CN203099125U - 矿井膏体填充管路的伸缩结构 - Google Patents
矿井膏体填充管路的伸缩结构 Download PDFInfo
- Publication number
- CN203099125U CN203099125U CN 201320134782 CN201320134782U CN203099125U CN 203099125 U CN203099125 U CN 203099125U CN 201320134782 CN201320134782 CN 201320134782 CN 201320134782 U CN201320134782 U CN 201320134782U CN 203099125 U CN203099125 U CN 203099125U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- mine
- telescopic structure
- filled
- shrinking structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本实用新型公开一种矿井膏体填充管路的伸缩结构,其包括第一管路、第二管路、及第三管路,第二管路的左端和右端分别***第一管路和第二管路,第一管路和第三管路的内壁面均设置有与第二管路相贴合的密封垫。第三管路的上方和下方分别设置有液压缸,液压缸的活塞杆通过连杆与第二管路连接,活塞杆带动第二管路左右移动。所述第二管路右端的外壁面设置有与第三管路相贴合的密封垫。此种伸缩结构具有维护方便,维修效率高,密封性好的优势。
Description
技术领域
本实用新型涉及矿井膏体填充设备技术领域,具体涉及填充管路的伸缩结构。
背景技术
煤矿采空区内进行回填,逐渐成为煤矿生产的基本要求,填充原料通过填充管路运输,填充管路由多根钢管相接而成,接头处使用管卡固定,此种连接方式较为牢固,且耐用性强。但管路出现堵塞,维修过程较为费力,需要打开管卡,拆分管路进行维修。由于井下条件苛刻,管路拆分由人工完成,存在较大的安全隐患,因此,发明人预想设计一种便于拆装的伸缩式填充管路。
实用新型内容
本实用新型的目的在于提供一种矿井膏体填充管路的伸缩结构,该伸缩结构造型新颖,连接牢靠,易于拆分。
本实用新型为了实现上述目的,采用的技术解决方案是:
矿井膏体填充管路的伸缩结构,包括第一管路、第二管路、及第三管路,第二管路的左端和右端分别***第一管路和第二管路,第一管路和第三管路的内壁面均设置有与第二管路相贴合的密封垫;第三管路的上方和下方分别设置有液压缸,液压缸的活塞杆通过连杆与第二管路连接,活塞杆带动第二管路左右移动。
优选地,所述第二管路右端的外壁面设置有与第三管路相贴合的密封垫。
优选地,所述第三管路的右端收口。
优选地,所述第一管路的内径在10厘米至20厘米之间。
本实用新型的有益效果:
此种填充管路由能够左右移动的第二管路将第一管路和第三管路连通,在管路发生堵塞时,由液压缸带动第二管路向右侧移动,使第二管路与第一管路脱开,进行放浆疏通。待管路整体导通后,由液压缸带动第二管路向左侧移动,使第二管路与第一管路相插接,进行正常的原料输送。具有维护方便,维修效率高,密封性好的优势。
附图说明
图1是矿井膏体填充管路的伸缩结构的结构示意图。
具体实施方式
下面结合附图对本实用新型进行详细说明:
结合图1,矿井膏体填充管路的伸缩结构,包括第一管路1、第二管路2、及第三管路3,第二管路2的左端和右端分别***第一管路1和第二管路2,第一管路1和第三管路3的内壁面均设置有与第二管路2相贴合的密封垫4。第三管路3的上方和下方分别设置有液压缸5,液压缸5的活塞杆6通过连杆7与第二管路2连接,活塞杆6带动第二管路2左右移动。
所述第一管路1的内径为10厘米、15厘米、或20厘米,第二管路2右端的外壁面设置有与第三管路3相贴合的密封垫8,第三管路3的右端收口。
此种填充管路由能够左右移动的第二管路将第一管路和第三管路连通,在管路发生堵塞时,由液压缸带动第二管路向右侧移动,使第二管路与第一管路脱开,进行放浆疏通。待管路整体导通后,由液压缸带动第二管路向左侧移动,使第二管路与第一管路相插接,进行正常的原料输送。具有维护方便,维修效率高,密封性好的优势。
当然,上述说明并非是对本实用新型的限制,本实用新型也并不仅限于上述举例,本技术领域的技术人员在本实用新型的实质范围内所做出的变化、改型、添加或替换,也应属于本实用新型的保护范围。
Claims (4)
1.矿井膏体填充管路的伸缩结构,其特征在于,包括第一管路、第二管路、及第三管路,第二管路的左端和右端分别***第一管路和第二管路,第一管路和第三管路的内壁面均设置有与第二管路相贴合的密封垫;第三管路的上方和下方分别设置有液压缸,液压缸的活塞杆通过连杆与第二管路连接,活塞杆带动第二管路左右移动。
2.根据权利要求1所述的矿井膏体填充管路的伸缩结构,其特征在于,所述第二管路右端的外壁面设置有与第三管路相贴合的密封垫。
3.根据权利要求1所述的矿井膏体填充管路的伸缩结构,其特征在于,所述第三管路的右端收口。
4.根据权利要求1所述的矿井膏体填充管路的伸缩结构,其特征在于,所述第一管路的内径在10厘米至20厘米之间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320134782 CN203099125U (zh) | 2013-03-09 | 2013-03-09 | 矿井膏体填充管路的伸缩结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320134782 CN203099125U (zh) | 2013-03-09 | 2013-03-09 | 矿井膏体填充管路的伸缩结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203099125U true CN203099125U (zh) | 2013-07-31 |
Family
ID=48850529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320134782 Expired - Fee Related CN203099125U (zh) | 2013-03-09 | 2013-03-09 | 矿井膏体填充管路的伸缩结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203099125U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105293075A (zh) * | 2015-11-13 | 2016-02-03 | 重庆索利特涂料有限公司 | 一种带有升降装置的吸料装置 |
CN106376433A (zh) * | 2016-08-30 | 2017-02-08 | 山东胜伟园林科技有限公司 | 交替灌给水机构 |
-
2013
- 2013-03-09 CN CN 201320134782 patent/CN203099125U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105293075A (zh) * | 2015-11-13 | 2016-02-03 | 重庆索利特涂料有限公司 | 一种带有升降装置的吸料装置 |
CN106376433A (zh) * | 2016-08-30 | 2017-02-08 | 山东胜伟园林科技有限公司 | 交替灌给水机构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201462207U (zh) | 防护井过孔与地埋管道之间的密封装置 | |
CN203099125U (zh) | 矿井膏体填充管路的伸缩结构 | |
CN202561316U (zh) | 高压防漏油管接头 | |
CN202452006U (zh) | 石油套管接头 | |
CN204213510U (zh) | 双o型圈承插螺纹拉杆连接装置 | |
CN204592624U (zh) | 一种应用于液压管路中的连接接头 | |
CN202972298U (zh) | 一种管道伸缩接头 | |
CN203023719U (zh) | 密封腔设为斜面的管道补偿器 | |
CN103836290A (zh) | 法兰连接式单式套筒伸缩节 | |
CN203162431U (zh) | 链式管道堵漏卡具 | |
CN204283238U (zh) | 一种石油套管接头 | |
CN205532356U (zh) | 石油套管接头 | |
CN204493988U (zh) | 一种高压泄漏管道柔性预紧式补偿堵漏夹具 | |
CN203808965U (zh) | 一种用于煤矿井下压裂的***筒 | |
CN202532078U (zh) | 一种高压管路伸缩器 | |
CN203223679U (zh) | 单式套筒伸缩节 | |
CN203068009U (zh) | 伸缩接头管 | |
CN202255781U (zh) | 水冷壁打压装置 | |
CN201902705U (zh) | 一种非金属管穿底板防水套管 | |
CN204082045U (zh) | 一种海洋工程用高压泥浆管连接结构 | |
CN103062564A (zh) | 一种提高管道补偿器密封填料均匀性的方法 | |
CN203880286U (zh) | 迷宫式胶管芯子 | |
CN204099775U (zh) | 一种高密封性多层复合管道 | |
CN204026035U (zh) | 一种管道堵漏装置 | |
CN202442030U (zh) | 新型波纹管接头 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130731 Termination date: 20140309 |