CN203156027U - Anti-clogging air supply system for steel ladle purging plug brick - Google Patents

Anti-clogging air supply system for steel ladle purging plug brick Download PDF

Info

Publication number
CN203156027U
CN203156027U CN 201320100673 CN201320100673U CN203156027U CN 203156027 U CN203156027 U CN 203156027U CN 201320100673 CN201320100673 CN 201320100673 CN 201320100673 U CN201320100673 U CN 201320100673U CN 203156027 U CN203156027 U CN 203156027U
Authority
CN
China
Prior art keywords
air
supply system
purging plug
plug brick
steel ladle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320100673
Other languages
Chinese (zh)
Inventor
吕仁祥
刘在春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG LUDONG REFRACTORY CO Ltd
Original Assignee
SHANDONG LUDONG REFRACTORY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG LUDONG REFRACTORY CO Ltd filed Critical SHANDONG LUDONG REFRACTORY CO Ltd
Priority to CN 201320100673 priority Critical patent/CN203156027U/en
Application granted granted Critical
Publication of CN203156027U publication Critical patent/CN203156027U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

An anti-clogging air supply system for a steel ladle purging plug brick relates to a steel ladle bottom blowing air supply system, and solves the problem that during smelting of molten steel, the molten steel or steel slag flows backwards into a purging plug brick to shorten the service life of the purging plug brick after the bottom blowing stops. The anti-clogging air supply system for the steel ladle purging plug brick comprises the purging plug brick mounted at the bottom of the steel ladle, wherein a flexible tube is connected with the purging plug brick; a first three-way tube and a second three-way tube are sequentially mounted on the flexible tube respectively; a quick connector is connected with one end of the first three-way tube, the air inlet of a one-way air inlet valve is connected with the other end of the first three-way tube; the air outlet of the one-way air inlet valve is connected with an air pocket via a third three-way tube; the other end of the third three-way tube is connected with the high pressure end of a proportioned air reducing valve; and the other end port of the second three-way tube is connected with the lower pressure end of the proportioned air reducing valve. According to the utility model, air is always exhausted from a narrow gap in the purging plug brick, and molten steel can not infiltrate into the narrow gap, so that the working layer of the purging plug brick is protected and the service life of the purging plug brick is prolonged.

Description

A kind of air brick of steel ladle anti-clogging air supply system
Technical field
The utility model relates to a kind of ladle bottom blowing air supply system, specifically a kind of air brick of steel ladle anti-clogging air supply system.
Background technology
Furnace outer refining technology is the important technology technological measure that improves the molten steel cleanliness factor, air brick in the ladle bottom blowing system is important function original paper during furnace outer refining technology is used, the external refining effect is played an important role, since ladle bottom blowing in whole molten steel smelting process to even molten steel composition, temperature and deoxidation, desulfurization, metallurgical effect such as remove to be mingled with and play an important role, directly influence is to the quality lifting of variety steel, the control of rhythm of production.But in casting steel with ladle; because bottom blowing stops; thereby molten steel or slag can stop up air flue along the infiltration downwards of air brick air feed slit in the ladle; each hot repair need be with burning the oxygen cleaning; it is not only boiled to the air flue high temperature melting of having stopped up to burn the oxygen cleaning process; also the high-melting-point protective layer fusing of air brick working lining and the formation of slag oxide is burnt, cause air brick working face deterioration 1-5mm even more.Thereby so accelerated the air brick erosive velocity repeatedly, reduced air brick service life.
The utility model content
The purpose of this utility model is to provide a kind of air brick of steel ladle anti-clogging air supply system, and molten steel or slag flowed backward to and reduce the air brick problem in service life in the air brick after bottom blowing stopped during the solution molten steel was smelted.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of air brick of steel ladle anti-clogging air supply system, comprise the air brick that is installed in ladle bottom, be connected with flexible pipe on the air brick, it is characterized in that, first three-way pipe and second three-way pipe also are installed respectively on flexible pipe in proper order, one end of described first three-way pipe connects snap joint, the other end is connected with the air inlet of breather cheek valve, the gas outlet of breather cheek valve connects a gas bag by the 3rd three-way pipe, the another port of the 3rd three-way pipe links to each other with the high-pressure side of proportion expression gas pressure reducer, and the another port of second three-way pipe links to each other with the low-pressure end of proportion expression gas pressure reducer.
Described gas bag outer wall is heat-insulation layer and refractory material is integrated poured forms.
Described heat-insulation layer is that 10mm is thick.
Described refractory material 20-50mm is thick.
The decompression ratio of described proportion expression gas pressure reducer can be any one among 2:1,3:1,3:2,5:4 or the 4:3.
The beneficial effects of the utility model are: after ladle refining is finished the external air source cut-out, gas bag will be ladle bottom air brick air feed automatically, the proportion expression gas pressure reducer is according to air brick working face slit place pressure change situation in watering the whole process of steel, automatically make the air brick of steel ladle slit that the gas discharging is arranged all the time, can not make molten steel infiltrate slit, thereby protect the air brick working lining, improve air brick service life; Gas bag adopts heat-insulation layer and refractory material casting material double shielding can prevent that gas bag is subjected to high temperature and molten steel splash to cause explosion danger to take place.
Description of drawings
Fig. 1 is structural representation of the present utility model,
Fig. 2 is the use state diagram of Fig. 1.
Among the figure: 1 ladle, 2 air bricks, 3 flexible pipes, 4 first three-way pipes, 5 second three-way pipes, 6 snap joints, 7 breather cheek valves, 8 the 3rd three-way pipes, 9 gas bags, 10 proportion expression gas pressure reducers.
The specific embodiment
As shown in Figure 1, a kind of air brick of steel ladle anti-clogging air supply system, comprise the air brick 2 that is installed in ladle 1 bottom, be connected with flexible pipe 3 on the air brick 2, first three-way pipe 4 and second three-way pipe 5 also are installed respectively on flexible pipe 3 in proper order, one end of described first three-way pipe 4 connects snap joint 6, the other end is connected with the air inlet of breather cheek valve 7, the gas outlet of breather cheek valve 7 connects a gas bag 9 by the 3rd three-way pipe 8, the another port of the 3rd three-way pipe 8 links to each other with the high-pressure side of proportion expression gas pressure reducer 10, and the another port of second three-way pipe 5 links to each other with the low-pressure end of proportion expression gas pressure reducer 10.
Described gas bag 9 outer walls are heat-insulation layer and refractory material is integrated poured forms.
Described heat-insulation layer is that 10mm is thick.
Described refractory material 20-50mm is thick.
The decompression ratio of described proportion expression gas pressure reducer 10 can be any one among 2:1,3:1,3:2,5:4 or the 4:3.
As shown in Figure 2; be the inside that the gas bag 9 of 7~15L places the ladle leg with volume; and away from bag end air brick 2 and the mouth of a river; with gas bag 9 and the fixation of ladle leg; gas bag 9 is pressed close to shell and is adopted 10mm heat-insulation layer and the double shielding of the integrated poured layer of 20~30mm refractory material, can prevent that gas bag 9 is subjected to high temperature and molten steel splash to cause explosion danger to take place.Having formed closed gas circuit after snap joint 6 and gas source pipe joint are connected, is gas bag 9 air feed by gas source pipe by breather cheek valve 7, is air brick 2 air feed by second three-way pipe 5 also simultaneously; Snap joint will be closed automatically after snap joint 6 disconnects, and gas can not leak in the pipeline, and this moment, gas bag 9 passing ratio formula gas pressure reducers 10 were air brick 2 air feed.Ladle 1 constantly descends owing to the molten steel face in steel pouring process, the pressure that acts on air brick 2 slit mouth places constantly reduces, the also adjusting of passing ratio formula gas pressure reducer 10 of gas pressure in the gas bag 9, gas is constantly slowly discharged by air brick 2 slits, whole like this steel pouring process air brick 2 slits always have the gas discharging, can prevent that molten steel from infiltrating slit and can not stop up slit, improve the service life of air brick 2.

Claims (5)

1. air brick of steel ladle anti-clogging air supply system, comprise the air brick that is installed in ladle bottom, be connected with flexible pipe on the air brick, it is characterized in that, first three-way pipe and second three-way pipe also are installed respectively on flexible pipe in proper order, one end of described first three-way pipe connects snap joint, the other end is connected with the air inlet of breather cheek valve, the gas outlet of breather cheek valve connects a gas bag by the 3rd three-way pipe, the another port of the 3rd three-way pipe links to each other with the high-pressure side of proportion expression gas pressure reducer, and the another port of second three-way pipe links to each other with the low-pressure end of proportion expression gas pressure reducer.
2. a kind of air brick of steel ladle anti-clogging air supply system according to claim 1 is characterized in that, described gas bag outer wall is heat-insulation layer and refractory material is integrated poured forms.
3. a kind of air brick of steel ladle anti-clogging air supply system according to claim 2 is characterized in that described heat-insulation layer is that 10mm is thick.
4. a kind of air brick of steel ladle anti-clogging air supply system according to claim 2 is characterized in that described refractory material 20-50mm is thick.
5. a kind of air brick of steel ladle anti-clogging air supply system according to claim 1 is characterized in that, the decompression ratio of described proportion expression gas pressure reducer can be any one among 2:1,3:1,3:2,5:4 or the 4:3.
CN 201320100673 2013-03-06 2013-03-06 Anti-clogging air supply system for steel ladle purging plug brick Expired - Lifetime CN203156027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320100673 CN203156027U (en) 2013-03-06 2013-03-06 Anti-clogging air supply system for steel ladle purging plug brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320100673 CN203156027U (en) 2013-03-06 2013-03-06 Anti-clogging air supply system for steel ladle purging plug brick

Publications (1)

Publication Number Publication Date
CN203156027U true CN203156027U (en) 2013-08-28

Family

ID=49017251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320100673 Expired - Lifetime CN203156027U (en) 2013-03-06 2013-03-06 Anti-clogging air supply system for steel ladle purging plug brick

Country Status (1)

Country Link
CN (1) CN203156027U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103100705A (en) * 2013-03-06 2013-05-15 济南鲁东耐火材料有限公司 Anti-clogging air supply system of permeable brick for ladle
CN103600057A (en) * 2013-12-09 2014-02-26 中天钢铁集团有限公司 Anti-blocking method for steel ladle air brick
CN109914183A (en) * 2019-04-19 2019-06-21 江苏建筑职业技术学院 Ground laying structure and processing method
CN111774560A (en) * 2020-07-25 2020-10-16 莱芜钢铁集团银山型钢有限公司 LF refining ladle microporous ceramic rod breathable upper nozzle pocket brick and argon blowing control method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103100705A (en) * 2013-03-06 2013-05-15 济南鲁东耐火材料有限公司 Anti-clogging air supply system of permeable brick for ladle
CN103600057A (en) * 2013-12-09 2014-02-26 中天钢铁集团有限公司 Anti-blocking method for steel ladle air brick
CN109914183A (en) * 2019-04-19 2019-06-21 江苏建筑职业技术学院 Ground laying structure and processing method
CN109914183B (en) * 2019-04-19 2023-09-05 江苏建筑职业技术学院 Ground laying structure and processing method
CN111774560A (en) * 2020-07-25 2020-10-16 莱芜钢铁集团银山型钢有限公司 LF refining ladle microporous ceramic rod breathable upper nozzle pocket brick and argon blowing control method thereof
CN111774560B (en) * 2020-07-25 2022-03-11 莱芜钢铁集团银山型钢有限公司 LF refining ladle microporous ceramic rod breathable upper nozzle pocket brick and argon blowing control method thereof
JP2023515903A (en) * 2020-07-25 2023-04-14 莱蕪鋼鉄集団銀山型鋼有限公司 Breathable Nozzle Receiving Brick with Microporous Ceramic Rod for LF Refining Ladle, and Argon Gas Blowing Control Method Therefor
JP7299430B2 (en) 2020-07-25 2023-06-27 莱蕪鋼鉄集団銀山型鋼有限公司 Breathable Nozzle Receiving Brick with Microporous Ceramic Rod for LF Refining Ladle, and Argon Gas Blowing Control Method Therefor

Similar Documents

Publication Publication Date Title
CN103100705A (en) Anti-clogging air supply system of permeable brick for ladle
CN203156027U (en) Anti-clogging air supply system for steel ladle purging plug brick
CN204373386U (en) A kind of can the induction furnace combined type crucible of slag adhesion
WO2023241241A1 (en) Converter sliding taphole and whole-process steel-tapping slag-blocking method
CN101993969B (en) Converter bottom blowing air brick and using method thereof
CN103894595A (en) Ladle for heat-resisting steel
CN203559063U (en) Blast furnace thin-wall lining
CN204224267U (en) A kind of Pure Silicon Metal external refining oxygen blowing device
CN204490904U (en) Blast furnace banking structure
CN207987278U (en) A kind of converter tapping vortex inhibitor
CN203021584U (en) Cast-iron cooling wall with nano anti-carburizing water pipe
CN208408528U (en) A kind of continuous casting production with long service life
CN203474836U (en) RH refining furnace dip pipe for preventing nitrogen from being added into molten steel
CN204661753U (en) Without scaling loss oxygen lance shower nozzle
CN206997760U (en) A kind of ladle with vacuum layer
CN203011125U (en) Waste heat recovery device for cupola furnace
CN205528881U (en) Ferroalloy is smelted and is melted branch stove device
CN204329576U (en) Titanium slag furnace combination stove mouth structure
CN204438810U (en) Bottom blowing copper smelter feed inlet device
CN211645297U (en) Blast furnace slag hole protection structure for vanadium titano-magnetite smelting
CN204569965U (en) A kind of refining furnace
CN203018732U (en) Pipeline for transporting zinc alloy fluid
CN204171348U (en) Heat resisting steel casting ladle
CN202793008U (en) Slag and iron discharging structure of titanium slag electric-arc furnace
CN206200115U (en) A kind of continuous casting production impact zone apparatus for baking

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130828

CX01 Expiry of patent term