CN203160540U - Novel precast column - Google Patents

Novel precast column Download PDF

Info

Publication number
CN203160540U
CN203160540U CN 201320154539 CN201320154539U CN203160540U CN 203160540 U CN203160540 U CN 203160540U CN 201320154539 CN201320154539 CN 201320154539 CN 201320154539 U CN201320154539 U CN 201320154539U CN 203160540 U CN203160540 U CN 203160540U
Authority
CN
China
Prior art keywords
prefabricated post
steel pipe
epimere
hypomere
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320154539
Other languages
Chinese (zh)
Inventor
肖景平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Original Assignee
HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAHUI ENGINEERING DESIGN GROUP Co Ltd filed Critical HUAHUI ENGINEERING DESIGN GROUP Co Ltd
Priority to CN 201320154539 priority Critical patent/CN203160540U/en
Application granted granted Critical
Publication of CN203160540U publication Critical patent/CN203160540U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a novel precast column. The novel precast column comprises a lower precast column segment and an upper precast column segment, wherein the upper precast column segment is matched with the lower precast column segment, a first vertical reinforcing steel bar extending out of the upper end and the lower end of the lower precast column segment is arranged inside the lower precast column segment, a first connecting piece is arranged at the lower end of the lower precast column segment, a first steel pipe and a first flange plate welded on the top of the first steel pipe are arranged at the upper end of the lower precast column segment, a second vertical reinforcing steel bar extending out of the upper end and the lower end of the upper precast column segment is arranged inside the upper precast column segment, a second connecting piece is arranged at the upper end of the upper precast column segment, a second steel pipe and a second flange plate welded on the top of the second steel pipe are arranged at the lower end of the upper precast column segment, two auxiliary steel pipes are abut-jointed on the top of a second pre-embedded steel pipe, the first flange plate is abut-jointed with the second flange plate through a bolt, the first connecting piece is connected with the second connecting piece through a bolt, and stirrups are assembled on the first vertical steel reinforcing steel bar and the second vertical reinforcing steel bar. The novel precast column provided by the utility model has the advantages of simple construction, pretty low cost, adaptability to buildings with quit high floor height, and quite large column cross section, and the like.

Description

A kind of novel prefabricated post
Technical field
The utility model relates to a kind of building prefabricated components, is specifically related to a kind of novel prefabricated post, belongs to technical field of civil engineering.
Background technology
In order to enhance productivity, reduce personnel labor intensity, and improve the building unit quality, at present in the industrialization of construction industry field, generally studying the prefabricated of reinforced concrete building member, as reinforced concrete prefabricated column, reinforced concrete prefabricated beam, reinforced concrete prefabricated board.
Wherein, aspect reinforced concrete prefabricated column, the key technology difficult point that need to solve is the hypomere prefabricated post and being connected of epimere prefabricated post, two kinds of solutions are arranged at present, the one, hypomere prefabricated post vertical reinforcement is reserved long length at the prefabricated post end face, and stretch out floor end face certain-length, and the epimere prefabricated post is connected with steel bar connector at the lower end vertical reinforcement, the floor between the last hypomere prefabricated post build finish after, the epimere prefabricated post risen winch to the relevant position, and the vertical reinforcement that the reinforcing bar prefabricate that makes epimere prefabricated post lower end stretches out flooring with the hypomere prefabricated post is inserted in, and one by one steel bar connector injected high-strength fast hard non-shrinkage cement mortar then.Another kind of way is that last hypomere prefabricated post is connected vertical reinforcement in corresponding bean column node position by welding or mechanical connection manner, adopt diagonal brace then or utilize up and down the built-in connection of shell of column make the epimere prefabricated post at beam-column connection and corresponding floor plates construction stage retaining member the plane stability under wind load and other horizontal loads.
The first method key of success is the quality of reinforcing bar connector and high-strength fast hard non-shrinkage cement mortar, its corresponding technical requirements is higher, the problem that exists is that each root vertical reinforcement all needs a reinforcing bar connector, and need slip casting one by one, cost of production is higher, and it is more loaded down with trivial details to construct, and the centering requirement of last hypomere prefabricated post vertical reinforcement and reinforcing bar connector is high, the centering difficulty is big, particularly when last prefabricated post reduced cross-sectional, all the more so.Therefore the prefabricated post of using this method to connect generally is applicable to multilayer, up and down the unconverted building of column section.
The difficult point of second method construction is at the intensive position of this reinforcing bar of beam-column connection, because there being the built-in connection of prefabricated post, can make that the beam longitudinal reinforcement that stretches into bean column node passes through bean column node for the built-in connection of avoiding prefabricated post need detour, so increased the beam steel difficulty of processing, also influenced the anchoring effect of beam steel, on the other hand in order to guarantee that the epimere prefabricated post is keeping plane stability at beam-column connection and corresponding floor plates construction stage, its built-in connection cross section can be bigger, and the connection of prefabricated post built-in connection and vertical reinforcement are to be in a kind of work high above the ground state when connecting, both dangerous also inconvenient, efficiency of construction is lower.Therefore this connected mode is applicable to the building that column section is less, the floor floor height is lower.
Therefore, for solving the problems of the technologies described above, necessaryly provide a kind of novel prefabricated post, to overcome described defective of the prior art.
The utility model content
For addressing the above problem, the purpose of this utility model is to provide a kind of construction simple, and cost is lower, can be applicable to the novel prefabricated post of the building that floor height is higher, column section is bigger.
For achieving the above object, the technical scheme that the utility model is taked is: a kind of novel prefabricated post, and it comprises at least one hypomere prefabricated post and the epimere prefabricated post that cooperates with the hypomere prefabricated post; Wherein, be provided with first vertical reinforcement in the described hypomere prefabricated post, this first vertical reinforcement extends the two ends up and down of hypomere prefabricated post; The lower end of this hypomere prefabricated post is provided with first connector, and the upper end is provided with first steel pipe and is welded on first flange of the first steel pipe end face; Be provided with second vertical reinforcement in the described epimere prefabricated post, this second vertical reinforcement extends the two ends up and down of epimere prefabricated post; The lower end of this epimere prefabricated post is provided with second connector, and the upper end is provided with second steel pipe and is welded on second flange of the second steel pipe end face; Two auxiliary steel pipes of top butt joint of described second embedded steel tube, this auxiliary steel pipe extends to central authorities from the side of epimere prefabricated post; Described first flange and second flange dock by bolt; Described first connector also is connected by bolt with second connector; Be banded with stirrup on described first vertical reinforcement and second vertical reinforcement.
Novel prefabricated post of the present utility model further is set to: the end that described first steel pipe is nuzzled in the hypomere prefabricated post in advance is what seal, and described second steel pipe is nuzzled a end in the epimere prefabricated post in advance also for sealing; The link of described first steel pipe and first flange is opening, and the link of described second steel pipe and second flange also is opening.
Novel prefabricated post of the present utility model further is set to: be respectively equipped with some oval-shaped holes on described first steel pipe and second steel pipe, the hole minimum widith is not less than 50mm.
Novel prefabricated post of the present utility model further is set to: the cross section of described first flange is rectangular, and four limits of rectangle are parallel with four limits in described hypomere prefabricated post cross section; The cross section of described second flange is also rectangular, and four limits of rectangle are parallel with four limits in described epimere prefabricated post cross section.
Novel prefabricated post of the present utility model further is set to: described first connector and second connector are channel-section steel, have the bolt hole of equidistant layout on the channel-section steel; Described first connector is arranged on the inboard of first vertical reinforcement in four bights of hypomere prefabricated post; Described second connector is arranged on the inboard of second vertical reinforcement in four bights of epimere prefabricated post.
Novel prefabricated post of the present utility model further is set to: described auxiliary pipe diameter is 50 ~ 100mm, is stamped the flexible plastic lid on its opening.
Novel prefabricated post of the present utility model further is set to: the length of described hypomere prefabricated post is 1000 ~ 1500mm.
Novel prefabricated post of the present utility model also is set to: be embedded with the curved ring of the type that returns by the HPB300 reinforcement fabrication on four sides of described epimere prefabricated post, this time type curved loop portion branch exposes.
Compared with prior art, the utlity model has following beneficial effect:
Hypomere prefabricated post of the present utility model and epimere prefabricated post be connected comparatively simple, no higher technical quality requirement, easy to utilize, and prefabricated and construction cost is not high.
2. the utility model only is provided with four channel-section steels in the bight at the bean column node position, there is not other connector, to stretching into beam steel in the post without any influence, and the hypomere prefabricated post is shorter because of its steel concrete main part, so its deadweight is lighter, can be completely fixed after connecting by channel-section steel, and easy construction, safe and reliable.
3. go up the steel pipe that the hypomere prefabricated post connects usefulness, because of the prefabricated post prefabricate, so its epimere prefabricated post length is also less relatively, so the diameter of steel tube that steel pipe can be buried underground at the bean column node place is littler, and the making of the pre-buried position coupled columns vertical reinforcement of steel pipe, stirrup etc. does not all have influence.
4. the setting of auxiliary steel pipe has solved the concreting problem of prefabricated post connecting portion up and down effectively, by an auxiliary steel pipe concreting, discharge air by another auxiliary steel pipe, and overflow auxiliary steel pipe by concrete and can also understand concrete building intuitively and finish, can guarantee the concreting effect of post connecting portion.
5. go up the lower prop connecting portion on floor top 1 meter to 2 meters scope, evaded the work high above the ground problem thus, be conducive to construction operation, increased convenience and the safety of construction.
6. described steel pipe can also effectively improve post in the shear resistant capacity of normal operational phase, avoids the shear failure of connecting portion.
7. described square-section flange can make things convenient for prefabricated post that the location is installed, and evades when using the circular flange dish, and the last lower prop that may occur is located phenomenons such as being forbidden, make mistakes.
8. this prefabricated post can be applicable to that up and down column section need change, floor height is higher, or the integral precast structure of the more highrise building of the number of plies, and applicable surface is wider.
Description of drawings
Fig. 1 is the sectional view of the hypomere prefabricated post of novel prefabricated post of the present utility model.
Fig. 2 is along the sectional view of A-A among Fig. 1.
Fig. 3 is along the sectional view of B-B among Fig. 1.
Fig. 4 is the sectional view of the epimere prefabricated post of novel prefabricated post of the present utility model.
Fig. 5 is along the sectional view of C-C among Fig. 4.
Fig. 6 is along the sectional view of D-D among Fig. 4.
Fig. 7 is the schematic diagram of novel prefabricated post of the present utility model.
The specific embodiment
See also Figure of description 1 to shown in the accompanying drawing 7, the utility model is a kind of novel prefabricated post, and it comprises at least one hypomere prefabricated post 1 and the epimere prefabricated post 2 that cooperates with hypomere prefabricated post 1.Described hypomere prefabricated post 1 can with same floor on epimere prefabricated post 2 be connected up and down, perhaps be connected up and down with the epimere prefabricated post 2 of its next floor.
Wherein, the length of described hypomere prefabricated post 1 is 1000 ~ 1500mm, is provided with first vertical reinforcement 11 in it, and this first vertical reinforcement 11 extends the two ends up and down of hypomere prefabricated post 1.The lower end of this hypomere prefabricated post 1 is provided with first connector 12, and the upper end is provided with first steel pipe 13 and is welded on first flange 14 of first steel pipe, 13 end faces.
Be provided with second vertical reinforcement 21 in the described epimere prefabricated post 2, this second vertical reinforcement 21 extends the two ends up and down of epimere prefabricated post 2.The lower end of this epimere prefabricated post 2 is provided with second connector 22, and the upper end is provided with second steel pipe 23 and is welded on second flange 24 of second steel pipe, 23 end faces.Two auxiliary steel pipes 25 of top butt joint of described second embedded steel tube 23.Should extend to central authorities from the side of epimere prefabricated post 2 by auxiliary steel pipe 25, its internal diameter is 50 ~ 100mm, is stamped flexible plastic lid 251 on the opening.Further, be embedded with the curved ring 26 of the type that returns by the HPB300 reinforcement fabrication on four sides of described epimere prefabricated post 2, the curved ring of this time type 26 parts expose.The curved ring 26 of this time type is positioned at epimere prefabricated post 2 in the high position of 1/3rd posts.
Described first flange 14 and second flange 24 dock by bolt.Be banded with stirrup 3 on described first vertical reinforcement 11 and second vertical reinforcement 21, and concreting is to form an integral body.
Further, the end that described first steel pipe 13 is nuzzled in the hypomere prefabricated post 1 in advance is what seal, and described second steel pipe 23 is nuzzled ends in the epimere prefabricated post 2 in advance also for sealing.And the link of described first steel pipe 13 and first flange 14 is opening, and the link of described second steel pipe 23 and second flange 24 also is opening.Be respectively equipped with some oval-shaped holes 4 on described first steel pipe 13 and second steel pipe 23, hole 4 minimum widiths are not less than 50mm.
The cross section of described first flange 14 is rectangular, and four limits of rectangle are parallel with four limits in described hypomere prefabricated post 1 cross section.Same, the cross section of described second flange 24 is also rectangular, and four limits of rectangle are parallel with four limits in described epimere prefabricated post cross section 2.
Described first connector 12 and second connector 22 are channel-section steel, have the bolt hole 5 of equidistant layout on the channel-section steel.Wherein, described first connector 12 is arranged on the inboard of first vertical reinforcement 11 in 1 four bights of hypomere prefabricated post; Described second connector 22 is arranged on the inboard of second vertical reinforcement 21 in 2 four bights of epimere prefabricated post.
The above specific embodiment only is the preferred embodiment of this creation, not in order to limiting this creation, all in this creation spirit and principle within make any modification, be equal to replacement, improvement etc., all should be included within the protection domain of this creation.

Claims (8)

1. a novel prefabricated post is characterized in that: comprise at least one hypomere prefabricated post and the epimere prefabricated post that cooperates with the hypomere prefabricated post; Wherein, be provided with first vertical reinforcement in the described hypomere prefabricated post, this first vertical reinforcement extends the two ends up and down of hypomere prefabricated post; The lower end of this hypomere prefabricated post is provided with first connector, and the upper end is provided with first steel pipe and is welded on first flange of the first steel pipe end face; Be provided with second vertical reinforcement in the described epimere prefabricated post, this second vertical reinforcement extends the two ends up and down of epimere prefabricated post; The lower end of this epimere prefabricated post is provided with second connector, and the upper end is provided with second steel pipe and is welded on second flange of the second steel pipe end face; Two auxiliary steel pipes of top butt joint of described second embedded steel tube, this auxiliary steel pipe extends to central authorities from the side of epimere prefabricated post; Described first flange and second flange dock by bolt; Described first connector also is connected by bolt with second connector; Be banded with stirrup on described first vertical reinforcement and second vertical reinforcement.
2. novel prefabricated post as claimed in claim 1 is characterized in that: the end that described first steel pipe is nuzzled in the hypomere prefabricated post in advance is what seal, and described second steel pipe is nuzzled a end in the epimere prefabricated post in advance also for sealing; The link of described first steel pipe and first flange is opening, and the link of described second steel pipe and second flange also is opening.
3. novel prefabricated post as claimed in claim 1, it is characterized in that: be respectively equipped with some oval-shaped holes on described first steel pipe and second steel pipe, the hole minimum widith is not less than 50mm.
4. novel prefabricated post as claimed in claim 1, it is characterized in that: the cross section of described first flange is rectangular, and four limits of rectangle are parallel with four limits in described hypomere prefabricated post cross section; The cross section of described second flange is also rectangular, and four limits of rectangle are parallel with four limits in described epimere prefabricated post cross section.
5. novel prefabricated post as claimed in claim 1, it is characterized in that: described first connector and second connector are channel-section steel, have the bolt hole of equidistant layout on the channel-section steel; Described first connector is arranged on the inboard of first vertical reinforcement in four bights of hypomere prefabricated post; Described second connector is arranged on the inboard of second vertical reinforcement in four bights of epimere prefabricated post.
6. novel prefabricated post as claimed in claim 1, it is characterized in that: described auxiliary pipe diameter is 50 ~ 100mm, is stamped the flexible plastic lid on its opening.
7. novel prefabricated post as claimed in claim 1, it is characterized in that: the length of described hypomere prefabricated post is 1000 ~ 1500mm.
8. novel prefabricated post as claimed in claim 1 is characterized in that: be embedded with the curved ring of the type that returns by the HPB300 reinforcement fabrication on four sides of described epimere prefabricated post, this time type curved loop portion branch exposes.
CN 201320154539 2013-04-01 2013-04-01 Novel precast column Expired - Lifetime CN203160540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320154539 CN203160540U (en) 2013-04-01 2013-04-01 Novel precast column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320154539 CN203160540U (en) 2013-04-01 2013-04-01 Novel precast column

Publications (1)

Publication Number Publication Date
CN203160540U true CN203160540U (en) 2013-08-28

Family

ID=49021735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320154539 Expired - Lifetime CN203160540U (en) 2013-04-01 2013-04-01 Novel precast column

Country Status (1)

Country Link
CN (1) CN203160540U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088397A (en) * 2013-04-01 2014-10-08 华汇工程设计集团股份有限公司 Prefabricated column and precast construction method thereof
CN109537812A (en) * 2018-11-22 2019-03-29 中国建筑第八工程局有限公司 Structural column indulges the connection method of muscle
CN110145070A (en) * 2019-05-13 2019-08-20 悉地国际设计顾问(深圳)有限公司 A kind of prefabricated column assembly and its construction method
CN111119410A (en) * 2020-01-19 2020-05-08 中国矿业大学 Column splicing structure and method suitable for reinforced concrete assembled structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088397A (en) * 2013-04-01 2014-10-08 华汇工程设计集团股份有限公司 Prefabricated column and precast construction method thereof
CN104088397B (en) * 2013-04-01 2016-05-11 华汇工程设计集团股份有限公司 A kind of prefabricated post and precast construction method thereof
CN109537812A (en) * 2018-11-22 2019-03-29 中国建筑第八工程局有限公司 Structural column indulges the connection method of muscle
CN110145070A (en) * 2019-05-13 2019-08-20 悉地国际设计顾问(深圳)有限公司 A kind of prefabricated column assembly and its construction method
CN111119410A (en) * 2020-01-19 2020-05-08 中国矿业大学 Column splicing structure and method suitable for reinforced concrete assembled structure

Similar Documents

Publication Publication Date Title
CN104088397B (en) A kind of prefabricated post and precast construction method thereof
CN105804283B (en) Full assembly concrete-filled steel tube frame combined shear wall construction
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
KR20170075753A (en) Prefabricated pier column member with steel-concrete composite structure
CN105544801A (en) Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN202466845U (en) Middle-layer node connecting structure for steel tube concrete column and steel reinforced concrete beam
CN108412128A (en) A kind of connection structure of steel core concrete column
CN203160540U (en) Novel precast column
CN208844417U (en) A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column
CN206016260U (en) A kind of bracing frame of the plate that floats for xoncrete structure roofing
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN204715623U (en) Prefabricated Steel Reinforced Concrete Beams and post
CN203769116U (en) Prefabricated through hole assembly type reinforced concrete shear wall
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN109441016B (en) Assembled concrete structure column steel tube sleeve joint and manufacturing method thereof
CN102808511B (en) Steel box column-concrete girder connection construction method
CN102691267A (en) High pier construction method for external whole operation platform
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN103161262B (en) A kind of construction method of steel pipe column and suspension column structure used
CN201671227U (en) SRC column with diagonally arranged cross steels with flanges
CN207905104U (en) A kind of assembled architecture truss structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130828