CN203127107U - 一种新型轻便集装箱绑扎桥 - Google Patents

一种新型轻便集装箱绑扎桥 Download PDF

Info

Publication number
CN203127107U
CN203127107U CN 201320116878 CN201320116878U CN203127107U CN 203127107 U CN203127107 U CN 203127107U CN 201320116878 CN201320116878 CN 201320116878 CN 201320116878 U CN201320116878 U CN 201320116878U CN 203127107 U CN203127107 U CN 203127107U
Authority
CN
China
Prior art keywords
square tube
passage
welded
colligation
lashing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320116878
Other languages
English (en)
Inventor
肖慧丽
张涛
戴昌贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ZHONGSHENG SCIENCE & TRADE CO., LTD.
Original Assignee
CARGO SECURING SYSTEM Corp INTERNATIONAL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CARGO SECURING SYSTEM Corp INTERNATIONAL filed Critical CARGO SECURING SYSTEM Corp INTERNATIONAL
Priority to CN 201320116878 priority Critical patent/CN203127107U/zh
Application granted granted Critical
Publication of CN203127107U publication Critical patent/CN203127107U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rigid Containers With Two Or More Constituent Elements (AREA)

Abstract

一种新型轻便集装箱绑扎桥,它涉及绑扎桥技术领域,它的第二通道的下侧设置有第一通道,第二通道、第一通道的外侧焊接有数个方管一,第二通道的上侧设置有绑扎通道,绑扎通道上焊接有绑扎眼板,数个栏杆设置在绑扎通道上,且焊接在方管一上,两个方管一之间分别焊接有方管二、方管三,两个方管一之间间隔焊接有方管四、方管五;它根据结构的受力形式及方向,对结构进行了优化分析,得到一种力的最佳传递路径的桁架结构形式,在优化分析结果的基础上对结构的尺寸进一步细化与修改,得到一种具体的结构形式,进行强度分析,并与常规形式的绑扎桥分析结果对比,根据分析结果的应力云图以及变形图对结构作出适当的调整,从而得到一种最轻便并且满足性能要求的绑扎桥形式。

Description

一种新型轻便集装箱绑扎桥
技术领域:
本实用新型涉及绑扎桥技术领域,具体涉及一种新型轻便集装箱绑扎桥。
背景技术:
近年来,随着集装箱运输的快速发展,集装箱船朝着大型化的方向发展,然而由于大型以及超大型集装箱船堆载的集装箱层数达到六层以上,在甲板或舱盖上的绑扎不能满足堆载层数和堆重的要求,因此,需要使用绑扎桥来满足这个要求。使用绑扎桥绑扎具有诸多优点:便于人员通过和绑扎操作,提高堆重,提高绑扎位置,减少绑扎件数量等。
绑扎桥安装在舱口盖之间的甲板上,一般为桁架结构或箱型结构,然而现有的绑扎桥普遍没有经过优化,因此结构刚度没有达到最大,重量较大,导致对钢材的消耗很大。
实用新型内容:
本实用新型的目的是提供一种新型轻便集装箱绑扎桥,它结构更轻便、简单,施工方便,能更好的满足使用要求。
为了解决背景技术所存在的问题,本实用新型是采用如下技术方案:它包含方管一1、绑扎眼板2、栏杆3、绑扎通道4、第二通道5、第一通道6、扶梯7、方管二9、方管三10、方管四11、方管五12、支柱13、弯钩14,第二通道5的下侧设置有第一通道6,第二通道5、第一通道6的外侧焊接有数个方管一1,第二通道5的上侧设置有绑扎通道4,绑扎通道4上焊接有绑扎眼板2,数个栏杆3设置在绑扎通道4上,且焊接在方管一1上,两个方管一1之间分别焊接有方管二9、方管三10,两个方管一1之间间隔焊接有方管四11、方管五12,扶梯7焊接在绑扎通道4、第二通道5与第一通道6的一端,支柱13焊接在第一通道6的一端,弯钩14焊接在绑扎通道4上。
所述的方管四11、方管五12呈X形,且方管四11、方管五12连接处焊接有衬板8。
所述的方管二9、方管三10呈倒V形,且方管二9、方管三10与方管一的连接处焊接有衬板8。
本实用新型首先根据结构的受力形式及方向,对结构进行了优化分析,得到一种力的最佳传递路径的桁架结构形式,在优化分析结果的基础上对结构的尺寸进一步细化与修改,得到一种具体的结构形式,进行强度分析,并与常规形式的绑扎桥分析结果对比,根据分析结果的应力云图以及变形图对结构作出适当的调整,从而得到一种最轻便并且满足性能要求的绑扎桥形式。本实用新型的变形和应力均接近许用值,并且小于许用值,即满足性能要求,最重要的是可以比常规形式的绑扎桥节省约20%的材料。
本实用新型的工作原理为:集装箱绑扎等操作人员可以从第一通道6、第二通道5到达扶梯7往上爬,经过人孔到达绑扎通道4,将绑扎设备绑扎杆的一端连接在绑扎眼板2上,绑扎杆的另一端放进集装箱箱角孔,锁紧,集装箱就被绑住了。
本实用新型的有益效果是:结构更轻便、简单,施工方便,能更好的满足使用要求。
附图说明:
图1为本实用新型的结构示意图,
图2为本实用新型的主视图,
图3为图1的左视图,
图4为本实用新型的立体图。
具体实施方式:
参看图1-图4,本具体实施方式如下:它包含方管一1、绑扎眼板2、栏杆3、绑扎通道4、第二通道5、第一通道6、扶梯7、方管二9、方管三10、方管四11、方管五12、支柱13、弯钩14,第二通道5的下侧设置有第一通道6,第二通道5、第一通道6的外侧焊接有数个方管一1,第二通道5的上侧设置有绑扎通道4,绑扎通道4上焊接有绑扎眼板2,数个栏杆3设置在绑扎通道4上,且焊接在方管一1上,两个方管一1之间分别焊接有方管二9、方管三10,两个方管一1之间间隔焊接有方管四11、方管五12,扶梯7焊接在绑扎通道4、第二通道5与第一通道6的一端,支柱13焊接在第一通道6的一端,弯钩14焊接在绑扎通道4上。
所述的方管四11、方管五12呈X形,且方管四11、方管五12连接处焊接有衬板8。
所述的方管二9、方管三10呈倒V形,且方管二9、方管三10与方管一的连接处焊接有衬板8。
本具体实施方式的工作原理为:集装箱绑扎等操作人员可以从第一通道6、第二通道5到达扶梯7往上爬,经过人孔到达绑扎通道4,将绑扎杆设备绑扎杆的一端连接在绑扎眼板2上,绑扎杆的另一端放进集装箱箱角孔,锁紧,集装箱就被绑住了。
本具体实施方式中方管一1的作用是抵抗结构变形等,绑扎眼板2的作用是配合绑扎设备绑扎集装箱,栏杆3在操作人员行走时起到保护作用,防止跌落受伤,绑扎通道4的作用是提供绑扎操作的空间,第二通道5、第一通道6为上下两层通道,主要作用是供操作人员行走,扶梯7的作用是供操作人员往上爬,衬板8的作用是降低局部应力,方管二9、方管三10、方管四11、方管五12的作用是抗剪切结构,抵抗剪切变形,支柱13的作用是放置在船舷边配合绑扎桥,弯钩14的作用是不绑扎的时候放置绑扎杆,即绑扎杆挂在上面,各部分通过焊接连在一起组成绑扎桥。
绑扎桥实际绑扎时顶端受力均匀,因此为了减轻重量,每两个集装箱端面两侧有两根支柱,即方管一1,方管一1为主要受力结构,抵抗结构的主要变形,根据不同的受力情况设置了不同的厚度。为了使结构最优化,结构刚度均匀,通过合理的布置抗剪结构方管二9、方管三10、方管四11、方管五12来实现,方管二9、方管三10在上层通道的两个箱位之间形成倒V字形抗剪梁,方管四11、方管五12在下层通道的两个箱位之间形成X形交叉的抗剪梁,沿受力方向起作用,防止产生剪切变形,由于起到抗剪切作用,因此尺寸不必过大,根据拓扑优化结果设置了合适的梁截面尺寸,以降低结构重量;它采用了单侧抗剪设置形式的结构,更好的满足了冷藏箱的绑扎操作要求。
本具体实施方式的有益效果是:结构更轻便、简单,施工方便,能更好的满足使用要求。

Claims (3)

1.一种新型轻便集装箱绑扎桥,其特征在于它包含方管一(1)、绑扎眼板(2)、栏杆(3)、绑扎通道(4)、第二通道(5)、第一通道(6)、扶梯(7)、方管二(9)、方管三(10)、方管四(11)、方管五(12)、支柱(13)、弯钩(14),第二通道(5)的下侧设置有第一通道(6),第二通道(5)、第一通道(6)的外侧焊接有数个方管一(1),第二通道(5)的上侧设置有绑扎通道(4),绑扎通道(4)上焊接有绑扎眼板(2),数个栏杆(3)设置在绑扎通道(4)上,且焊接在方管一(1)上,两个方管一(1)之间分别焊接有方管二(9)、方管三(10),两个方管一(1)之间间隔焊接有方管四(11)、方管五(12),扶梯(7)焊接在绑扎通道(4)、第二通道(5)与第一通道(6)的一端,支柱(13)焊接在第一通道(6)的一端,弯钩(14)焊接在绑扎通道(4)上。
2.根据权利要求1所述的一种新型轻便集装箱绑扎桥,其特征在于所述的方管四(11)、方管五(12)呈X形,且方管四(11)、方管五(12)连接处焊接有衬板(8)。
3.根据权利要求1所述的一种新型轻便集装箱绑扎桥,其特征在于所述的方管二(9)、方管三(10)呈倒V形,且方管二(9)、方管三(10)与方管一的连接处焊接有衬板(8)。
CN 201320116878 2013-03-15 2013-03-15 一种新型轻便集装箱绑扎桥 Expired - Fee Related CN203127107U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320116878 CN203127107U (zh) 2013-03-15 2013-03-15 一种新型轻便集装箱绑扎桥

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320116878 CN203127107U (zh) 2013-03-15 2013-03-15 一种新型轻便集装箱绑扎桥

Publications (1)

Publication Number Publication Date
CN203127107U true CN203127107U (zh) 2013-08-14

Family

ID=48935111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320116878 Expired - Fee Related CN203127107U (zh) 2013-03-15 2013-03-15 一种新型轻便集装箱绑扎桥

Country Status (1)

Country Link
CN (1) CN203127107U (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101520834B1 (ko) * 2013-10-10 2015-05-15 현대삼호중공업 주식회사 래싱 브리지
CN105905261A (zh) * 2016-06-27 2016-08-31 中海工业(江苏)有限公司 一种集装箱船绑扎桥立式总组胎架
CN106563867A (zh) * 2016-08-29 2017-04-19 上海外高桥造船有限公司 一种绑扎桥立式总组工艺
CN108657379A (zh) * 2018-05-16 2018-10-16 大连中远海运川崎船舶工程有限公司 一种伸缩式集装箱绑扎桥
CN109263792A (zh) * 2018-07-24 2019-01-25 上海江南长兴造船有限责任公司 一种大型集装箱船绑扎桥总段在船上正态移位的方法
CN110498013A (zh) * 2019-09-03 2019-11-26 中船黄埔文冲船舶有限公司 一种多用途船二甲板舱口盖及其安装结构
CN110615062A (zh) * 2019-10-10 2019-12-27 中船黄埔文冲船舶有限公司 一种船用绑扎眼环布置方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101520834B1 (ko) * 2013-10-10 2015-05-15 현대삼호중공업 주식회사 래싱 브리지
CN105905261A (zh) * 2016-06-27 2016-08-31 中海工业(江苏)有限公司 一种集装箱船绑扎桥立式总组胎架
CN105905261B (zh) * 2016-06-27 2018-01-09 中海工业(江苏)有限公司 一种集装箱船绑扎桥立式总组胎架
CN106563867A (zh) * 2016-08-29 2017-04-19 上海外高桥造船有限公司 一种绑扎桥立式总组工艺
CN108657379A (zh) * 2018-05-16 2018-10-16 大连中远海运川崎船舶工程有限公司 一种伸缩式集装箱绑扎桥
CN108657379B (zh) * 2018-05-16 2020-07-28 大连中远海运川崎船舶工程有限公司 一种伸缩式集装箱绑扎桥
CN109263792A (zh) * 2018-07-24 2019-01-25 上海江南长兴造船有限责任公司 一种大型集装箱船绑扎桥总段在船上正态移位的方法
CN109263792B (zh) * 2018-07-24 2020-04-21 上海江南长兴造船有限责任公司 一种大型集装箱船绑扎桥总段在船上正态移位的方法
CN110498013A (zh) * 2019-09-03 2019-11-26 中船黄埔文冲船舶有限公司 一种多用途船二甲板舱口盖及其安装结构
CN110615062A (zh) * 2019-10-10 2019-12-27 中船黄埔文冲船舶有限公司 一种船用绑扎眼环布置方法
CN110615062B (zh) * 2019-10-10 2021-11-30 中船黄埔文冲船舶有限公司 一种船用绑扎眼环布置方法

Similar Documents

Publication Publication Date Title
CN203127107U (zh) 一种新型轻便集装箱绑扎桥
CN203805409U (zh) 一种波纹腹板混凝土复合夹层承载板
CN103114681B (zh) 高空大跨度钢筋混凝土梁的待浇筑结构
CN105603893B (zh) 隧道口柔性鼻形滚石排导棚洞结构体及其设计方法
CN103215894B (zh) 移动式临时预应力张拉锚块
CN103243922B (zh) 楼板混凝土厚度控制装置
CN206233102U (zh) 一种可移动式临边作业工作平台
CN104775548B (zh) 柱贯通式波纹钢板耗能剪力墙结构
CN206049969U (zh) 一种用于搁置及运输超大型船体机舱的门架
CN203938346U (zh) 自动扶梯桁架连接结构
CN105421229B (zh) 一种多块式主索鞍结构
CN202000265U (zh) 桥梁高墩混凝土施工模板
CN207813629U (zh) 一种巷道强动载抗冲支护新型结构
CN107012974A (zh) 一种装配式钢纤维高强混凝土钢板组合抗爆墙体
CN104612324B (zh) 一种耗能加劲钢高分子夹层管及其制作工艺
CN203603073U (zh) 高架车站钢混格构式组合站台梁
CN105947108A (zh) 一种用于搁置及运输超大型船体机舱的门架
CN206053104U (zh) 一种轻型板结构
CN205116685U (zh) 可拆卸悬挑型钢卸料平台
CN202718126U (zh) 深基坑土方开挖转换平台
CN206693041U (zh) 索道桥钢横梁
CN204663099U (zh) 新型直升机停机坪甲板
CN209144634U (zh) 一种有较高承载能力的钢结构简易桥梁
CN106592451A (zh) 一种拱桥加固装置及方法
CN106759857A (zh) 钢管再生块体混凝土装配结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI ZHONGSHENG TECHNOLOGY + TRADE CO., LTD.

Free format text: FORMER NAME: CARGO SECURING SYSTEM CORPORATION INTERNATIONAL

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 200120 Shanghai city Pudong New Area Dongchang Road 498 No. 15 Lane 3012 rooms on the third floor

Patentee after: SHANGHAI ZHONGSHENG SCIENCE & TRADE CO., LTD.

Address before: 200120 Shanghai city Pudong New Area Dongchang Road 498 No. 15 Lane 3012 rooms on the third floor

Patentee before: Cargo Securing System Corporation International

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20210315