure layer during greater than 10cm, must the layering moulding, and mainly be because forming machine can't guarantee that individual layer asphalt height is greater than the compactness of 10cm test specimen.Need to prove in addition, four limits of each layer side form are fixing by the side direction screw on four angles, and four limits are demountable.
Above content is in conjunction with concrete preferred implementation further detailed description of the utility model, can not assert that implementation of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field, without departing from the concept of the premise utility, can also make some simple deduction or replace, all should be considered as belonging to protection domain of the present utility model.

Claims (1)

1. the mould that can realize the whole anti-rut performance test of multilayer asphalt is characterized in that,
Comprise base plate (5) and the side form more than 2 layers; The height of the number of plies of test specimen, each layer side form is decided according to the situation of simulated roadway structure, and the height of every layer of side form is 4~10cm;
As a kind of situation wherein, the situation of 4 layers of side form is specific as follows:
From the bottom to top, comprise base plate (5), ground floor side form (1), second layer side form (2), the 3rd layer of side form (3), the 4th layer of side form (4);
Base plate (5) is long 32.8cm, wide 32.8cm, the rectangular parallelepiped of high 0.5cm;
The xsect of each layer side form is " returning " font, and the outside is square, and the length of side is 32.8cm, and the inboard is square, and the length of side is 30cm; Four limits of every layer of side form are demountable part, are fixedly connected with by the side direction screw on four angles;
Base plate (5) and each layer side form be the position of correspondence all around, is provided with the via hole, the threaded hole that are used for assembling of reservation;
On four limits of base plate (5) upper surface, be provided with threaded hole No. 1 to No. 6;
Ground floor side form (1) is provided with via hole No. 1 to No. 6, and four limits on surface are provided with threaded hole No. 7 to No. 12 thereon;
Second layer side form (2) is provided with via hole No. 7 to No. 12, and four limits on surface are provided with threaded hole No. 13 to No. 18 thereon;
The 3rd floor side form (3) is provided with via hole No. 13 to No. 18, and four limits on surface are provided with threaded hole No. 19 to No. 24 thereon;
The 4th floor side form (4) is provided with via hole No. 19 to No. 24;
The via hole of identical numbering and threaded hole, corresponding supporting one by one; Via hole on the ground floor side form (1) with the upper corresponding threaded hole of base plate (5), is fixedly connected with by socket head cap screw; Second layer side form (2) and ground floor side form (1), the 3rd layer of side form (3) and second layer side form (2), the 4th layer of side form (4) and the 3rd layer of side form (3) are fixedly connected with same method.
CN 201320263973 2013-05-15 2013-05-15 Mold capable of realizing integral track-resistance test of multilayer asphalt mixture Expired - Fee Related CN203241277U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320263973 CN203241277U (en) 2013-05-15 2013-05-15 Mold capable of realizing integral track-resistance test of multilayer asphalt mixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320263973 CN203241277U (en) 2013-05-15 2013-05-15 Mold capable of realizing integral track-resistance test of multilayer asphalt mixture

Publications (1)

Publication Number Publication Date
CN203241277U true CN203241277U (en) 2013-10-16

Family

ID=49318562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320263973 Expired - Fee Related CN203241277U (en) 2013-05-15 2013-05-15 Mold capable of realizing integral track-resistance test of multilayer asphalt mixture

Country Status (1)

Country Link
CN (1) CN203241277U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103323301A (en) * 2013-05-15 2013-09-25 山西省交通科学研究院 Mould for realization of multilayer asphalt mixture integral-body anti-rutting performance test
CN104132835A (en) * 2014-08-06 2014-11-05 浙江大学舟山海洋研究中心 Detachable easily-demolding combined concrete test mold
CN106442951A (en) * 2016-10-13 2017-02-22 沈阳建筑大学 Combined multifunctional track plate device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103323301A (en) * 2013-05-15 2013-09-25 山西省交通科学研究院 Mould for realization of multilayer asphalt mixture integral-body anti-rutting performance test
CN104132835A (en) * 2014-08-06 2014-11-05 浙江大学舟山海洋研究中心 Detachable easily-demolding combined concrete test mold
CN106442951A (en) * 2016-10-13 2017-02-22 沈阳建筑大学 Combined multifunctional track plate device

Similar Documents

Publication Publication Date Title
CN201965063U (en) Multi-layer composite structure asphalt mixture rutting test mould
CN203241277U (en) Mold capable of realizing integral track-resistance test of multilayer asphalt mixture
CN105862542B (en) Small-particle size macroporous multilayer porous asphalt pavement structure
CN101792996B (en) Asphalt concrete pavement utilizing self-generation of direct piezoelectric effect
CN202631352U (en) Multifunctional bituminous mixture track contrast test mold
CN103323381A (en) Method for evaluating attenuation degree of porous asphalt mixture void
CN103323301A (en) Mould for realization of multilayer asphalt mixture integral-body anti-rutting performance test
CN105160094B (en) Asphalt pavement rut analogy method
CN103323580A (en) Simulation device capable of simulating asphalt pavement ruts in longitudinal slope conditions
CN203259400U (en) Test die capable of realizing constant temperature bottom of wheel rut test specimen
CN200974957Y (en) Combined type crossing passing bridge
CN204027948U (en) The overall anti-rut behavior test mould of a kind of multilayer asphalt
CN208250831U (en) A kind of road structure of rubber tire guide rail trolley line
CN102587252A (en) Wavy high-precision curve cement concrete pavement construction method
CN204282137U (en) Adjustable many gauges operating desk position
CN206376165U (en) A kind of asphalt pavement structure with anti-cracking function
CN201169729Y (en) Crossroad traffic system
CN204286892U (en) A kind of rut temperature control mould of simulated roadway temperature field
CN107290212A (en) A kind of evaluation method of drainage index seam bond strength
CN203475262U (en) Structure of grade intersection
CN202787121U (en) Intelligent variable thundery sound warning traffic marking
CN203241278U (en) Thermal insulating layer for realizing temperature gradient of track test piece
CN202718021U (en) Heat insulation assembly type prestressed concrete pavement
CN203337487U (en) Simulator capable of simulating asphalt pavement track under longitudinal slope condition
CN204676459U (en) The environmental protection of urban road maidenliness is parked hurdle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016

Termination date: 20190515

CF01 Termination of patent right due to non-payment of annual fee