CN203155012U - Boiler waste gas purifier - Google Patents

Boiler waste gas purifier Download PDF

Info

Publication number
CN203155012U
CN203155012U CN 201320104563 CN201320104563U CN203155012U CN 203155012 U CN203155012 U CN 203155012U CN 201320104563 CN201320104563 CN 201320104563 CN 201320104563 U CN201320104563 U CN 201320104563U CN 203155012 U CN203155012 U CN 203155012U
Authority
CN
China
Prior art keywords
waste gas
water curtain
water
curtain groove
purification device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320104563
Other languages
Chinese (zh)
Inventor
李江奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320104563 priority Critical patent/CN203155012U/en
Application granted granted Critical
Publication of CN203155012U publication Critical patent/CN203155012U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The utility model relates to a waste gas treatment device and in particular discloses a novel boiler waste gas purifier. The boiler waste gas purifier comprises a working room, wherein a waste gas circulating room is arranged in the working room; a spray tube is arranged at the port end, in the working room, of the waste gas circulating room; and the spray tube is connected with a water pump by a metal water tube. The spray tube is used for applying high pressure by virtue of the water pump to form a water curtain at the port end, in the working room, of the waste gas circulating room, so that liquid water is adhered on impurities and solid particles in the waste gas penetrating through the water curtain, and therefore, a purpose of purifying the impurities and the solid particles in the waste gas is achieved. According to the technical scheme of the utility model, the boiler waste gas purifier is connected with a boiler and a waste gas outlet of a chimney, so that the impurities and particles in the exhausted waste gas are reduced, and therefore, the pollution to the environment is reduced.

Description

The boiler waste gas purification device
Technical field
The utility model relates to a kind of emission-control equipment, relates in particular to a kind of novel boiler waste gas purification device.
Background technology
During boiler work, by the chimney combustion gas, wherein contain a large amount of dust and other pernicious gas, particularly when burning was inadequate, the billowing black smoke of discharge was the inadequate coke solids particle of burning.These contain a large amount of dust, if the gas of particle directly is discharged in the environment, can cause great harm to environment, more can cause human various respiratory disorder.Existing, people have adopted various off-gas cleaning equipments, and the complex structure of existing air cleaning facility, and the cost height is not suitable for the boiler plant of some medium and small enterprises, is not easy to penetration and promotion.
Summary of the invention
The utility model provides a kind of novel boiler waste gas purification device at deficiency of the prior art.
In order to solve the problems of the technologies described above, the utility model is solved by following technical proposals:
The boiler waste gas purification device comprises the operating room, is provided with the waste gas circulation chamber in the operating room, and the port end that the waste gas circulation chamber is positioned at the operating room is provided with jet pipe, and jet pipe is connected with water pump by metallic water pipe.Jet pipe is granted high pressure by water pump, and the port end that is positioned at the operating room at the waste gas circulation chamber forms water curtain, and aqueous water is attached to by on impurities in waste gas and the solid granulates herein, reaches the purpose of impurity and solid particle in the purifying exhaust air.
As preferably, the port that the jet pipe spiral is arranged on the waste gas circulation chamber forms the water curtain groove, and jet pipe is provided with delivery port.By the ring-shaped water curtain groove water is erupted out by delivery port, spray out water smoke and be attached in impurities in waste gas and the solid granulates, make impurity and solid granulates become and heavily sink in the water, do not escape and be not with on impurity and the solid granulates air.
As preferably, jet pipe comprises the first water curtain groove, the second water curtain groove and the 3rd water curtain groove, and the first water curtain groove, the second water curtain groove and the 3rd water curtain groove arrange from the bottom to top.Three-dimensional water curtain groove arranges, and spray area is increased, and the air area that is cleaned increases.
As preferably, the delivery port of the first water curtain groove is arranged on the jet pipe below, and the delivery port of the second water curtain groove and the 3rd water curtain groove is arranged on horizontal direction.The water curtain of the delivery port ejection of first water curtain groove below straight down, the water curtain divergence of the delivery port ejection of the second water curtain groove and the 3rd water curtain groove level is come, a plurality of water curtain grooves form the network of a solid, in the time of each water curtain groove of waste gas process, the capital is cleaned once, has increased the degree that purifies.Can also the water curtain groove of different numbers be set according to different actual demands herein.
As preferably, the top of operating room is connected with the gas outlet.Waste gas after the purification is discharged by the gas outlet.
As preferably, the gas outlet is provided with fan blade.Rotation by fan blade increases negative pressure emission gas, avoids operating room's internal pressure excessive, and water causes other infringements because the pressure effect is expressed to waste gas inlet then.
As preferably, the below of operating room is connected with transparent hose, and transparent hose connects and filters cloth bag, and the filter cloth bag is seated in the tank.By transparent flexible pipe, can observe the inner impurity particle content that is detained constantly, be convenient to dredge flexible pipe, avoid blocking.
As preferably, tank is provided with running water pipe, and running water pipe is provided with autocontrol valve.The water of tank inside taps into by running water pipe, increases the water source supply of whole water circulation.
As preferably, autocontrol valve connects buoy.The high and low position control of autocontrol valve by buoy, buoy swims on the water surface, is monitoring the height of tank middle water level constantly, when water level is lower than a certain position, opening controlling valve door water filling in the tank automatically.Increase the automaticity of entire equipment.
As preferably, the bottom of tank is provided with scupper valve.The discharge outlet of bottom for the residual water of getting rid of tank, is convenient to the maintenance of equipment, maintenance.
According to the boiler waste gas purification device of the technical solution of the utility model, link to each other with the waste gas row mouth of boiler, chimney, reduce impurity and particle in the discharging waste gas, reduce the pollution to environment.
Description of drawings
Fig. 1 is the structural representation of boiler waste gas purification device of the present utility model.
Fig. 2 is the distribution schematic diagram of water curtain of the present utility model.
Fig. 3 is the schematic diagram of first water curtain of the present utility model.
Fig. 4 is the schematic diagram of second water curtain of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing 1-4 and the specific embodiment the utility model is described in further detail:
The boiler waste gas purification device comprises operating room 1, is provided with waste gas circulation chamber 12 in the operating room 1, and the port end that waste gas circulation chamber 12 is positioned at operating room 1 is provided with jet pipe 10, and jet pipe 10 is connected with water pump 3 by metallic water pipe 2.Jet pipe 10 is the spiral stereo structure, and jet pipe 10 comprises the ring-type water curtain groove that is provided with delivery port.Jet pipe 10 comprises that the first water curtain groove 101, the second water curtain groove 102 and the 3rd water curtain groove 103, the first water curtain grooves 101, the second water curtain groove 102 and the 3rd water curtain groove 103 arrange from the bottom to top.The delivery port of the first water curtain groove 101 is arranged on the jet pipe below, the delivery port of the second water curtain groove 102 and the 3rd water curtain groove 103 is arranged on horizontal direction, first water curtain 1010 of the delivery port ejection of the first water curtain groove, 101 belows straight down, second water curtain 1020,1030 divergence of the 3rd water curtain of the delivery port ejection of the second water curtain groove 102 and the 3rd water curtain groove 103 levels are come, a plurality of water curtains form the network of a solid, in the time of each water curtain of waste gas process, the capital is cleaned once, has increased the degree that purifies.Can also the water curtain groove of different numbers be set according to different actual demands herein.Jet pipe 10 is granted high pressure by water pump 3, and the port end that is positioned at operating room 1 at waste gas circulation chamber 12 forms water curtain, and aqueous water is attached to by on impurities in waste gas and the solid granulates herein, reaches the purpose of impurity and solid particle in the purifying exhaust air.
Waste gas circulation chamber 12 is positioned at operating room's 1 outer port end and connects exhaust gas inlet pipe 11.The below of operating room 1 is connected with transparent hose 9, and transparent hose 9 connects filtration cloth bag 8, and filter cloth bag 8 is seated in the tank 5.Tank 5 provides the water source for water pump 3, and tank 5 is provided with running water pipe 7, and toward tank 5 interior water fillings, running water pipe 7 is provided with autocontrol valve, and autocontrol valve is by the high and low position control of buoy 6.The bottom of tank 5 is provided with scupper valve 4.The top of operating room 1 is connected with gas outlet 13, and gas outlet 13 is provided with fan blade 14, by the rotation increase negative pressure emission gas of fan blade 14.
Through the waste gas after purifying, by gas outlet 13 dischargings.The waste water that operating room 1 contains impurity particle is discharged in the cloth bag by transparent hose 9, because transparent hose 9 support bending states, in the time of waste water process lowest part; impurity particle is stuck in lower; owing to be transparent hose, when impurity particle runs up to a certain amount of the time, dredge transparent hose 9 again.The small impurities particle that also contains fraction inside the waste water by transparent hose 9, this moment, water was after filtering returned in the tank, continues recycling by filtering cloth bag 8 with Impurity removal.
In a word, the above only is preferred embodiment of the present utility model, and all equalizations of doing according to the utility model claim change and modify, and all should belong to the covering scope of the utility model patent.

Claims (10)

1. boiler waste gas purification device, it is characterized in that: comprise operating room (1), be provided with waste gas circulation chamber (12) in the operating room (1), the port end that waste gas circulation chamber (12) is positioned at operating room (1) is provided with jet pipe (10), and jet pipe (10) is connected with water pump (3) by metallic water pipe (2).
2. boiler waste gas purification device according to claim 1 is characterized in that: the port that jet pipe (10) spiral is arranged on waste gas circulation chamber (12) forms the water curtain groove, and jet pipe (10) is provided with delivery port.
3. boiler waste gas purification device according to claim 2, it is characterized in that: jet pipe (10) comprises the first water curtain groove (101), the second water curtain groove (102) and the 3rd water curtain groove (103), and the first water curtain groove (101), the second water curtain groove (102) and the 3rd water curtain groove (103) arrange from the bottom to top.
4. boiler waste gas purification device according to claim 3 is characterized in that: the delivery port of the first water curtain groove (101) is arranged on the jet pipe below, and the delivery port of the second water curtain groove (102) and the 3rd water curtain groove (103) is arranged on horizontal direction.
5. boiler waste gas purification device according to claim 1, it is characterized in that: the top of operating room (1) is connected with gas outlet (13).
6. boiler waste gas purification device according to claim 4, it is characterized in that: gas outlet (13) are provided with fan blade (14).
7. boiler waste gas purification device according to claim 1, it is characterized in that: the below of operating room (1) is connected with transparent hose (9), and transparent hose (9) connects and filters cloth bag (8), and filter cloth bag (8) is seated in the tank (5).
8. boiler waste gas purification device according to claim 7, it is characterized in that: tank (5) is provided with running water pipe (7), and running water pipe (7) is provided with autocontrol valve.
9. boiler waste gas purification device according to claim 8, it is characterized in that: autocontrol valve connects buoy (6).
10. according to claim 7 or 8 or 9 described boiler waste gas purification devices, it is characterized in that: the bottom of tank (5) is provided with scupper valve (4).
CN 201320104563 2013-03-06 2013-03-06 Boiler waste gas purifier Expired - Fee Related CN203155012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320104563 CN203155012U (en) 2013-03-06 2013-03-06 Boiler waste gas purifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320104563 CN203155012U (en) 2013-03-06 2013-03-06 Boiler waste gas purifier

Publications (1)

Publication Number Publication Date
CN203155012U true CN203155012U (en) 2013-08-28

Family

ID=49016236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320104563 Expired - Fee Related CN203155012U (en) 2013-03-06 2013-03-06 Boiler waste gas purifier

Country Status (1)

Country Link
CN (1) CN203155012U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104958975A (en) * 2015-06-03 2015-10-07 成都恒力达科技有限公司 Industrial exhaust gas purifier
CN105833633A (en) * 2016-05-06 2016-08-10 苏州格兰斯柯光电科技有限公司 Multifunctional air purifier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104958975A (en) * 2015-06-03 2015-10-07 成都恒力达科技有限公司 Industrial exhaust gas purifier
CN105833633A (en) * 2016-05-06 2016-08-10 苏州格兰斯柯光电科技有限公司 Multifunctional air purifier

Similar Documents

Publication Publication Date Title
CN203971651U (en) A kind of rinsing type exhaust gas treating tower
CN205517076U (en) Flue gas dust removal circulating device of mill
CN206295754U (en) A kind of activated carbon catalytic converter
CN108854380A (en) A kind of high-efficiency environment friendly smoke dust-removing equipment
CN108854379A (en) A kind of high-efficiency environment friendly flue gas spray filter
CN105650754A (en) Anti-blockage air purification device
CN203155012U (en) Boiler waste gas purifier
CN204601893U (en) Welding dust arrester
CN201602080U (en) Environment-friendly barbecue oven
CN202962190U (en) Welding dedusting and purifying device
CN204816116U (en) Application exhaust -gas treatment equipment
CN207641213U (en) Fume purifier of fume
CN203790785U (en) Combined type dust remover
CN111228964A (en) Dust removal purification system for single equipment
CN205109272U (en) Water mist dust removing apparatus
CN109289474A (en) A kind of absorption denitrogenation flue gas purification device with anti-dust effect
CN205619462U (en) Photocatalysis formula indoor air purifying device
CN204768079U (en) Boiler smoke purifier
CN209348398U (en) A kind of absorption denitrogenation flue gas purification device with anti-dust effect
CN209060759U (en) A kind of air purifying dust remover
CN209752544U (en) Boiler tail gas treatment equipment
CN209612429U (en) A kind of automatic cleaning-type air purifier
CN207056215U (en) A kind of industrial furnace filtrating smoke dust retracting device
CN106268111A (en) Multifunctional air purifier
CN205627558U (en) Plasma photocatalyst exhaust gas purification device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20150306

EXPY Termination of patent right or utility model