CN203129132U - Pneumatic rapid pore-forming composite pile - Google Patents

Pneumatic rapid pore-forming composite pile Download PDF

Info

Publication number
CN203129132U
CN203129132U CN 201320113024 CN201320113024U CN203129132U CN 203129132 U CN203129132 U CN 203129132U CN 201320113024 CN201320113024 CN 201320113024 CN 201320113024 U CN201320113024 U CN 201320113024U CN 203129132 U CN203129132 U CN 203129132U
Authority
CN
China
Prior art keywords
pile
pile body
pneumatic
pore
forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320113024
Other languages
Chinese (zh)
Inventor
钱圣德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co Ltd
Original Assignee
WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co Ltd filed Critical WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co Ltd
Priority to CN 201320113024 priority Critical patent/CN203129132U/en
Application granted granted Critical
Publication of CN203129132U publication Critical patent/CN203129132U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A pneumatic rapid pore-forming composite pile is characterized in that a pneumatic impact rock drilling process is adopted for achieving rapid pore forming, and a cast-in-situ concrete lower pile body and a rigid-flexible upper pile body are constructed; the rigid upper pile body is a tube pipe, I-beam or precast pile; the flexible upper pile body is filled with sand, gravels or cement mortar, and wraps the rigid upper pile body; pile diameter of the composite pile is 500-1000mm; and thickness of the flexible upper pile body is 50-150mm. Compared with the prior art, the pneumatic rapid pore-forming composite pile has the advantages that for pile forming in a backfilling area of an ultra-thick layer containing boulders, speed is increased tenfold as compared with that of conventional impact drilling; cost is lower than that of using reinforced concrete for filling the pile body; and more importantly, cement in the pile body concrete is prevented from being taken away by runoff of the backfilling layer to further affect pipe body quality.

Description

A kind of pneumatic fast pore-creating compound pile
Technical field
The utility model relates to the building foundation engineering field, relates in particular to a kind of pneumatic fast pore-creating compound pile.
Background technology
Along with China's urban construction scale constantly enlarge and the red line that can not touch in " 1,800,000,000 mu of arable lands " under, seek the soil that can be used for building, become the almost thing worried about most of each city manager of China.Especially the mountain marine reclamation land is all had to explode in the coastal cities of China's an inch of land is an inch of gold.Small hill on the limit, bay cuts into a mountain and blows out, and explodes big and small piece stone and the earth that, and the various building wastes that inside the city ship, from the bank to beach progressively toward filling out in the sea, rice is thick surplus the backfill number of plies rice to tens, 20.Drive piles at such ground, there are the following problems in meeting, and the preformed pile of squeezing into, pile tube can stop because of the boulder of one, two rice diameters that accompany in the fill stratum, can't construct.As adopt bored pile, and can only use Churn drill, and be used for a jump bit to several tons of weights of pore-forming, when the boulder that runs into greater than diameter more than a meter, can cause inclined hole and card hammer.
The utility model content
The utility model provides a kind of pneumatic fast pore-creating compound pile, can be in the ground of the huge thick back fill course that contains big or huge boulder, energy fast pore-creating and pile, can also guarantee into hole perpendicularity control within the national regulation requirement, the soil layer water in the huge thick beach ooze layer that underlies, can constantly discharge along the back-up sand layer of last pile body, promote soil layer to solidify, improve the bearing capacity of stake.
The technical solution adopted in the utility model is: a kind of pneumatic fast pore-creating compound pile, it is characterized in that, and adopt Pneumatic immpacting rock drilling technology fast pore-creating, the following pile body of cast-in-situ concrete and the last pile body of hard and soft combination; The last pile body of rigidity is pile tube or i iron or preformed pile; Flexible last pile body is back-up sand or gravel or cement mortar, and pile body is wrapped in pile body on the rigidity on the flexibility, compound pile stake footpath 500-1000mm, the thick 50-150mm of pile body on the flexibility.When pile body on the flexibility was cement mortar, underground should not have river rising in Ningxia and flowing into central Shaanxi stream environment.
A kind of piling method of pneumatic fast pore-creating compound pile may further comprise the steps successively:
(1), crawler type or walking aeratic hidden hole hammer are stood on the stake position;
(2), start the upper and lower unit head that hangs on the supporting air compressor machine of rig and the rig column.Last unit head drives long screw drill rod, connecting the down-the-hole hammer under the long screw drill rod, compressed air acts on the down-the-hole hammer by the cavity at drilling rod center, makes tup high-frequency percussion rock, rock is broken into stone flour and rock ballast rapidly, takes ground out of by the helical blade that is on the long screw drill rod that is rotated counterclockwise; Following unit head drives the steel sleeve driving that turns clockwise, and steel sleeve lower end ring bit is inlaid with alloy bit, and down-the-hole hammer diameter is less than steel casing internal diameter 2cm, and stake is directly than the big 2cm of steel casing external diameter, with steel casing lower end ring bit equal diameter;
(3), cut a hole top backfill layer or boulder bed when the jump bit tup dashes, entered bearing stratum, reach projected depth after, carried in the steel casing by last unit head and to unload long screw drill rod and down-the-hole hammer;
(4), in the steel casing, pour into the conduct concrete of pile body down;
(5) with the pulley suspension hook on the rig column, sling pile tube or i iron or preformed pile insert in the steel casing concrete;
(6), between the pile tube or i iron or preformed pile in steel casing and tube, pour into sand or gravel or cement mortar, and irritate on the limit, vibrating hammer exciting steel casing is hung by crane in the limit, carries the steel casing while shaking to ground, namely finishes a pneumatic fast pore-creating compound pile;
(7), go round and begin again, finish all pneumatic fast pore-creating compound piles.
A kind of pneumatic fast pore-creating compound pile compared with prior art, has obvious superiority: pile in the backfill zone of the huge thick-layer that contains boulder, can more conventional Churn drill, the speed tenfold improves, pour into (because being end bearing pile, reinforcing cage is elongated) with pile body with steel concrete, cost is low, the main river rising in Ningxia and flowing into central Shaanxi of having avoided backfill layer fails to be convened for lack of a quorum and takes away cement in the pile concrete, and influences pile quality.
The utility model is described in further detail below in conjunction with accompanying drawing and the specific embodiment.
Description of drawings
Fig. 1 is a kind of exemplary embodiments generalized section of the utility model.
Drawing explanation: 1. backfill layer, 2. back-up sand or gravel, 3. pile tube, 4. boulder bed, 5. rock stratum, 6. pile body under the concrete.
The specific embodiment
As shown in Figure 1: a kind of piling method of pneumatic fast pore-creating compound pile may further comprise the steps successively:
(1), crawler type or walking aeratic hidden hole hammer are stood on the stake position;
(2), start the upper and lower unit head that hangs on the supporting air compressor machine of rig and the rig column.Last unit head drives long screw drill rod, connecting the down-the-hole hammer under the long screw drill rod, compressed air acts on the down-the-hole hammer by the cavity at drilling rod center, makes tup high-frequency percussion rock, rock is broken into stone flour and rock ballast rapidly, takes ground out of by the helical blade that is on the long screw drill rod that is rotated counterclockwise; Following unit head drives the steel sleeve driving that turns clockwise, and steel sleeve lower end ring bit is inlaid with alloy bit, and down-the-hole hammer diameter is less than steel casing internal diameter 2cm, and stake is directly than the big 2cm of steel casing external diameter, with steel casing lower end ring bit equal diameter;
(3), cut a hole backfill layer (1), boulder bed (4) when the jump bit tup dashes, and enter rock stratum (5), reach projected depth after, carried in the steel casing by last unit head and to unload long screw drill rod and down-the-hole hammer;
(4), in the steel casing, pour into the conduct concrete of pile body (6) down;
(5) with the pulley suspension hook on the rig column, the pile tube of slinging (3) inserts in following pile body (6) concrete of steel casing bottom;
(6), between the pile tube in steel casing and tube, pour into back-up sand (2), and limit filling, limit hang vibrating hammer exciting steel casing by crane, carries the steel casing while shaking to ground, namely finishes a pneumatic fast pore-creating compound pile; Go round and begin again, finish all pneumatic fast pore-creating compound piles.

Claims (1)

1. a pneumatic fast pore-creating compound pile is characterized in that, adopts Pneumatic immpacting rock drilling technology fast pore-creating, the following pile body of cast-in-situ concrete and the last pile body of hard and soft combination; The last pile body of rigidity is pile tube or i iron or preformed pile; Flexible last pile body is back-up sand or gravel or cement mortar, and pile body is wrapped in pile body on the rigidity on the flexibility, compound pile stake footpath 500-1000mm, the thick 50-150mm of pile body on the flexibility.
CN 201320113024 2013-03-01 2013-03-01 Pneumatic rapid pore-forming composite pile Expired - Fee Related CN203129132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320113024 CN203129132U (en) 2013-03-01 2013-03-01 Pneumatic rapid pore-forming composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320113024 CN203129132U (en) 2013-03-01 2013-03-01 Pneumatic rapid pore-forming composite pile

Publications (1)

Publication Number Publication Date
CN203129132U true CN203129132U (en) 2013-08-14

Family

ID=48937127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320113024 Expired - Fee Related CN203129132U (en) 2013-03-01 2013-03-01 Pneumatic rapid pore-forming composite pile

Country Status (1)

Country Link
CN (1) CN203129132U (en)

Similar Documents

Publication Publication Date Title
CN104018494A (en) Pneumatic quick-pore-forming composite pile and pile-forming method
CN105649012B (en) Upper-soft lower-hard ground subway station building enclosure drilled pile construction method
CN1995685A (en) Pile forming mechanism with high-pressure-jet gyro bit and pile forming method
CN108517877B (en) Supporting construction method combining consolidation grouting of hybrid filling ultra-deep foundation pit with double-row steel pipe piles
CN106930276B (en) The construction method of the deep hole blasting of rotary digging bored concrete pile and conduit rotary digging removing obstacles
CN103046931B (en) Method for forming holes of vertical shaft/pilot shaft through impact type drilling machine in impacting mode
CN103266599B (en) The dry construction method of digging drilling pile of soil skerry ground churning driven
CN101200893A (en) Construction method of pile with bearing base
CN102146672A (en) Method for constructing pile foundation in karst area
CN106837382B (en) A kind of subway tunnel country rock pre grouting from the surface reinforcement process
CN103290840A (en) Prestressed pipe pile construction method under boulder group geological conditions
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN113431490A (en) Large-diameter tubular pile construction equipment and method for karst area
CN103243712A (en) Caterpillar end-expanded filling pile with pneumatic down-the-hole hammer and quick construction method of caterpillar end-expanded filling pile
CN104314071A (en) Construction method of underground diaphragm wall by employing rotary drilling rig
CN109183790A (en) A kind of Screw Pile and its construction tool and construction method
CN105297710A (en) High-pressure-jetting cement soil twist drill and reamed reinforced concrete grouting combined pile and manufacturing method
CN103061341A (en) Middle-excavating pile-sinking construction method
CN102797254B (en) Construction method for bottom-expanded pile casting by long-spiral drilling and compacted half soil sampling
CN201459749U (en) Stable structure for construction platform of deep water steel pipe pile
CN105545315A (en) Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN101899827B (en) Broken soil vibration and compaction treatment method by utilizing impact hammer in immersed tube in riprap filled foundation
CN203129132U (en) Pneumatic rapid pore-forming composite pile
CN102605781A (en) Rocky bed steel pipe pile sinking construction process
CN109113054A (en) A kind of reclaimation area complex geological condition cast-in-situ bored pile multimachine combined construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20200301

CF01 Termination of patent right due to non-payment of annual fee