CN203179365U - Simulation training device of indoor distributing lines - Google Patents
Simulation training device of indoor distributing lines Download PDFInfo
- Publication number
- CN203179365U CN203179365U CN 201320168565 CN201320168565U CN203179365U CN 203179365 U CN203179365 U CN 203179365U CN 201320168565 CN201320168565 CN 201320168565 CN 201320168565 U CN201320168565 U CN 201320168565U CN 203179365 U CN203179365 U CN 203179365U
- Authority
- CN
- China
- Prior art keywords
- shaft tower
- training device
- cable
- pole tower
- distribution circuit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses a simulation training device of indoor distributing lines. The device comprises two pole tower fixing devices which are in a right angle connection. The pole tower fixing device is provided with two parallel tracks. Each of the two parallel tracks is provided with a plurality of pieces of channel steel which are connected together via bolts. The end part of each pole tower fixing device is provided with a hanging line point. The position between the two tracks is provided with three steel tube fixing devices respectively. Each of the three steel tube fixing devices is provided with a pole tower. A cable between a first pole tower and a second pole tower is provided with a first transformer. The cable between a fifth pole tower and a sixth pole tower is provided with a high voltage switch, a falling type fuse, a lightening arrester, a second transformer and a combined switch cabinet which are interconnected with each other. A third pole tower is installed on the corner of the right angle and is provided with two self-pulling lines. The third pole tower is connected with the second pole power and a fourth pole power respectively via the cable. The first pole tower and the sixth pole tower are respectively provided with an oblique line of 45 degrees. A maintenance work of indoor training distributing lines of trainees can be satisfied by the simulation training device.
Description
Technical field
The utility model relates to a kind of interior distribution circuit simulation and training device.
Background technology
The integral body that electric system is made up of generating, transmission of electricity, power transformation, distribution and electricity consumption, the part of wherein conveying, conversion and distribution electric energy, the electric line that comprises ascending, descending transformer and various electric pressures is positioned at the open air mostly, this is subjected to season, climatic influences easily with regard to feasible practice-training teaching to this part, under some extreme weather conditions even can't finish training, therefore need to build the indoor linemen's' simulation and training device of a cover, reach the requirement to distribution line O﹠M and the round-the-clock practice-training teaching of service work.
In the prior art, distribution line shaft tower height is generally 12 meters or 15 meters, and what can't be implemented in 3 meters floor heights indoorly carries out corresponding service work, and, in the existing technology, outdoor distribution line and equipment are not installed in indoorly, more do not propose to fix shaft tower with steel tank.
The utility model content
The utility model provides a kind of interior distribution circuit simulation and training device in order to address the above problem, and can finish the task of relating to the various operation trainings of distribution line worker, reach the requirement of round-the-clock practice-training teaching, it is rational in infrastructure, and security is good, has improved training efficiency and training quality.
To achieve these goals, the utility model adopts following technical scheme:
A kind of interior distribution circuit simulation and training device, comprise two shaft tower stationary installations that the right angle connects, described each shaft tower stationary installation comprises some segmentation channel-section steels, the end of described every shaft tower stationary installation is respectively equipped with the hanging wire point, each shaft tower stationary installation is respectively equipped with some steel pipe stationary installations at interval, a shaft tower is installed on described each steel pipe stationary installation, cable between at least two adjacent shaft towers is provided with transformer, at least the cable between two other adjacent shaft tower is provided with interconnective high-voltage switch gear, fuse switch, lightning arrester, transformer and switchboard assembly, the shaft tower that is installed in the corner at right angle is provided with at least two from backguy, all connect by cable between the described shaft tower, the shaft tower of described shaft tower stationary installation end is fixed on the corresponding hanging wire point by 45 degree lateral conductors respectively, and described lateral conductor is used for preventing the shaft tower lodging.
Gold utensil on some shaft towers all adopts the bar type porcelain vase, and the cable between some shaft towers adopts 90 insulated copper wires, and cable adopts the insulation strain clamp with being connected of gold utensil.
Gold utensil on some shaft towers adopts the suspension type porcelain vase to connect.
Described shaft tower comprises steel pipe, welding steel below the steel pipe, and described steel plate is provided with 6 holes, and adopting diameter is the seamless coating steel pipe of 220mm.
Be provided with combined switch, CT and gauging table in the described switchboard assembly.
Described channel-section steel adopts the 18# channel-section steel.
Described shaft tower is installed in the steel pipe stationary installation by ring flange, the shaft tower fixed form adopts pre-buried flange to connect 2.2 meters of shaft tower height, 3 meters of shaft tower spacings, every shaft tower is provided with two of fault address instrument and bird-scaring units, and described shaft tower and cable are provided with the reflecting marking board.
1.2 meters of every channel-section steel length, 0.6 meter of width.
Described transformer is used for measuring the practice-training teaching of substation transformer insulation resistance, direct current resistance and the electrical test of polarity group no-load voltage ratio.
The beneficial effects of the utility model:
1, this actual training device can provide several stations, satisfies the real training demand that 30 people carry out lead connection, porcelain vase colligation simultaneously, become real training projects such as platform installation, gold utensil, accessory replacing, installation;
2, the shaft tower height of this actual training device is 2.2 meters, can provide the environment that step on the tower training for new student, and that both can satisfy the student steps on the tower needs, can guarantee the safety of student when training again, training student's psychological quality;
3, this actual training device is provided with channel-section steel, and the loaded down with trivial details work such as can avoid laying the foundations on the ground of this device can realize fixing with the connection between the channel-section steel purpose of shaft tower;
4, this actual training device adopts steel pipe to substitute traditional cement shaft tower, can weight reduction, and the saving material;
5, the shaft tower of this actual training device is provided with 45 ° of lateral conductors, can effectively prevent the shaft tower lodging;
6, solved the problem that distribution line can't carry out outdoor training because of season, climatic influences, the trainer can guard and instruct nearby, the integrated various operation training projects of distribution line worker can intensive use resource, has reduced the wasting of resources and has saved the comprehensive method of investment.The construction technology of analog line has reached the construction criteria of high grade project, and is safe and reliable, and the circuit corridor is smooth attractive in appearance.
Description of drawings
Fig. 1 is the distribution line planimetric map;
Fig. 2 is pole and tower foundation figure;
Fig. 3 is the shaft tower scheme of installation.
Wherein, 1, first shaft tower, 2, second shaft tower, the 3, the 3rd shaft tower, 4, the 4th shaft tower, the 5, the 5th shaft tower, the 6, the 6th shaft tower, 7, first transformer, 8, second transformer, 9, the first shaft tower lateral conductor, the 10, the 6th shaft tower lateral conductor, 11, from backguy, 12, switchboard assembly, 13, long cable section of ingoing line, 14, cable outlet, 15 first shaft tower lateral conductor hanging points, 16, the 6th shaft tower lateral conductor hanging point, the 17, the 3rd shaft tower lateral conductor hanging point, 18, channel-section steel, 19, steel pipe, 20, steel plate, 21, the hole.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing and embodiment.
As shown in Figure 1, a kind of interior distribution circuit simulation and training device, comprise two shaft tower stationary installations that the right angle connects, described shaft tower stationary installation comprises two parallel orbits, every track comprises some by bolted channel-section steel 18, the end of described every shaft tower stationary installation is respectively equipped with the hanging wire point, be respectively equipped with three steel pipe stationary installations between two tracks, a shaft tower is installed on described each steel pipe stationary installation, cable between described first shaft tower 1 and second shaft tower 2 is provided with first transformer 7, cable between described the 5th shaft tower 5 and the 6th shaft tower 6 is provided with interconnective high-voltage switch gear, fuse switch, lightning arrester, second transformer 8 and switchboard assembly 12, be provided with long cable section of ingoing line 13 between second transformer 8 and the switchboard assembly 12, the other end of switchboard assembly 12 is provided with cable outlet 14, described the 3rd shaft tower 3 is installed in the corner at right angle and is provided with two from backguy 11, described the 3rd shaft tower 3 is connected with the 4th shaft tower 4 with second shaft tower 2 by cable respectively, described first shaft tower 1 and the 6th shaft tower 6 are respectively equipped with the first shaft tower lateral conductor 9 and the 6th shaft tower lateral conductor 10, and the described first shaft tower lateral conductor 9 all becomes miter angle with ground with the 6th shaft tower lateral conductor 10.
Gold utensil on described first shaft tower 1, second shaft tower 2 and the 3rd shaft tower 3 all adopts the bar type porcelain vase, and the cable between described first shaft tower 1, second shaft tower 2 and the 3rd shaft tower 3 adopts 90 insulated copper wires, and cable adopts the insulation strain clamp with being connected of gold utensil.
Gold utensil on described the 3rd shaft tower 3, the 4th shaft tower 4, the 5th shaft tower 5 and the 6th shaft tower 6 adopts the suspension type porcelain vase to be connected.
As shown in Figure 2, the first shaft tower lateral conductor 9 is fixed on the first shaft tower lateral conductor hanging point 15, and the 6th shaft tower lateral conductor 10 is fixed on the 6th shaft tower lateral conductor hanging point 16, being fixed on the 3rd shaft tower lateral conductor hanging point 17 from backguy 11 of the 3rd shaft tower 3.
As shown in Figure 3, described shaft tower comprises steel pipe 19, steel pipe 19 following welding steels 20, and described steel plate 20 is provided with 6 holes 21, and adopting diameter is the seamless coating steel pipe of 220mm.
Be provided with combined switch, CT and gauging table in the described switchboard assembly 12, the installation wiring practice-training teaching that can be correlated with.
Described channel-section steel 18 adopts the 18# channel-section steel.
Described shaft tower is installed in the steel pipe stationary installation by ring flange, and the shaft tower fixed form adopts pre-buried flange to connect 2.2 meters of shaft tower height, 3 meters of shaft tower spacings.Every shaft tower is provided with two of fault address instrument and bird-scaring units.Described shaft tower and cable are provided with the reflecting marking board.
1.2 meters of every channel-section steel 18 length, 0.6 meter of width are in case the lodging of stopping bar tower.
Described first transformer 7 and second transformer 8 are used for measuring the practice-training teaching of substation transformer insulation resistance, direct current resistance and the electrical test of polarity group no-load voltage ratio.
Though above-mentionedly by reference to the accompanying drawings embodiment of the present utility model is described; but be not the restriction to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various modifications that creative work can make or distortion still in protection domain of the present utility model.
Claims (8)
1. interior distribution circuit simulation and training device, it is characterized in that, comprise two shaft tower stationary installations that the right angle connects, described each shaft tower stationary installation comprises some segmentation channel-section steels, the end of described every shaft tower stationary installation is respectively equipped with the hanging wire point, each shaft tower stationary installation is respectively equipped with some steel pipe stationary installations at interval, a shaft tower is installed on described each steel pipe stationary installation, cable between at least two adjacent shaft towers is provided with transformer, at least the cable between two other adjacent shaft tower is provided with interconnective high-voltage switch gear, fuse switch, lightning arrester, transformer and switchboard assembly, the shaft tower that is installed in the corner at right angle is provided with at least two from backguy, all connect by cable between the described shaft tower, the shaft tower of described shaft tower stationary installation end is fixed on the corresponding hanging wire point by 45 degree lateral conductors respectively.
2. a kind of interior distribution circuit simulation and training device as claimed in claim 1 is characterized in that the gold utensil on some shaft towers all adopts the bar type porcelain vase, and the cable between some shaft towers adopts 90 insulated copper wires, and cable adopts the insulation strain clamp with being connected of gold utensil.
3. a kind of interior distribution circuit simulation and training device as claimed in claim 1 is characterized in that, the gold utensil on some shaft towers adopts the suspension type porcelain vase to connect.
4. a kind of interior distribution circuit simulation and training device as claimed in claim 1 is characterized in that described shaft tower comprises steel pipe, welding steel below the steel pipe, and described steel plate is provided with 6 holes, and adopting diameter is the seamless coating steel pipe of 220mm.
5. a kind of interior distribution circuit simulation and training device as claimed in claim 1 is characterized in that, is provided with combined switch, CT and gauging table in the described switchboard assembly.
6. a kind of interior distribution circuit simulation and training device as claimed in claim 1 is characterized in that, described channel-section steel adopts the 18# channel-section steel.
7. a kind of interior distribution circuit simulation and training device as claimed in claim 1, it is characterized in that, described shaft tower is installed in the steel pipe stationary installation by ring flange, the shaft tower fixed form adopts pre-buried flange to connect, 2.2 meters of shaft tower height, 3 meters of shaft tower spacings, every shaft tower are provided with two of fault address instrument and bird-scaring units, and described shaft tower and cable are provided with the reflecting marking board.
8. a kind of interior distribution circuit simulation and training device as claimed in claim 1 is characterized in that, 1.2 meters of every channel-section steel length, 0.6 meter of width.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320168565 CN203179365U (en) | 2013-04-07 | 2013-04-07 | Simulation training device of indoor distributing lines |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320168565 CN203179365U (en) | 2013-04-07 | 2013-04-07 | Simulation training device of indoor distributing lines |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203179365U true CN203179365U (en) | 2013-09-04 |
Family
ID=49076034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320168565 Expired - Fee Related CN203179365U (en) | 2013-04-07 | 2013-04-07 | Simulation training device of indoor distributing lines |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203179365U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103218941A (en) * | 2013-04-07 | 2013-07-24 | 国网技术学院 | Simulated practical training device for indoor distribution line |
-
2013
- 2013-04-07 CN CN 201320168565 patent/CN203179365U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103218941A (en) * | 2013-04-07 | 2013-07-24 | 国网技术学院 | Simulated practical training device for indoor distribution line |
CN103218941B (en) * | 2013-04-07 | 2014-12-10 | 国网技术学院 | Simulated practical training device for indoor distribution line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105298201A (en) | Electric-transmission-line cable-terminal three-dimensional downwards-leading device | |
CN205116866U (en) | Device is down drawn to transmission line cable termination solid | |
CN103218941B (en) | Simulated practical training device for indoor distribution line | |
CN104314355A (en) | T-joint steel pipe pole with special-shape crossarms | |
CN203179365U (en) | Simulation training device of indoor distributing lines | |
CN109958609B (en) | Construction method of intelligent power air supply system of tunnel variable frequency air compressor unit | |
CN203026897U (en) | Power cable distribution box | |
CN2727910Y (en) | Photoelectric composite aerial earth wire | |
CN201616609U (en) | Special wind-power tower transformer substation | |
CN205724627U (en) | A kind of three-dimensional compact outlet structure being applicable to transformer station 330kV GIS | |
CN201846015U (en) | GIS (global information system) power distribution unit adopting one and half breaker connection | |
CN204497600U (en) | A kind of rack mounting structure of indoor distribution | |
CN204343772U (en) | Narrow base cable shoe steel tube tower under four return cable | |
CN207518166U (en) | Power plant 1000kV outlet grade transmitting system mounting structures | |
CN204992451U (en) | Cable T that realizes singly wiring back connects scheme platform | |
CN206575071U (en) | A kind of tree-like door frame outlet structure of 330kV open airs GIS power distribution equipments | |
CN210723704U (en) | Double-layer linear outgoing line arrangement structure of 220kV indoor GIS equipment | |
CN207282908U (en) | The 500kV power distribution equipments arranged using half c-type | |
CN111817288A (en) | Site arrangement method and structure applied to power distribution network true test platform | |
CN202978001U (en) | Complete switch cabinet assembly type bus bridge stand | |
CN102611095B (en) | Wide-area grounding method for extra/ultra-high-voltage direct-current power transmission system | |
CN206195163U (en) | Outdoor prefabricated formula generating line | |
CN205489250U (en) | GIS distribution device arrangement structure that business turn over line framework merges | |
Weinlein | A1. 1 Worldwide experiences and challenges with EHV XLPE cable projects 330 kV to 500 kV | |
CN205646451U (en) | Distribution system of being qualified for next round of competitions of GIS transformer substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130904 Termination date: 20140407 |