CN203069393U - 盾构隧道管片衬砌力学试验模型 - Google Patents
盾构隧道管片衬砌力学试验模型 Download PDFInfo
- Publication number
- CN203069393U CN203069393U CN 201320059555 CN201320059555U CN203069393U CN 203069393 U CN203069393 U CN 203069393U CN 201320059555 CN201320059555 CN 201320059555 CN 201320059555 U CN201320059555 U CN 201320059555U CN 203069393 U CN203069393 U CN 203069393U
- Authority
- CN
- China
- Prior art keywords
- section
- shield tunnel
- jurisdiction
- test model
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本实用新型公开了一种盾构隧道管片衬砌力学试验模型,包括由相似材料整体浇注而成管片环、管片环上开有模拟管片接头刚度弱化效应的凹槽,其特征在于:所述的管片环分为上部区域(1a)、下部区域(1b)、左侧区域(1c)、右侧区域(1d),上部区域(1a)和下部区域(1b)的模拟管片接头刚度弱化效应的凹槽(2a)开在管片环的内侧,左侧、右侧区域的模拟管片接头刚度弱化效应的凹槽(2b)开在管片环的外侧。该种试验模型能够更好的模拟盾构隧道管片接头部位的力学特性,尤其可以很好的模拟盾构隧道管片衬砌的大变形及渐进性破坏过程;试验误差小,能对隧道的设计、施工及维护加固提供更加准确、可靠的试验数据。
Description
技术领域
本实用新型涉及一种盾构隧道试验模型。
背景技术
目前,盾构隧道由于其自身的优点,在城市轨道交通、越江跨海通道以及市政管道等的建设中得到了越来越广泛的应用。盾构隧道主要采用环向接头将多个弧形的单层衬砌管片拼接成管片环,再通过纵向接头将管片环以通缝或错缝方式拼装成盾构隧道。由于工程水文地质条件的复杂性、隧道规模及细部构造的差异,以及盾构隧道对工程安全的高要求,通常需要通过模型试验研究揭示盾构隧道管片衬砌结构的力学特性。鉴于盾构隧道管片接头的复杂性,在实施盾构隧道模型试验过程中,如何考虑盾构隧道管片接头的力学效应是一个重要的问题。
通过对现有技术的文献检索发现,在已有的力学模型试验中,模拟盾构隧道的力学特性采用的力学试验模型主要有以下两种:
第一种力学试验模型以修正惯用法作为理论依据,用管片衬砌环整体抗弯刚度的降低等效盾构隧道管片接头部位抗弯刚度的降低,来考虑管片环向接头对盾构隧道管片衬砌结构力学特性的影响。从而采用材质均匀金属管、有机材料管等圆形结构作为力学试验模型材料,根据盾构隧道横向刚度等效原则,确定出力学试验模型衬砌厚度,该力学试验模型在试验过程中仅能近似模拟管片衬砌结构的整体力学特征,但是由于无法反映管片衬砌接头部位的局部应力集中效应及接头转动等力学特性,模型试验得到的隧道管片的内力和变形规律与原型隧道差别较大。
第二种力学试验模型为同济大学实用新型专利(公开号:CN101299008A),该模型管片采用配置的相似材料整体浇注而成,对于环向接头、纵向接头的刚度弱化效应,通过在对应于环向接头、纵向接头部位的管片环外侧切割出相应的凹槽予以实现,凹槽深度根据等效刚度原理通过计算进行确定,如图2所示。
上述两种模型中,第二种模型由于其在处理管片接头该模型在一定程度上保证了模型相似比的要求,与实际情况更为接近,因此被广泛接受并使用。但实际上管片环在以竖向荷载为主的外荷载作用下,其不同部位的变形及内力分布是有区别的:拱顶、拱底部位受正弯矩作用,位移指向管片内侧,该部位管片环内侧受拉;左拱腰、右拱腰部位受负弯矩作用,位移指向管片外侧,该部位管片环外侧受拉。实际管片环的接头(相邻管片的螺栓连接部位)应表现为管片环受拉侧张开,而该模型用于模拟管片接头的凹槽均开在管片环外侧,导致管片环位于拱顶及拱底的接头(内侧连续,无凹槽)无法张开,从而造成不该有的应力集中,其变形及受力状态与实际不相符合。试验数据误差大,尤其在模拟盾构隧道管片衬砌结构承受极限荷载发生大变形及渐进性破坏时,这种由于接头处理方式带来的误差更将会被放大。难以对隧道的设计、施工及维护提供准确、可靠的试验数据。
实用新型内容
本实用新型要解决的技术问题是提出一种盾构隧道管片衬砌力学试验模型,该种试验模型能够更好的模拟盾构隧道管片接头部位的力学特性,尤其可以很好的模拟盾构隧道管片衬砌的大变形及渐进性破坏过程;试验误差小,能对隧道的设计、施工及维护加固提供更加准确、可靠的试验数据。
本实用新型解决其技术问题所采用的技术方案是,一种盾构隧道管片衬砌力学试验模型,包括由相似材料整体浇注而成管片环、管片环上开有模拟管片接头刚度弱化效应的凹槽,其特征在于:所述的管片环分为上部区域、下部区域、左侧区域、右侧区域;上部区域和下部区域的模拟管片接头刚度弱化效应的凹槽开在管片环的内侧,左侧、右侧区域的模拟管片接头刚度弱化效应的凹槽开在管片环的外侧。
与现有技术相比,本实用新型的有益效果是:
本实用新型在采用凹槽模拟接头部位刚度弱化时,考虑了管片环不同部位在外荷载下的受力及变形特性,对整个管片环进行了分区处理:其中,上部、下部(拱顶、拱底)区域受正弯矩作用,位移指向管片内侧,该区域管片环内侧受拉,相应的凹槽开在管片环内侧;而左侧、右侧(左拱腰、右拱腰)区域受负弯矩作用,位移指向管片外侧,该区域管片环外侧受拉,相应的凹槽开在管片环外侧。从而实现了管片环在受拉侧开槽,在外荷载作用下可以正确模拟管片环所有接头的张开效应,消除不该有的应力集中,使其变形及受力状态与实际相符,进而减小试验数据误差。尤其在模拟盾构隧道管片衬砌结构承受极限荷载发生大变形及渐进性破坏时,这种接头处理方式使试验模型的变形、受力、破坏及失稳等更符合实际管片环相关特性,更为显著地减小试验数据误差。从而能对隧道的设计、施工及维护提供更准确、可靠的试验数据。
上述的管片环的上部区域、下部区域、左侧区域、右侧区域均分,即每个区域的弧度为90°。
下面结合附图和具体实施方式对本实用新型作进一步的详细说明。
附图说明
图1为本实用新型实施例的力学试验模型的结构示意图。图中,虚线为管片环的四个区域的分界线。
具体实施方式
实施例
图1示出,本实用新型的一种具体实施方式是,一种盾构隧道管片衬砌力学试验模型,包括由相似材料整体浇注而成管片环、管片环上开有模拟管片接头刚度弱化效应的凹槽。所述的管片环分为上部区域1a、下部区域1b、左侧区域1c、右侧区域1d;上部区域1a和下部区域1b的模拟管片接头刚度弱化效应的凹槽2a开在管片环的内侧,左侧、右侧区域的模拟管片接头刚度弱化效应的凹槽2b开在管片环的外侧。
本例的管片环的上部区域1a、下部区域1b、左侧区域1c、右侧区域1d均分,即每个区域的弧度为90°。
每个区域的具***置为:上部区域1a和下部区域1b为沿管片环的垂直轴线±45°,左侧区域1c、右侧区域1d为沿管片环的水平轴线±45°。
Claims (2)
1.一种盾构隧道管片衬砌力学试验模型,包括由相似材料整体浇注而成管片环、管片环上开有模拟管片接头刚度弱化效应的凹槽,其特征在于:所述的管片环分为上部区域(1a)、下部区域(1b)、左侧区域(1c)、右侧区域(1d);上部区域(1a)和下部区域(1b)的模拟管片接头刚度弱化效应的凹槽(2a)开在管片环的内侧,左侧、右侧区域的模拟管片接头刚度弱化效应的凹槽(2b)开在管片环的外侧。
2.根据权利要求1所述的盾构隧道管片衬砌力学试验模型,其特征在于:所述的管片环的上部区域(1a)、下部区域(1b)、左侧区域(1c)、右侧区域(1d)均分,即每个区域的弧度为90°。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320059555 CN203069393U (zh) | 2013-02-01 | 2013-02-01 | 盾构隧道管片衬砌力学试验模型 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320059555 CN203069393U (zh) | 2013-02-01 | 2013-02-01 | 盾构隧道管片衬砌力学试验模型 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203069393U true CN203069393U (zh) | 2013-07-17 |
Family
ID=48768167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320059555 Expired - Fee Related CN203069393U (zh) | 2013-02-01 | 2013-02-01 | 盾构隧道管片衬砌力学试验模型 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203069393U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103953349A (zh) * | 2014-04-24 | 2014-07-30 | 西南交通大学 | 一种管片接头刚度可控变化的隧道模型试验方法 |
CN108776033A (zh) * | 2018-03-30 | 2018-11-09 | 西南交通大学 | 一种用于盾构隧道纵向模型试验的衬砌模型及制作方法 |
CN109655346A (zh) * | 2018-11-06 | 2019-04-19 | 无锡地铁集团有限公司 | 一种隧道管片纵向力模拟施加装置及其方法 |
CN109799327A (zh) * | 2019-03-08 | 2019-05-24 | 西南交通大学 | 一种可视化的盾构隧道施工注浆效果检测试验装置和方法 |
-
2013
- 2013-02-01 CN CN 201320059555 patent/CN203069393U/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103953349A (zh) * | 2014-04-24 | 2014-07-30 | 西南交通大学 | 一种管片接头刚度可控变化的隧道模型试验方法 |
CN108776033A (zh) * | 2018-03-30 | 2018-11-09 | 西南交通大学 | 一种用于盾构隧道纵向模型试验的衬砌模型及制作方法 |
CN108776033B (zh) * | 2018-03-30 | 2023-09-22 | 西南交通大学 | 一种用于盾构隧道纵向模型试验的衬砌模型及制作方法 |
CN109655346A (zh) * | 2018-11-06 | 2019-04-19 | 无锡地铁集团有限公司 | 一种隧道管片纵向力模拟施加装置及其方法 |
CN109655346B (zh) * | 2018-11-06 | 2021-05-04 | 无锡地铁集团有限公司 | 一种隧道管片纵向力模拟施加装置及其方法 |
CN109799327A (zh) * | 2019-03-08 | 2019-05-24 | 西南交通大学 | 一种可视化的盾构隧道施工注浆效果检测试验装置和方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103162981B (zh) | 一种盾构隧道管片衬砌相似试验模型 | |
CN203069393U (zh) | 盾构隧道管片衬砌力学试验模型 | |
CN104264899B (zh) | 嵌入式外包u形钢-混凝土组合梁 | |
CN104533433A (zh) | 小半径曲线隧道的始发方法 | |
CN107130968A (zh) | 一种隧道建设用中隔墙 | |
CN105043884A (zh) | 综合管廊管节承载能力试验装置及使用方法 | |
CN203475704U (zh) | 桩基钢筋笼钢筋的连接结构 | |
CN103244134A (zh) | 负覆土工况下盾构隧道抗浮压重的方法 | |
CN103628416A (zh) | 悬索桥加劲梁对拉式墩旁托架 | |
CN103911950A (zh) | 一种大型组合梁钢主梁整孔及制作方法 | |
CN106758742B (zh) | 一种曲形变截面鱼腹式连续钢箱梁及其施工方法 | |
CN109488331A (zh) | 成型盾构隧道管片及其受力测试方法 | |
CN103527215B (zh) | 一种超小曲率半径盾构隧道的通用楔形管片环 | |
Lou et al. | Analysis of shield tunnels undercrossing an existing building and tunnel reinforcement measures | |
CN204002796U (zh) | 盾构始发钢负环结构 | |
CN209430206U (zh) | 成型盾构隧道管片 | |
CN201574762U (zh) | 隧道的中隔墙结构 | |
CN207672476U (zh) | 防撞护栏构造 | |
CN203689815U (zh) | 一种隧道微台阶法工艺教学仿真体 | |
CN206418394U (zh) | 一种铁路高墩大跨连续刚构桥主墩 | |
CN205091090U (zh) | 一种盾构隧道管片环缝抗渗性能试验用试件 | |
CN205015228U (zh) | 综合管廊管节承载能力试验装置 | |
CN102444089B (zh) | 大风区预制构件拼装式防风明洞及其接头拼装连接方法 | |
CN207484310U (zh) | 一种对悬臂梁式桥体接合处进行加固的支撑结构 | |
CN205907901U (zh) | 一种新型钢管混凝土柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130717 Termination date: 20160201 |