CN203033682U - Installing and maintaining crane for deep well device - Google Patents

Installing and maintaining crane for deep well device Download PDF

Info

Publication number
CN203033682U
CN203033682U CN 201320031699 CN201320031699U CN203033682U CN 203033682 U CN203033682 U CN 203033682U CN 201320031699 CN201320031699 CN 201320031699 CN 201320031699 U CN201320031699 U CN 201320031699U CN 203033682 U CN203033682 U CN 203033682U
Authority
CN
China
Prior art keywords
plate
water pipe
chuck
deep well
side plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201320031699
Other languages
Chinese (zh)
Inventor
慎志东
杨志强
陈林山
贾金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Donghua Machinery Co Ltd
Original Assignee
Shanxi Donghua Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Donghua Machinery Co Ltd filed Critical Shanxi Donghua Machinery Co Ltd
Priority to CN 201320031699 priority Critical patent/CN203033682U/en
Application granted granted Critical
Publication of CN203033682U publication Critical patent/CN203033682U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the technical field of deep well devices, and provides an installing and maintaining crane for a deep well device, which clamps a pump pipe by using a hydraulic device, saves labor force, is high in efficiency and is safe and reliable. According to the adopted technical scheme, the installing and maintaining crane comprises a derrick, an electric hoist, a water pipe hook chuck and a wellhead water pipe chuck, wherein the derrick is fixed right above a well, the electric hoist is arranged on the derrick, the water pipe hook chuck is connected by using a hoisting hook of the electric hoist, the wellhead water pipe chuck is fixed on a wellhead, two side plates and one lower connecting plate are fixed together to form a groove, a hole is formed in the middle of the lower connecting plate, two first hydraulic cylinders are relatively fixed on the lower connecting plate, the piston rod ends of the two first hydraulic cylinders are respectively fixedly provided with a chuck, the two chucks are matched to form a circular clamping surface, a hoisting shaft is arranged at the lower parts of the two side plates and fixed between the two side plates, and the wellhead water pipe chuck comprises a working platform, a first clamping part and a second clamping part. The installing and maintaining crane is mainly used for installing and maintaining the deep well device.

Description

A kind of deep well maintaining equipments driving
Technical field
A kind of deep well maintaining equipments driving of the utility model belongs to the deep well equipment technical field.
Background technology
Deficient day by day along with water resource, well also more bores more dark, in case the water pump in the deep well goes wrong when needing repairing like this, water pump is taken out maintenance from deep well and keep in repair after put into well, become a stubborn problem.Method commonly used is that a plurality of workmans utilize hinge manually to hang to draw, and also there is certain potential safety hazard in time-consuming, the effort of such operating mode.
The utility model content
A kind of deep well maintaining equipments driving of the utility model has overcome the deficiency that prior art exists, and a kind of maintenance driving that utilizes hydraulic efficiency equipment to clamp pump line is provided, and saves manpower, efficient height, safe and reliable.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of deep well maintaining equipments driving, comprise derrick, electric block, water pipe hook chuck, well head water pipe chuck, derrick be fixed on well directly over, electric block is installed on the derrick, the suspension hook of the moving cucurbit of water pipe hook chuck electricity consumption connects, well head water pipe chuck is fixed on the well head, the structure of water pipe hook chuck is: two side plates and lower plate formation flute profile that is fixed together, the middle part of described lower plate has the hole, relative fixed has two first hydraulic rams on the lower plate, the rod end of two described first hydraulic rams all fixedly has a dop, and described two dops cooperate the clamping face that forms a circle; Hanging axis is on the top of two side plates and be fixed between two side plates;
Well head water pipe chuck comprises bench board, first clamping part and second clamping part, the structure of bench board is: comprise base plate, top board and Duo Gen strut bar, base plate and top board be arranged in parallel, and the equal correspondence in the middle part of base plate and top board has through hole, many described strut bars are symmetrical arranged and base plate and top board are linked into an integrated entity, and the through hole both sides of described base plate all are arranged with two stay bearing plates in parallel;
The structure of first clamping part is: two clamping plate be arranged in parallel and the middle part correspondence has long through-hole, the 3rd bearing pin passes this long through-hole the piston rod of second hydraulic ram and the middle part of two described clamping plate is linked together, the cylinder body of second hydraulic ram is fixed on the base plate by bracing frame, one end of two described clamping plate is provided with clamp, and the other end of two clamping plate is hinged by the 4th bearing pin and described stay bearing plate;
First clamping part and second clamping part are symmetricly set on the through hole both sides of described base plate, and second clamping part is identical with the structure of first clamping part, and two clamps on second clamping part and first clamping part cooperate the clamping face that forms circle.
Fixedly there is the middle part to have the upper plate in hole between described two side plates, upper plate is positioned at the lower plate top, two first bearing pins are separately fixed between upper plate and the lower plate, the cylinder ends of two described first hydraulic rams is sleeved on corresponding first bearing pin, and the cylinder ends of first hydraulic ram is provided with upper support cover and lower support cover up and down.
The outside at described two side plates middle part all vertically is provided with a plurality of deep floors, and two brace panels that take the shape of the letter U are stuck on two side plates, and two brace panels are positioned at the both sides of described lower plate centre hole and are connected with lower plate.
The inboard of described two side plates all has horizontal guide groove, and the both sides of described two dops are provided with guide protrusions, and the guide protrusions on the described dop matches with guide groove on the side plate.
Be provided with a plurality of vertical grooves on the clamping face of described two dops.
Be set with two reinforcing sleeves on the described hanging axis, and described two reinforcing sleeves are separately fixed at the inboard of two side plates.
The two ends of support frame as described above are symmetrically arranged with two permanent seats, two described permanent seats cooperate formation U-shaped hold down groove with bracing frame, the cylinder body of second hydraulic ram is arranged in this U-shaped hold down groove, and the both sides correspondence of adapter plate is arranged on two described permanent seats and described second hydraulic ram is fixed.
Support frame as described above all is separately fixed on the corresponding stay bearing plate by two second bearing pins.
Also be provided with two safeguards that prevent that pump line from falling on the described top board, one end of two described safeguards is pin jointed end, the other end of two described safeguards is free end, the equal correspondence of described pin jointed end is hinged on the through hole both sides of top board, described free end is arc groove, and described two arc grooves cooperate the clamping face that forms circle.
Described strut bar is telescopic pipe.
The beneficial effect that the utility model compared with prior art has is: the utility model comprises derrick, electric block, water pipe hook chuck, well head water pipe chuck, derrick be fixed on well directly over, electric block is installed on the derrick, the suspension hook of the moving cucurbit of water pipe hook chuck electricity consumption connects, well head water pipe chuck is fixed on the well head, in the lifting process of pump line, utilize electric block to lift by crane, utilize the dop chucking pump line upper end of water pipe hook chuck, the pump line lower end tightens with the clamp of well head water pipe chuck, can dismantle the pump line attaching screw easily, and will go up a joint pump line and sling and remove, being arranged on safeguard on the top board in the utility model puts down and can prevent that pump line lost efficacy because clamp clamps and occur dropping in the well when unexpected, the height of strut bar can be regulated suitable height according to actual conditions, when lift pump and water pipe are installed and are keeped in repair, the workman only needs control button, just can finish the lifting to lift pump and pump line, move and wait action, alleviated working strength of workers, improved installation and maintenance speed, device security is reliable.
Description of drawings
Below in conjunction with accompanying drawing the utility model is described further.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of water pipe hook chuck in the utility model.
Fig. 3 is the birds-eye view of Fig. 2.
Fig. 4 is the cutaway view of Fig. 2 middle section A-A.
Fig. 5 is the structural representation of well head water pipe chuck in the utility model.
Fig. 6 removes birds-eye view behind the top board for Fig. 5.
Fig. 7 is the cutaway view of Fig. 5 middle section B-B.
Among the figure, 1 is side plate, 2 is brace panel, 3 is lower plate, 4 is first hydraulic ram, 5 is dop, 6 is the lower support cover, 7 is the upper support cover, 8 is upper plate, 9 is first bearing pin, 10 is deep floor, 11 is hanging axis, 12 is reinforcing sleeve, 13 is bench board, 14 is first clamping part, 15 is second clamping part, 16 is base plate, 17 is top board, 18 is strut bar, 19 is permanent seat, 20 is bracing frame, 21 is second hydraulic ram, 22 is adapter plate, 23 is clamping plate, 24 is clamp, 25 is stay bearing plate, 26 is second bearing pin, 27 is the 3rd bearing pin, 28 is safeguard, 29 is the 3rd bearing pin, 30 is the 4th bearing pin.
The specific embodiment
As Fig. 1-shown in Figure 7, a kind of deep well maintaining equipments driving of the utility model, comprise derrick, electric block, water pipe hook chuck, well head water pipe chuck, derrick be fixed on well directly over, electric block is installed on the derrick, the suspension hook of the moving cucurbit of water pipe hook chuck electricity consumption connects, well head water pipe chuck is fixed on the well head, the structure of water pipe hook chuck is: two side plates 1 and a lower plate 3 formation flute profile that is fixed together, the middle part of described lower plate 3 has the hole, relative fixed has two first hydraulic rams 4 on the lower plate 3, the rod end of two described first hydraulic rams 4 all fixedly has a dop 5, and described two dops 5 cooperate the clamping face that forms a circle; Hanging axis 11 is on the top of two side plates 1 and be fixed between two side plates 1;
Well head water pipe chuck comprises bench board 13, first clamping part 14 and second clamping part 15, the structure of bench board 13 is: comprise base plate 16, top board 17 and Duo Gen strut bar 18, base plate 16 and top board 17 be arranged in parallel, and the equal correspondence in the middle part of base plate 16 and top board 17 has through hole, many described strut bars 18 are symmetrical arranged and base plate 16 and top board 17 are linked into an integrated entity, and the through hole both sides of described base plate 16 all are arranged with two stay bearing plates 25 in parallel;
The structure of first clamping part 14 is: two clamping plate 23 be arranged in parallel and the middle part correspondence has long through-hole, the 3rd bearing pin 27 passes this long through-hole the piston rod of second hydraulic ram 21 and the middle part of two described clamping plate 23 is linked together, the cylinder body of second hydraulic ram 21 is fixed on the base plate 16 by bracing frame 20, the other end that one end of two described clamping plate 23 is provided with 24, two clamping plate 23 of clamp is hinged with described stay bearing plate 25 by the 4th bearing pin 30;
First clamping part 14 and second clamping part 15 are symmetricly set on the through hole both sides of described base plate 16, second clamping part 15 is identical with the structure of first clamping part 14, and two clamps 24 on second clamping part 15 and first clamping part 14 cooperate the clamping face that forms circle.
Fixedly there is the middle part to have the upper plate 8 in hole between described two side plates 1, upper plate 8 is positioned at lower plate 3 tops, two first bearing pins 9 are separately fixed between upper plate 8 and the lower plate 3, the cylinder ends of two described first hydraulic rams 4 is sleeved on corresponding first bearing pin 9, and the cylinder ends of first hydraulic ram 4 is provided with upper support cover 7 and lower support cover 6 up and down.
The outside at described two side plate 1 middle parts all vertically is provided with 10, two brace panels that take the shape of the letter U 2 of a plurality of deep floors and is stuck on two side plates 1, and two brace panels 2 are positioned at the both sides of described lower plate 3 centre holes and are connected with lower plate 3.
The inboard of described two side plates 1 all has horizontal guide groove, and the both sides of described two dops 5 are provided with guide protrusions, and the guide protrusions on the described dop 5 matches with guide groove on the side plate 1.
Be provided with a plurality of vertical grooves on the clamping face of described two dops 5.
Be set with two reinforcing sleeves 12 on the described hanging axis 11, and described two reinforcing sleeves 12 are separately fixed at the inboard of two side plates 1.
The two ends of support frame as described above 20 are symmetrically arranged with two permanent seats 19, two described permanent seats 19 cooperate formation U-shaped hold down groove with bracing frame 20, the cylinder body of second hydraulic ram 21 is arranged in this U-shaped hold down groove, and the both sides correspondence of adapter plate 22 is arranged on two described permanent seats 19 and with described second hydraulic ram 21 and fixes.
Support frame as described above 20 all is separately fixed on the corresponding stay bearing plate 25 by two second bearing pins 26.
Also be provided with two safeguards 28 that prevent that pump line from falling on the described top board 17, one end of two described safeguards 28 is pin jointed end, the other end of two described safeguards 28 is free end, the equal correspondence of described pin jointed end is hinged on the through hole both sides of top board 17, described free end is arc groove, and described two arc grooves cooperate the clamping face that forms circle.
Described strut bar 18 is telescopic pipe.
Working process of the present utility model is: at first, start hydraulic power unit, check that the compression indicator indicated pressure should be about 20MPa, then, manipulation well head water pipe chuck control cock makes the clamp 24 of well head water pipe chuck clamp pump lines.
Press driving button box decline button then, water pipe hook chuck descends, and in pump line inserted dop 5, dop 5 can make it stop to descend by the reliable grip pump line, and this process can be adjusted lowering position in conjunction with the driving walking, accomplishes not hang partially as far as possible.The clamping control cock of operation water pipe hook chuck makes dop 5 reliable grip pump lines.
Last crawl rising button makes that steel rope is stressed to get final product, the control cock of operation well head water pipe chuck, unclamp pump line, and make clamping plate 23 be flared to maximum position, press the rising button, the lifting pump line, general run of thins, bench board 13 table tops that make next pump line flange exceed well head water pipe chuck can stop lifting for about about one meter, the control cock that should in time operate well head water pipe chuck this moment makes the clamp 24 reliable grip pump lines on the clamping plate 23, to be released and take out flange after, will go up a joint pump line and sling and remove, and then next joint pump line is sling, dismantled.
Reversed in order during installation saves pump line with one and connects the back by hanging under the joint, until the deep well pump installation.
The performance perameter of a kind of deep well maintaining equipments driving of the utility model is as follows:
Captain: 5m;
Machine width: 3m;
Machine height: 6m;
Hoisting weight: 10T;
Lifting stroke: 4m;
Laterally effective miles of relative movement: 3m;
Power: 10KW;
Hydraulic pressure: 16MPa.
The utility model sling height is 4m, and laterally miles of relative movement is 3m, and flexible operation is convenient in installation and the maintenance of diverse location to lift pump and pump line.
Being arranged on safeguard 28 on the top board 17 in the utility model puts down and can prevent that pump line lost efficacy because clamp 24 clamps and occur dropping in the well when unexpected, the height of strut bar 18 can be regulated suitable height according to actual conditions, when lift pump and water pipe are installed and are keeped in repair, the workman only needs control button, just can finish the lifting to lift pump and water pipe, move and wait action, alleviated working strength of workers, improved installation and maintenance speed.
By reference to the accompanying drawings embodiment of the present utility model has been done detailed description above, but the utility model is not limited to above-described embodiment, in the ken that those of ordinary skills possess, can also under the prerequisite that does not break away from the utility model aim, make various variations.

Claims (10)

1. deep well maintaining equipments driving, comprise derrick, electric block, water pipe hook chuck, well head water pipe chuck, derrick be fixed on well directly over, electric block is installed on the derrick, the suspension hook of the moving cucurbit of water pipe hook chuck electricity consumption connects, well head water pipe chuck is fixed on the well head, it is characterized in that, the structure of water pipe hook chuck is: two side plates (1) and a lower plate (3) the formation flute profile that is fixed together, the middle part of described lower plate (3) has the hole, lower plate (3) is gone up relative fixed two first hydraulic rams (4), the rod end of two described first hydraulic rams (4) all fixedly has a dop (5), and described two dops (5) cooperate the clamping face that forms a circle; Hanging axis (11) is positioned at the top of two side plates (1) and is fixed between two side plates (1);
Well head water pipe chuck comprises bench board (13), first clamping part (14) and second clamping part (15), the structure of bench board (13) is: comprise base plate (16), top board (17) and many strut bars (18), base plate (16) and top board (17) be arranged in parallel, and the equal correspondence in middle part of base plate (16) and top board (17) has through hole, many described strut bars (18) are symmetrical arranged and base plate (16) and top board (17) are linked into an integrated entity, and the through hole both sides of described base plate (16) all are arranged with two stay bearing plates (25) in parallel;
The structure of first clamping part (14) is: two clamping plate (23) be arranged in parallel and the middle part correspondence has long through-hole, the 3rd bearing pin (27) passes this long through-hole the piston rod of second hydraulic ram (21) and the middle part of two described clamping plate (23) is linked together, the cylinder body of second hydraulic ram (21) is fixed on the base plate (16) by bracing frame (20), one end of two described clamping plate (23) is provided with clamp (24), and the other end of two clamping plate (23) is hinged by the 4th bearing pin (30) and described stay bearing plate (25);
First clamping part (14) and second clamping part (15) are symmetricly set on the through hole both sides of described base plate (16), second clamping part (15) is identical with the structure of first clamping part (14), and two clamps (24) on second clamping part (15) and first clamping part (14) cooperate the clamping face that forms circle.
2. a kind of deep well maintaining equipments driving according to claim 1, it is characterized in that: fixedly have the middle part to have the upper plate (8) in hole between described two side plates (1), upper plate (8) is positioned at lower plate (3) top, two first bearing pins (9) are separately fixed between upper plate (8) and the lower plate (3), the cylinder ends of two described first hydraulic rams (4) is sleeved on corresponding first bearing pin (9), and the cylinder ends of first hydraulic ram (4) is provided with upper support cover (7) and lower support cover (6) up and down.
3. a kind of deep well maintaining equipments driving according to claim 1 and 2, it is characterized in that: the outside at described two side plates (1) middle part all vertically is provided with a plurality of deep floors (10), two brace panels that take the shape of the letter U (2) are stuck on two side plates (1), and two brace panels (2) are positioned at the both sides of described lower plate (3) centre hole and are connected with lower plate (3).
4. a kind of deep well maintaining equipments driving according to claim 1 and 2, it is characterized in that: the inboard of described two side plates (1) all has horizontal guide groove, the both sides of described two dops (5) are provided with guide protrusions, and the guide protrusions on the described dop (5) matches with guide groove on the side plate (1).
5. a kind of deep well maintaining equipments driving according to claim 1 and 2 is characterized in that: be provided with a plurality of vertical grooves on the clamping face of described two dops (5).
6. a kind of deep well maintaining equipments driving according to claim 2 is characterized in that: be set with two reinforcing sleeves (12) on the described hanging axis (11), and described two reinforcing sleeves (12) are separately fixed at the inboard of two side plates (1).
7. a kind of deep well maintaining equipments driving according to claim 1, it is characterized in that, the two ends of support frame as described above (20) are symmetrically arranged with two permanent seats (19), two described permanent seats (19) cooperate formation U-shaped hold down groove with bracing frame (20), the cylinder body of second hydraulic ram (21) is arranged in this U-shaped hold down groove, and the both sides correspondence of adapter plate (22) is arranged on two described permanent seats (19) and goes up and described second hydraulic ram (21) is fixed.
8. a kind of deep well maintaining equipments driving according to claim 7 is characterized in that support frame as described above (20) all is separately fixed on the corresponding stay bearing plate (25) by two second bearing pins (26).
9. a kind of deep well maintaining equipments driving according to claim 8, it is characterized in that, also be provided with two safeguards (28) that prevent that pump line from falling on the described top board (17), one end of two described safeguards (28) is pin jointed end, the other end of two described safeguards (28) is free end, the equal correspondence of described pin jointed end is hinged on the through hole both sides of top board (17), and described free end is arc groove, and described two arc grooves cooperate the clamping face that forms circle.
10. a kind of deep well maintaining equipments driving according to claim 9 is characterized in that described strut bar (18) is telescopic pipe.
CN 201320031699 2013-01-22 2013-01-22 Installing and maintaining crane for deep well device Withdrawn - After Issue CN203033682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320031699 CN203033682U (en) 2013-01-22 2013-01-22 Installing and maintaining crane for deep well device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320031699 CN203033682U (en) 2013-01-22 2013-01-22 Installing and maintaining crane for deep well device

Publications (1)

Publication Number Publication Date
CN203033682U true CN203033682U (en) 2013-07-03

Family

ID=48685819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320031699 Withdrawn - After Issue CN203033682U (en) 2013-01-22 2013-01-22 Installing and maintaining crane for deep well device

Country Status (1)

Country Link
CN (1) CN203033682U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103101842A (en) * 2013-01-22 2013-05-15 山西东华机械有限公司 Deep well equipment installation and maintenance travelling crane

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103101842A (en) * 2013-01-22 2013-05-15 山西东华机械有限公司 Deep well equipment installation and maintenance travelling crane
CN103101842B (en) * 2013-01-22 2015-02-25 山西东华机械有限公司 Deep well equipment installation and maintenance travelling crane

Similar Documents

Publication Publication Date Title
CN210528272U (en) Hoisting equipment for prefabricated parts
CN202785364U (en) Movable dual-door-type mast hoisting device
CN205442405U (en) Anchor clamps play to put in a position
CN202594610U (en) I-shaped beam hoisting device for hoisting of pressure steel pipe tiles
CN103101842B (en) Deep well equipment installation and maintenance travelling crane
CN203033682U (en) Installing and maintaining crane for deep well device
CN201436274U (en) Special assembling suspender of long chain for slab rolling mill engineering steel plate conveying device
CN201234071Y (en) Knife switch inspection rack
CN205906926U (en) Special stone tongs of precious stones
CN205600242U (en) Mine equipment liquid press wheel dismouting maintenance device
CN210393441U (en) Lifting appliance for crane
CN202279623U (en) Hoisting tool of bent concrete precast slab
CN204958222U (en) Mechanical equipment hoists frame
CN201151607Y (en) Clamper for handling shell ring structural member
CN203031227U (en) Wellhead water pipe chuck
CN206447479U (en) A kind of Portable Automatic hot finished steel pipe suspender
CN202467697U (en) Casing stabbing board
CN201459602U (en) Equipment for bridge construction
CN202880679U (en) Water pipe hook chuck
CN205662284U (en) Two poles become platform ground jack
CN207846226U (en) Pavement angle bar frame mounting device
CN207934464U (en) Prestressed strand stretching bed
CN103100838B (en) Well head water pipe chuck
CN212343151U (en) Distribution transformer hangs core and overhauls specialized tool
CN213015461U (en) Assembled prefabricated component hoist and mount carrying device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130703

Effective date of abandoning: 20150225

RGAV Abandon patent right to avoid regrant