CN203130098U - Measuring system for grouting reinforcement process - Google Patents

Measuring system for grouting reinforcement process Download PDF

Info

Publication number
CN203130098U
CN203130098U CN 201320064287 CN201320064287U CN203130098U CN 203130098 U CN203130098 U CN 203130098U CN 201320064287 CN201320064287 CN 201320064287 CN 201320064287 U CN201320064287 U CN 201320064287U CN 203130098 U CN203130098 U CN 203130098U
Authority
CN
China
Prior art keywords
grouting
electromagnetic flowmeter
air compressor
pump
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320064287
Other languages
Chinese (zh)
Inventor
陈玄
王明智
姚开元
白凤忠
宋培章
赵国超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI COAL CHEMICAL INDUSTRY CONSTRUCTION (GROUP) Co Ltd
Original Assignee
SHAANXI COAL CHEMICAL INDUSTRY CONSTRUCTION (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI COAL CHEMICAL INDUSTRY CONSTRUCTION (GROUP) Co Ltd filed Critical SHAANXI COAL CHEMICAL INDUSTRY CONSTRUCTION (GROUP) Co Ltd
Priority to CN 201320064287 priority Critical patent/CN203130098U/en
Application granted granted Critical
Publication of CN203130098U publication Critical patent/CN203130098U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model provides a measuring system for a grouting reinforcement process. The system comprises a grouting pump, an anti-knock pressure gage and an electromagnetic flowmeter. According to the grouting pump, an air compressor is adopted to serve as a grouting power source. A grouting pipe of the grouting pump is connected with the anti-knock pressure gage and the electromagnetic flowmeter through tee joints. The anti-knock pressure gage, the electromagnetic flowmeter and an inlet valve of the air compressor form a detection control loop. Therefore, a grouting process is monitored in real time, grouting efficiency and stability are improved, and grouting reinforcement quality is guaranteed.

Description

A kind of measurement system for grouting and reinforcing technology
Technical field
The utility model relates to a kind of measurement system that disposes in grouting and reinforcing technology.
Background technology
In recent years, ground body slurry injection technique has obtained using widely.Carry out the grouting and reinforcing engineering at different geological conditionss, place, design scheme should satisfy the slip casting situation under the different grouting process, grouting parameter, slurries parameter condition of the sand body of on-the-spot geological conditions.
In the engineering, generally be to adopt large-scale air compressor machine as the slip casting power source, pressure is more stable, and pressure at expulsion is general constant in 0.8MPa.The hydraulic coupling that goes out of grouting pump generally big luffing occurs with the variation on stratum; Indoor grouting simulation test often adopts Manual pressure test pump as the slip casting power source, and grouting pipeline adopts withstand voltage rubber hose, and its rear end is connected with the hydraulic test pump Grouting Pipe.
The utility model content
The utility model provides a kind of measurement system for grouting and reinforcing technology, with real-time monitoring slip casting process, improves slip casting efficient and stability.
Scheme of the present utility model is as follows:
A kind of measurement system for grouting and reinforcing technology comprises grouting pump, anti-shock pressure meter and electromagnetic flowmeter; Grouting pump adopts air compressor machine as the slip casting power source, connects described anti-shock pressure meter and electromagnetic flowmeter by threeway on the Grouting Pipe of grouting pump, and the air intake valve of anti-shock pressure meter and electromagnetic flowmeter and air compressor machine constitutes the detection control loop.
The preferred HT-LDE type of above-mentioned electromagnetic flowmeter electromagnetic flowmeter.
The utlity model has following advantage:
The process of monitoring slip casting in real time improves slip casting efficient and stability, guarantees the grouting and reinforcing quality.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
As shown in Figure 1: measurement system of the present utility model comprises anti-shock pressure meter, range 2.5MPa; HT-LDE type electromagnetic flowmeter, latus rectum 25mm.
Under grouting amount and the changeless situation of grouting pressure, the layer of sand crack is the principal element that influences slip casting effect, and slurries easily extend along the crack trend, cause adding solid and irregular structure bodies such as sheet, bulk occur.Because the uncertainty on stratum, and too much fissure-plane exists, and can cause adverse effect to underground surrounding rock of chamber stability, therefore, under the monitoring of measurement system, should be noted that following some:
(1) stablizes grouting pressure.In the engineering, generally be to adopt large-scale air compressor machine as the slip casting power source, pressure is more stable, and pressure at expulsion is general constant in 0.8MPa.The hydraulic coupling that goes out of grouting pump generally big luffing occurs with the variation on stratum.Highly pressurised liquid acts on the pressure meter can real-time monitored grouting serous fluid pressure size, according to manometric variation and slip casting face condition, at any time regulate the grouting pump air intake valve, regulate to give and press size, guarantee that antidetonation meter pressure table is stabilized between the 0.2-0.6MPa, guarantees the penetrating power of slurries in layer of sand.
(2) suitably adjust grouting amount.The HT-LDE electromagnetic flowmeter detects the injection rate of slurries in the slip casting process in real time, can measure the slurries amount of injecting layer of sand very accurately, thereby regulate the grouting pump air intake valve and give the pressure size, flow rate of grouting is generally controlled at 5~15L/min in the slip casting process, and maximum should not surpass 20L/min.Got through or stratum itself just exists under the situation in crack when the crack, suitably increase grouting amount filling crack, the existence that can alleviate because of fissure-plane causes the not good phenomenon of grouting consolidation effect.
(3) suitably increase slip casting hole count, minimizing injected hole distance.Increase the overlapping scope that adjacent hole adds solid, guarantee to add the whole slip casting effect of solid.

Claims (2)

1. a measurement system that is used for grouting and reinforcing technology is characterized in that: comprise grouting pump, anti-shock pressure meter and electromagnetic flowmeter; Grouting pump adopts air compressor machine as the slip casting power source, connects described anti-shock pressure meter and electromagnetic flowmeter by threeway on the Grouting Pipe of grouting pump, and the air intake valve of anti-shock pressure meter and electromagnetic flowmeter and air compressor machine constitutes the detection control loop.
2. the measurement system for grouting and reinforcing technology according to claim 1 is characterized in that: described electromagnetic flowmeter employing HT-LDE type electromagnetic flowmeter.
CN 201320064287 2013-02-04 2013-02-04 Measuring system for grouting reinforcement process Expired - Fee Related CN203130098U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320064287 CN203130098U (en) 2013-02-04 2013-02-04 Measuring system for grouting reinforcement process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320064287 CN203130098U (en) 2013-02-04 2013-02-04 Measuring system for grouting reinforcement process

Publications (1)

Publication Number Publication Date
CN203130098U true CN203130098U (en) 2013-08-14

Family

ID=48938089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320064287 Expired - Fee Related CN203130098U (en) 2013-02-04 2013-02-04 Measuring system for grouting reinforcement process

Country Status (1)

Country Link
CN (1) CN203130098U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105043938A (en) * 2015-06-30 2015-11-11 山东大学 Reusable saturated sand layer permeation grouting test model and applications thereof
CN105257276A (en) * 2015-11-18 2016-01-20 中国华冶科工集团有限公司 Grouting monitoring system and monitoring method thereof
CN106381871A (en) * 2016-08-31 2017-02-08 西安长庆科技工程有限责任公司 Anchor cable secondary grouting control system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105043938A (en) * 2015-06-30 2015-11-11 山东大学 Reusable saturated sand layer permeation grouting test model and applications thereof
CN105043938B (en) * 2015-06-30 2017-09-01 山东大学 A kind of repeatable saturated sand osmotic grouting test model utilized and its application
CN105257276A (en) * 2015-11-18 2016-01-20 中国华冶科工集团有限公司 Grouting monitoring system and monitoring method thereof
CN106381871A (en) * 2016-08-31 2017-02-08 西安长庆科技工程有限责任公司 Anchor cable secondary grouting control system and method

Similar Documents

Publication Publication Date Title
CN201464456U (en) High-pressure crack grouting simulation test bed
CN104234740B (en) A kind of low middle pressure air displacement high pressure coal seam gas train and method thereof
CN105806712B (en) Hole internal water pressure test device and test macro
CN104314508A (en) Hole sealing method for coal bed gas drainage drill hole
CN203130098U (en) Measuring system for grouting reinforcement process
CN105927248A (en) Pressure stabilizing and gas exhausting device used for grouting site and mounting and using method thereof
CN203452801U (en) Sectional pulse grouting system for tunnel construction
CN103470212B (en) Active drilling and hole sealing device and method
CN207920580U (en) A kind of coal-bed gas pressure fixed test device
CN103257219B (en) Novel pouring device for model test and application method
CN204536297U (en) A kind of colliery water shutoff material performance test experimental apparatus
CN204476353U (en) A kind of mash gas pumping drilling plugging device
CN204140060U (en) Oil well, well sleeve pipe small displacement leak finding device
CN106381871A (en) Anchor cable secondary grouting control system and method
CN202844902U (en) On-line blending device for emulsion polymer
CN204941504U (en) A kind of erosion resistance high pressure combination manifold apparatus
CN206204974U (en) A kind of device for plugging for concrete pipe base core-drawing hole water burst
CN205370587U (en) Broken country rock deep hole slip casting reinforcing apparatus in colliery
CN103174428A (en) Method of implementing grouting and water plugging of shaft through chemical grout
CN108843371B (en) It is a kind of based on the coal seam subregion Dynamic Water Injection process for adopting release
CN205691428U (en) Hole internal water pressure test device and test system
CN104695920A (en) Oilfield foaming agent injection system
CN209400383U (en) A kind of compressed water generation apparatus measuring Rockmass Permeabuity Coefficient
CN201495538U (en) Grouting complete equipment for foundation treatment
CN108587583A (en) A kind of high proportion rectangular top pipe mud and preparation method thereof and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20160204

CF01 Termination of patent right due to non-payment of annual fee