CN203218793U - Combined tool box for power construction overhead working - Google Patents

Combined tool box for power construction overhead working Download PDF

Info

Publication number
CN203218793U
CN203218793U CN 201320223934 CN201320223934U CN203218793U CN 203218793 U CN203218793 U CN 203218793U CN 201320223934 CN201320223934 CN 201320223934 CN 201320223934 U CN201320223934 U CN 201320223934U CN 203218793 U CN203218793 U CN 203218793U
Authority
CN
China
Prior art keywords
safety
combined tool
tool box
power construction
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320223934
Other languages
Chinese (zh)
Inventor
李广辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Baoding Power Supply Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201320223934 priority Critical patent/CN203218793U/en
Application granted granted Critical
Publication of CN203218793U publication Critical patent/CN203218793U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to the technical field of power construction, in particular to a combined tool box for power construction overhead working. The combined tool box comprises a material box, a material box suspension fixing mechanism, and tool hanging rings or hanging sleeves. By adopting the scheme, the combined tool box has the effects that: the combined tool box is fixed by adopting double screws, the installation is solid, the fall off phenomenon does not exist, the safety of operators is fully protected, the material box can be used for placing article such as cotter pins and wire clamps in use, and the placing problem of pole and tower operation tool and material is solved, thereby being in accord with the safety technical requirements. The combined tool box has the advantages of being simple in workmanship, convenient in fixation and high in safety factor, is conform to safety specification regulations, and eliminates the potential safety hazards.

Description

Power construction work high above the ground two-piece appliance case
Technical field
The utility model relates to the power construction technical field.
Background technology
At present, in electric power system, when electric power facility is safeguarded, tend to relate to climbing tower bar, need high-rise working, particularly we have to carry instrument and carry out high-rise working, even sometimes need carry a lot of instruments, these instruments do not have the space of depositing in the high-altitude, and easily fall, the careless slightly thing that just has falls and pounds the ground handling personnel, bring threat more seriously also may for work high above the ground personnel's safety, bring inconvenience for our safety management of working site, if directly instrument is placed on the cross-arm of tower bar, do not meet the requirement of trouble free service rules, cause Work tool to come off easily, do not note slightly injuring accident by a crashing object, the staff takes also inconvenient, in order to address this problem, the workmen has designed a kind of power construction work high above the ground two-piece appliance case through careful consideration, has solved the placement problem of operating personnel's Work tool material on the shaft tower, also avoid simultaneously the generation of security incident, improved coefficient of safety and operating efficiency.
The tool storage device that three kinds of electric operating aspects are arranged in the prior art, and these three kinds of devices all to have common characteristics be exactly the work high above the ground that does not all relate to climbing tower bar, it all is tool storage device on the ground or that use during operation on the ground, and its structure difference very big with this novel existence, first kind is that a kind of large-scale Work tool is deposited combined bay, is mainly used in depositing of relatively large Work tools such as " temporarily drawing " " hammer ram ", " digging shovel ", " averruncator ", " crowbar ", " spade ", " folding ladder "; Second kind is a kind of composite type managing security tools and instruments storage box, comprise casing, case lid and folding, casing is connected by folding with case lid, the grid of a plurality of storing toolses is set in the casing, places insulating bar, electrical verification nib, general insulated tension pole head and ground connection the end of a thread in the grid of storing tools respectively.The third is a kind of standardized tool case, belong to the tool box that is used for placing electrician's utensil, comprise casing, case lid, equal liner is useful on and places the sponge die body that electric power overhaul is used Work tool in case lid and the casing, and the sponge die body is provided with the Baltimore groove adaptive with electrician's utensil shape.Therefore above three kinds of prior aries all with novel have very big different.
So be badly in need of a kind of device of depositing the electric power utensil that can be convenient and safe when climbing the operation of tower bar at present, can the convenient working personnel carry out electric power facility and safeguard and guarantee its safety.
The utility model content
This novel technical problem that will solve provides a kind of two-piece appliance case that can solve the placement problem of operating personnel's Work tool material on the tower bar, the generation of also avoiding security incident simultaneously, raising coefficient of safety and operating efficiency.
For solving the problems of the technologies described above, technical solution adopted in the utility model provides a kind of power construction work high above the ground two-piece appliance case, it is characterized in that: comprise material cartridge, material cartridge hangs fixed mechanism, and is provided with instrument link or hanging sleeve.
Furthermore described suspension fixed mechanism comprises transverse slat, U-shaped card, connect transverse slat and material cartridge reinforcing rod, be connected the riser of transverse slat and U-shaped card.Described instrument link or hanging sleeve are 4 to 10, are welded on the transverse slat side by side.Wherein the framework of material cartridge is made up of reinforcing bar, sidewall and bottom surface use iron plate to be combined into, material cartridge is by reinforcing bar and transverse slat welding, instrument link or hanging sleeve are welded on the transverse slat side by side, horizontal version is by perpendicular version and U-shaped card welding, the screw hole that two groups of correspondences are arranged between the top plate of U-shaped card and the lower plywood, the cross-arm that is used for wearing screw and tower bar is fixed.
The effect that adopts technique scheme to obtain: this device adopts two screws to fix; install firmly; there is not obscission; protected operating personnel's safety fully; material cartridge can be placed article such as drift bolt, wire clamp during use, can insert climbers in instrument link or hanging sleeve, Work tool such as cut greatly, conveniently takes and deposits; solve the placement problem of shaft tower operation Work tool material, met the safety specifications of " bigger instrument should be fixed on the firm member ".This device is done manual work simple, convenient fixing, and the coefficient of safety height meets the safety regulations regulation, has eliminated potential safety hazard.
Description of drawings
The structural representation of an embodiment of Fig. 1 the utility model;
Among the figure: 1, material cartridge 2, link or hanging sleeve 3, transverse slat 4, U-shaped card 5, screw 6, riser.
Embodiment
For solving the problems of the technologies described above, we describe according to figure, and this power construction work high above the ground two-piece appliance case comprises material cartridge 1 as shown in Figure 1, material cartridge 1 hangs fixed mechanism, and be provided with instrument link or hanging sleeve 2, and wherein material cartridge 1 is positioned at the foot of whole combined bay, and each limit of material cartridge 1 is that the reinforcing bar by diameter 0.5cm is welded, wherein grow limit 30cm, broadside 20cm is 10cm highly, and outer box wall welds with iron plate.
Described suspension fixed mechanism comprises transverse slat 3, U-shaped card 4, connect the reinforcing rod of transverse slat 3 and material cartridge 1, be connected the riser 6 of transverse slat 3 and U-shaped card 4.The welding of the two ends, long limit on a top of described suspension fixed mechanism bottom and material cartridge 1, the middle part that hangs fixed mechanism is made of instrument link or hanging sleeve 2 and transverse slat 3.Described instrument link or hanging sleeve 2 are the iron pipe of 1.5 cun of 4 to 10 long 5cm diameters, be welded on side by side on the transverse slat 3, this transverse slat 3 generally also adopts band iron, and the top of described suspension fixed mechanism is by riser 6 and U-shaped card 4 welding, and transverse slat 3 also welds together with riser 6.Two groups of corresponding holes of upper-lower position are arranged above the described U-shaped card 4, be used for wearing up and down screw 5 and fix with the cross-arm of tower bar.Can fix with cross-arm by the screw 5 by on the U-shaped card 4 when carrying out tower bar high-rise working, material cartridge 1 can be placed article such as drift bolt, wire clamp during use, can insert climbers and Work tool such as cut greatly and conveniently take and deposit in iron pipe.
The effect that adopts technique scheme to obtain: this device adopts two screws to fix; install firmly; there is not obscission; protected operating personnel's safety fully; material cartridge can be placed article such as drift bolt, wire clamp during use, can insert climbers in iron pipe, Work tool such as cut greatly, conveniently takes and deposits; solve the placement problem of shaft tower operation Work tool material, met the safety specifications of " bigger instrument should be fixed on the firm member ".This device is done manual work simple, convenient fixing, and the coefficient of safety height meets the safety regulations regulation, has eliminated potential safety hazard.

Claims (3)

1. power construction work high above the ground two-piece appliance case is characterized in that: comprise material cartridge (1), material cartridge (1) hangs fixed mechanism, and is provided with instrument link or hanging sleeve (2).
2. power construction work high above the ground two-piece appliance case according to claim 1 is characterized in that: described suspension fixed mechanism comprises transverse slat (3), U-shaped card (4), connect transverse slat (3) and material cartridge (1) reinforcing rod, be connected the riser (6) of transverse slat (3) and U-shaped card (4).
3. power construction work high above the ground two-piece appliance case according to claim 1, it is characterized in that: described instrument link or hanging sleeve (2) are 4 to 10, are welded in side by side on the transverse slat (3).
CN 201320223934 2013-04-28 2013-04-28 Combined tool box for power construction overhead working Expired - Fee Related CN203218793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320223934 CN203218793U (en) 2013-04-28 2013-04-28 Combined tool box for power construction overhead working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320223934 CN203218793U (en) 2013-04-28 2013-04-28 Combined tool box for power construction overhead working

Publications (1)

Publication Number Publication Date
CN203218793U true CN203218793U (en) 2013-09-25

Family

ID=49208296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320223934 Expired - Fee Related CN203218793U (en) 2013-04-28 2013-04-28 Combined tool box for power construction overhead working

Country Status (1)

Country Link
CN (1) CN203218793U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103227432A (en) * 2013-04-28 2013-07-31 国家电网公司 Combined device box for power construction overhead work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103227432A (en) * 2013-04-28 2013-07-31 国家电网公司 Combined device box for power construction overhead work

Similar Documents

Publication Publication Date Title
CN103227432A (en) Combined device box for power construction overhead work
CN103683088A (en) Line bracing tool
CN204531457U (en) The three-dimensional operation protector of a kind of power construction easy for installation
CN201374521Y (en) Equipotential ladder
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN203218793U (en) Combined tool box for power construction overhead working
CN201466574U (en) Device for isoelectrically replacing insulator and accessory of iron tower of transmission line
CN205314654U (en) Reinforcement iron tower of power transmission sequence
CN102704828A (en) Multifunctional hook ladder
CN201742027U (en) Special tool for replacing insulators in electriferous state for 110kV single tower double circuit
CN104514485A (en) Overhead-line rod working ladder
CN203826844U (en) Electric power aerial operation platform
CN104184071B (en) Unmanned plane installs 110kV 500kV line security ground wire device
CN204858403U (en) Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity
CN106602465A (en) Power transmission line tangent tower first insulator replacement tool
CN203632113U (en) Portable safety string bag for electric pole
CN207765393U (en) A kind of bushing apparatus for voltage transformer high voltage safety tube
CN202564818U (en) Substation equipment bolt charged fastening device
CN202153620U (en) Equipotential working insulating platform
CN204243604U (en) A kind of instrument with cable address bus shaft tower phase-sequence plate
CN205092110U (en) Safe transformer rack
CN206259651U (en) A kind of rural area fault maintenance activity device
CN205484430U (en) Transformer high -voltage testing support
CN205791271U (en) Fixing sleeve for wire stripper
CN210186268U (en) Transformer overhauls safety belt linkage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925