CN203113761U - Wall connection structure of scaffold - Google Patents

Wall connection structure of scaffold Download PDF

Info

Publication number
CN203113761U
CN203113761U CN 201220666024 CN201220666024U CN203113761U CN 203113761 U CN203113761 U CN 203113761U CN 201220666024 CN201220666024 CN 201220666024 CN 201220666024 U CN201220666024 U CN 201220666024U CN 203113761 U CN203113761 U CN 203113761U
Authority
CN
China
Prior art keywords
wall
scaffold
cross bar
bolt
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220666024
Other languages
Chinese (zh)
Inventor
张远
蔡天机
戴本铿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Electric Power Engineering Bureau Co ltd Of China Energy Engineering Corp ltd
Original Assignee
CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU filed Critical CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU
Priority to CN 201220666024 priority Critical patent/CN203113761U/en
Application granted granted Critical
Publication of CN203113761U publication Critical patent/CN203113761U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a wall connection structure of a scaffold, wherein a tie bar is formed by a bolt which is tensed by an end part nut and passes through a whole split bolt hole way and a whole rail; and a back shore is formed by the rail which is butted with the split bolt hole way and is supported on a wall body under the limitation of the tensed bolt. According to the wall connection structure disclosed by the utility model, the tie bar and the back shore are integrally combined skillfully, and the bar tying and the supporting can be finished for one step in a way that the bolt passes through the hole way and the end part nut is screwed in, so that the reliable connection of the scaffold and the wall body is realized, operation is simple, convenient and quick, labor strength is low, and construction time is short; meanwhile, the back shore directly utilizes the rail of the scaffold and is not additionally mounted, so that cost is reduced; and furthermore, after the construction is finished, the bolts can be directly detached, so that the attractive appearance of the wall body is not influenced.

Description

A kind of scaffold connecting structure
Technical field
When the utility model relates to wall construction in order to connect company's wall construction of scaffold and body of wall.
Background technology
During wall construction, during especially high wall construction, scaffold need use wall-connecting piece to be connected with the body of wall wall, to improve stability and the supporting capacity of scaffold; Avoid scaffold accident such as topple over, cave in to take place, make scaffold safer.
Stipulate according to " building operations fastener type steel pipe scaffold technical specification of security " JGJ130-2001: to the single, double row scaffold of height below 24m, should adopt the rigidity wall-connecting piece reliably to be connected with building, also can adopt lacing wire and shore the attached wall connected mode that is used.
Rigidity wall-connecting piece form, as Fig. 1, the surface of its clear-water concrete body of wall is provided with anchor slab 2 pre-buried when constructing, and an end of rigidity wall-connecting piece 3 is welded on the anchor slab 2, and the other end adopts fastener to be connected with scaffold.This kind structure needs welding during installation, need cutting during dismounting, and work progress comparatively bothers; And the anchor slab that is embedded in surface of wall can influence the outward appearance of body of wall, particularly has the anchor slab of scar after welding and cutting, can influence the attractive in appearance of body of wall greatly.
Lacing wire and shore the attached wall connected mode that is used, as Fig. 2, the template split bolt duct of leaving over when it utilizes clear-water concrete wall body structure forming construction 4, round steel or steel wire 5 pass this duct, one end is anchored on the clear-water concrete body of wall, the other end and scaffold buckle drawknot, form lacing wire; And in the position of lacing wire, telescopic rigidity steel member 6 is set, and steel member one end and scaffold adopt fastener to be connected and fixed, and the other end is shored on the clear-water concrete body of wall, and formation is shored.This kind structure can not influence the attractive in appearance of body of wall, but construction sequence is comparatively numerous and diverse, and labour intensity is bigger, and installation procedure is also more, comparatively consuming time simultaneously, can influence construction speed.
The utility model content
The utility model aims to provide a kind of exterior appearance that can not influence the clear-water concrete body of wall, and scaffold connecting structure easy and simple to handle.
Scaffold connecting structure described in the utility model, the rigidity pipe fitting that its scaffold setting is docked with the split bolt duct that wall construction is left over is as cross bar, the end of cross bar is provided with end casing, the port of cross bar and metope joint is provided with the pressure wallboard greater than the cross bar bore, bolt runs through whole split bolt duct and whole cross bar simultaneously, compresses by nut in the end.
Scaffold connecting structure described in the utility model, it forms lacing wire by the bolt that runs through whole split bolt duct and whole cross bar of end nut tension; By the cross bar that docks with the split bolt duct, under the restriction of the bolt of straining, be supported on the body of wall, formation is shored; It is dexterously with lacing wire with shore and be combined into one, and screws nut and gets final product a step and finish lacing wire and support by wearing bolt and end, realizes that scaffold is connected with the reliable of body of wall, and is simple, convenient, quick, labour intensity is low, the time of construction lacks.Simultaneously, shore the cross bar that directly utilizes scaffold, do not need extra setting, also reduced cost.In addition, after construction finished, bolt can directly be dismantled, and also can not influence the outward appearance of body of wall.
Description of drawings
Fig. 1 is the sectional view of rigidity wall-connecting piece form in the prior art.
Fig. 2 is for lacing wire in the prior art and shore the sectional view of the attached wall connected mode that is used.
Fig. 3 is the sectional view of a kind of situation of the present utility model.
Fig. 4 forms the sectional view of a kind of situation of scaffold for the utility model.
Fig. 5 is the sectional view of rigidity pipe fitting described in the utility model.
Fig. 6 is the sectional view of another kind of situation described in the utility model.
Fig. 7 forms the sectional view of the another kind of situation of scaffold for the utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
Shown in Fig. 5-7, the cross bar 8 of scaffold is rigidity pipe fitting 7, the position in the split bolt duct of leaving over when the pore of cross bar 8 is constructed with body of wall 14 is relative, cross bar 8 and split bolt duct 4 close butt joints with scaffold, use bolt 10 to penetrate split bolt duct 4 from the body of wall opposite side, behind the cross bar 8 that runs through whole split bolt duct 4 and dock with it, penetrate from the pressure wallboard 17 of cross bar 8 with the metope joint earlier, end casing 9 from the tail end of cross bar 8 passes again, screwing on nut 11 again is pressed on the end casing 9, and scaffold is pressed on the body of wall wall by cross bar, the realization scaffold is connected with body of wall.
Bolt 10 can adopt plain bolt,, perhaps adds the large-area pressure wallboard 17 that places between bolt head and the wall and fixes with metope by fixing by head and metope at relative scaffold opposite side.Bolt 10 also can adopt split bolt, screws with metope by nut equally at relative scaffold opposite side and fixes, and large-area pressure wallboard 17 can be set between nut and wall equally fix with metope, as Fig. 6.
Cross bar and body of wall contact jaw can arrange large-area pressure wallboard 17 equally, press the contact area of wallboard and body of wall wall greater than the cross bar bore, by pressing wallboard directly to contact with wall, thus the contact area of increase cross bar and body of wall wall, the steadiness that is connected with body of wall with further raising scaffold.Press wallboard can only place between cross bar and wall, also can directly be fixed on crossbar end by modes such as welding.Described pressure wallboard 17 can be circle, square, triangle, hexagon or other shape.
Fig. 3-4, if body of wall 1 both sides all need arrange scaffold, then the cross bar 8 of both sides scaffold can be docked with the two ends in split bolt duct 4 are close respectively, bolt 10 penetrates from the end casing 9 of the cross bar 8 of the scaffold of body of wall one side, pass from the pressure wallboard 17 of cross bar 8 with the metope joint again, behind the pressure wallboard 17 and cross bar 8 of split bolt duct 4 and opposite side, pass from the end casing 9 of the cross bar 8 of the scaffold of opposite side, screw on nut 11 again is pressed on the end casing 9 at the two ends of bolt 10, the scaffold that makes two ends is firm being pressed on the body of wall together, realize being connected of both sides scaffold and body of wall simultaneously, set up vertical equity bar 12 at cross bar 8 then, vertical rod 13 and transverse horizontal bar 14 form scaffold.

Claims (2)

1. scaffold connecting structure, it is characterized in that: the rigidity pipe fitting that the scaffold setting is docked with the split bolt duct (4) that body of wall (1) construction is left over is as cross bar (8), the end of cross bar is provided with end casing (9), bolt (10) runs through whole split bolt duct and whole cross bar simultaneously, compresses by nut (11) in the end.
2. a kind of scaffold connecting structure according to claim 1 is characterized in that: cross bar and body of wall contact jaw are provided with presses wallboard (17), presses the contact area of wallboard and body of wall wall greater than the cross bar bore.
CN 201220666024 2012-12-06 2012-12-06 Wall connection structure of scaffold Expired - Lifetime CN203113761U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220666024 CN203113761U (en) 2012-12-06 2012-12-06 Wall connection structure of scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220666024 CN203113761U (en) 2012-12-06 2012-12-06 Wall connection structure of scaffold

Publications (1)

Publication Number Publication Date
CN203113761U true CN203113761U (en) 2013-08-07

Family

ID=48894124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220666024 Expired - Lifetime CN203113761U (en) 2012-12-06 2012-12-06 Wall connection structure of scaffold

Country Status (1)

Country Link
CN (1) CN203113761U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437459A (en) * 2013-09-11 2013-12-11 中建新疆建工集团第五建筑工程有限公司 Through-wall opposite-pulling screw sleeve wall-connecting element
CN109555302A (en) * 2019-01-04 2019-04-02 万华节能科技集团股份有限公司 A kind of the hanging basket bracket and its construction technology of thermal-insulating leakage-resistant crossed construction
CN112942791A (en) * 2021-04-13 2021-06-11 北京天润建设有限公司 Small-space lifting scaffold and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437459A (en) * 2013-09-11 2013-12-11 中建新疆建工集团第五建筑工程有限公司 Through-wall opposite-pulling screw sleeve wall-connecting element
CN109555302A (en) * 2019-01-04 2019-04-02 万华节能科技集团股份有限公司 A kind of the hanging basket bracket and its construction technology of thermal-insulating leakage-resistant crossed construction
CN112942791A (en) * 2021-04-13 2021-06-11 北京天润建设有限公司 Small-space lifting scaffold and construction method

Similar Documents

Publication Publication Date Title
CN103104092B (en) Support composite structure of beam and slab
CN203113761U (en) Wall connection structure of scaffold
CN203201140U (en) Beam slab support
CN201427197Y (en) Upward drilling punching device
CN204728676U (en) Bearing hanging rack for supporting variable cross-section wall
CN207073287U (en) A kind of hydraulic pressure adjustable diagonal bracing device
CN202338111U (en) Special supporting frame for building template
CN205955173U (en) Modular link wall spare subassembly
CN202124933U (en) Connecting structure for steel bar truss floor deck and concrete wall column
CN204199182U (en) A kind of head tower construction inhaul cable anchorage structure
CN203514808U (en) Wall formwork supporting composite structure
CN205840316U (en) Large span Zhongting hanging structure form bracing system
CN203654708U (en) Side slope scaffold unloading device
CN204062152U (en) High-pressure service pump pipe fixing device
CN207092589U (en) The ruggedized construction of C-type steel/Z-shape steel purlin
CN202831623U (en) Concrete arch-shaped template supporting structure
CN103726575B (en) A kind of prefabricated balcony slab and balcony support and connection structure
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN204079226U (en) A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts
CN203547114U (en) Wall connecting assembly
CN203160251U (en) Connecting device for joints of steel and wood templates
CN203793576U (en) Scaffold
CN203783143U (en) Clamping rod component for preventing mould expanding
CN202645599U (en) Adjustable combined member for surface protection
CN201546441U (en) Building scaffold wall fastener

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 510735 Whampoa, Guangzhou, Whampoa District, No. 3375 East Road, Guangdong

Patentee after: CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU

Address before: 510735, No. 3375, Whampoa East Road, Guangzhou, Guangdong, Huangpu District

Patentee before: CEEC Guangdong Electric Power First Engineering Bureau

C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP GUANGDONG ELECTRIC

Free format text: FORMER NAME: CEEC GUANGDONG ELECTRIC POWER FIRST ENGINEERING BUREAU

CP01 Change in the name or title of a patent holder

Address after: 510735 Whampoa, Guangzhou, Whampoa District, No. 3375 East Road, Guangdong

Patentee after: GUANGDONG ELECTRIC POWER ENGINEERING BUREAU CO.,LTD. OF CHINA ENERGY ENGINEERING Corp.,Ltd.

Address before: 510735 Whampoa, Guangzhou, Whampoa District, No. 3375 East Road, Guangdong

Patentee before: CEEC Guangdong Electric Power First Engineering Bureau

CX01 Expiry of patent term

Granted publication date: 20130807

CX01 Expiry of patent term