CN203021921U - Split-mounting-type hanger system - Google Patents

Split-mounting-type hanger system Download PDF

Info

Publication number
CN203021921U
CN203021921U CN2012205471943U CN201220547194U CN203021921U CN 203021921 U CN203021921 U CN 203021921U CN 2012205471943 U CN2012205471943 U CN 2012205471943U CN 201220547194 U CN201220547194 U CN 201220547194U CN 203021921 U CN203021921 U CN 203021921U
Authority
CN
China
Prior art keywords
upper hanger
fixedly connected
rack system
pin
hanging rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012205471943U
Other languages
Chinese (zh)
Inventor
屈建明
高雄
李拔周
张栋林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority to CN2012205471943U priority Critical patent/CN203021921U/en
Application granted granted Critical
Publication of CN203021921U publication Critical patent/CN203021921U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a split-mounting-type hanger system which comprises an upper hanger, a load-bearing frame, a lower hanger, and a distribution beam auxiliary and pattern plate part. The split mounting type hanger system is characterized in that the distribution beam auxiliary and pattern plate part is fixedly connected on the side face of the upper hanger, the upper hanger is fixedly connected with the load-bearing frame which is connected on a poured concrete wall through an anchoring structure, the load-bearing frame is in detachable connection with the anchoring structure, and the load-bearing frame is in rolling connection with the lower hanger. According to the split-mounting-type hanger system, due to the design of detachable connection of the load-bearing frame and the anchoring structure, the connection between the load-bearing frame and the anchoring structure can be dismantled after first stage construction is completed, the split-mounting-type hanger system can be hoisted to another stage for construction and can be repeatedly recycled, the time of secondary assembly is saved, using is convenient and fast, applicability is strong, and recycling usage cost can be lowered.

Description

The pin-connected panel hanging rack system
Technical field
The utility model relates to Bridge High-pier high tower construction facility technology field, refers to particularly it is a kind of pin-connected panel hanging rack system.
Background technology
High pier shaft and high tower pile are as the feature of modern bridge indispensability, and high pier or high tower can help bridge to cross over the abominable area such as river, mountain valley, depression, when the high pier of existing construction or high tower, basic skills has two kinds: the first is to turn over modulus method, do exactly three joint template over-form constructions, be with little operation platform on template, the method is because operation platform is too little, operating difficulties, when template was turned over mould, difficulty of construction strengthened, and because needs are done three joint templates, high material consumption, cost is high; The second is exactly the surrounding scaffolding, sets up whole scaffolds in surrounding exactly, and as operation platform, the method construction is loaded down with trivial details, must set up scaffold at every turn, and scaffolding used is many, and the cost cost is higher.
The utility model content
The purpose of this utility model is exactly to provide a kind of simple in structure according to the deficiency of above-mentioned background technology, and cost is low, and applicability is strong, and can have enough to meet the need the pin-connected panel hanging rack system of use, in order to the defective of construct high pier or high tower prior art scheme.
The technical solution of the utility model is: a kind of pin-connected panel hanging rack system, comprise upper hanger, bearing frame, lower suspension bracket, distribute the attached and template part of fine strain of millet, it is characterized in that: the attached and template part of described distribution fine strain of millet is fixedly connected on the side of upper hanger, described upper hanger is fixedly connected with bearing frame, described bearing frame is connected on the concrete wall of having built by anchor structure, bearing frame and anchor structure removably connect, and bearing frame is fixedly connected with lower suspension bracket.
Attached and the template part of described distribution fine strain of millet comprises that first distributes fine strain of millet, hanging rack system horse and template, first distributes fine strain of millet interlock and be fixedly connected with the hanging rack system horse, distribute fine strain of millet and hanging rack system horse upper end laying the first wooden springboard first, the first wooden springboard and first distributes fine strain of millet to be fixedly connected with, edge at the first wooden springboard is provided with fence, template-setup is on the first wooden springboard, and template is connected to the side of upper hanger by enclosing purlin card and adjuster.
Described upper hanger comprises upper hanger standard knot, upper hanger base section and regulates strut, the top of described upper hanger standard knot is provided with hanger, the bottom of upper hanger standard knot is fixedly connected with by the top of bearing pin with the upper hanger base section, the bottom of upper hanger base section by bearing pin with regulate strut and be connected; Described adjusting strut is made of the sleeve that is threaded connection and screw rod; Connect by the second distribution beam between described upper hanger, be equipped with the second wooden springboard on the second distribution beam.
Described bearing frame comprises load-bearing tripod and mobile device, the connection of being connected with mobile device of described load-bearing tripod.
Described load-bearing tripod comprises spandrel girder, montant and the diagonal brace that is fixedly connected with, and the lower end of montant is fixed with lower spike, and lower spike is shored on the concrete wall of having built.
The end of described spandrel girder is provided with stiffener, and stiffener is fixedly connected on montant.
Described mobile device comprises that the lower surface is provided with the trave lling girder of tooth bar and the transmitting gear that cooperatively interacts with tooth bar, also be provided with shifting roller on described trave lling girder, shifting roller rolls with spandrel girder and is connected, transmitting gear and tooth bar cooperatively interact, the mobile power that provides before and after trave lling girder is on spandrel girder is provided, trave lling girder can move left and right on spandrel girder by driving shifting roller subsequently; The upper surface of described trave lling girder is provided with the fixed bearing that is connected for upper hanger; The rear and front end of described trave lling girder is provided be used to the positioning roller that prevents the trave lling girder rolling.
Described lower suspension bracket comprises platform suspension rod, platform crossbeam and the suspension rod that is fixedly connected with, and described platform crossbeam is provided with the 3rd distribution beam, is equipped with the 3rd wooden springboard on the 3rd distribution beam.
Described platform suspension rod laterally is provided with the platform spike, and the platform spike is shored on the concrete wall of having built.
Described anchor structure comprises anchor block, described anchor block is fixedly connected on the concrete wall of having built by embedded fixing component, be hingedly connected with the anchor pole that is connected with upper hanger on anchor block, described embedded fixing component is embedded in the concrete wall of having built, embedded fixing component comprises embedded part plate and the anchor cone that connects by finish rolling deformed bar, and anchor block is fixedly connected on the concrete wall of having built by the bolt that cooperatively interacts with anchor cone.
During installation, first anchor structure is anchored in the concrete wall of having built in advance, again the bearing frame that assembles and lower hanger are hung on anchor structure, insert the safe bearing pin that prevents from proposing on hanger the position on anchor structure and bearing frame fixed position, lift subsequently upper hanger, and upper hanger is fixedly connected with fixed bearing on bearing frame, will distribute subsequently the attached and template part of fine strain of millet to lift to the upper hanger side and fixed with upper hanger, namely completed the assembling of pin-connected panel hanging rack system; After construction is completed, bearing frame is separated with anchor structure, the whole hanger that passes through on the lifting upper hanger lifts to another anchor structure, can carry out the construction of next stage.
Upper hanger in the utility model, bearing frame, lower suspension bracket, anchor structure, distribution fine strain of millet is attached and template is assembled by bearing pin or bolt in factory in advance by independent scattered member, easy assembly and disassembly, and the multiplex hollow channel-section steel of each member or square steel are made, intensity is large, rigidity is large, and is lightweight, saves steel, reduce costs, lifting and transportation are all convenient.The design that the utility model removably connects due to bearing frame and anchor structure, can make the utility model after the one-phase construction is complete, remove the connection between bearing frame and anchor structure, the utility model lifting to another stage is constructed, can repeat turnover and use, save the time of assembling again, convenient to use, applicability is strong, and can reduce the turnover use cost.
Description of drawings
Fig. 1 the utility model overall structure elevational schematic view;
Distribute the attached and template part structure schematic top plan view of fine strain of millet in Fig. 2 the utility model;
Distribute attached and formwork structure master template part of fine strain of millet to look schematic diagram in Fig. 3 the utility model;
Upper hanger structural representation in Fig. 4 the utility model;
Bearing frame structural representation in Fig. 5 the utility model;
Lower hanger structure schematic diagram in Fig. 6 the utility model;
The schematic diagram of lower anchor structure in Fig. 7 the utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments, is convenient to be well understood to the utility model, but they do not consist of restriction to the utility model.
As shown in Figure 1, a kind of pin-connected panel hanging rack system, comprise upper hanger 1, bearing frame 2, lower suspension bracket 3, distribute the attached and template part 4 of fine strain of millet, anchor structure 5, distribute the attached and template part 4 of fine strain of millet to be fixedly connected on the side of upper hanger 1, upper hanger 1 is fixedly connected with bearing frame 2, and bearing frame 2 is connected to by anchor structure 5 on the concrete wall of having built, and bearing frame 2 removably connects with anchor structure 5, bearing frame 2 is fixedly connected with by bearing pin with lower suspension bracket 3, is specially:
as Fig. 2, shown in Figure 3, distribute the attached and template part 4 of fine strain of millet to comprise that first distributes fine strain of millet 4.1, hanging rack system horse 4.2 and template 4.3, first distributes fine strain of millet 4.1 and hanging rack system horse 4.2 interlock and are bolted to connection, distribute fine strain of millet 4.1 and hanging rack system horse 4.2 upper ends laying the first wooden springboards 4.4 first, the first wooden springboard 4.4 is operation platform, the first wooden springboard 4.4 and first distributes fine strain of millet 4.1 to be bolted to connection, be provided with fence 4.5 at the edge of the first wooden springboard 4.4, fence 4.5 forms by scaffold tubes transformation, play safety protection function, template 4.3 is arranged on the first wooden springboard 4.4, template 4.3 is connected to the side of upper hanger 1 by enclosing purlin card 4.6 and adjuster 4.7.
As shown in Figure 4, upper hanger 1 comprises upper hanger standard knot 1.1, upper hanger base section 1.2 and regulates strut 1.3, upper hanger standard knot 1.1 and hanger base section 1.2 is channel-section steel and square steel is welded, the top of upper hanger standard knot 1.1 is provided with hanger 1.4, hanger 1.4 is the suspension centres when carrying out lifting operation, the bottom of upper hanger standard knot 1.1 is fixedly connected with by the top of bearing pin with upper hanger base section 1.2, the bottom of upper hanger base section 1.2 by bearing pin with regulate strut 1.3 and be connected; Regulate strut 1.3 and consisted of by the sleeve that is threaded connection and screw rod, can regulate the length of regulating strut 1.3; Connect by the second distribution beam between upper hanger 1, be equipped with the second wooden springboard on the second distribution beam, the second wooden springboard can be used as operation platform (in figure, the second distribution beam and the second wooden springboard do not mark).Distribute the template 4.3 in the attached and template part 4 of fine strain of millet to be fixedly connected on the vertical plane of upper hanger standard knot 1.1 and upper hanger base section 1.2.
As shown in Figure 5, bearing frame 2 comprises load-bearing tripod 2.1 and mobile device 2.2, load-bearing tripod 2.1 is connected with mobile device and roll is connected, wherein, load-bearing tripod 2.2 comprises spandrel girder 2.3, montant 2.4 and the diagonal brace 2.5 that is fixedly connected with, and spandrel girder 2.3, montant 2.4 and diagonal brace 2.5 are square steel and are welded; The lower end of montant 2.4 is fixed with lower spike 2.6, and lower spike 2.6 is shored on the concrete wall of having built, and can be bearing frame 2 counter-force is provided, and keeps integrally-built steadiness; Stressed maximum due to spandrel girder 2.3 is provided with stiffener 2.7 in the end of spandrel girder 2.3, and stiffener 2.7 is fixedly welded on montant 2.4; Mobile device 2.2 comprises that the lower surface is provided with the trave lling girder 2.8 of tooth bar 2.10 and the transmitting gear 2.9 that cooperatively interacts with tooth bar 2.10, distance moving beam 2.8 10cm places, two ends also are provided with shifting roller 2.11 on trave lling girder 2.8, shifting roller 2.11 rolls with spandrel girder 2.3 and is connected, principle is that transmitting gear 2.9 and tooth bar 2.10 cooperatively interact, the mobile power that provides before and after trave lling girder 2.8 is on spandrel girder 2.3 is provided, trave lling girder 2.8 can move left and right on spandrel girder 2.3 by driving shifting roller 2.11 subsequently; The upper surface of trave lling girder 2.8 is provided with two and is used for the fixed bearing 2.12 be connected with upper hanger 1, fixed bearing 2.12 respectively with the upper hanger base section 1.2 of upper hanger 1 be connected strut 1.3 and be connected; The rear and front end of trave lling girder 2.8 is provided be used to the positioning roller 2.13 that prevents trave lling girder 2.8 rollings.
As shown in Figure 6, lower suspension bracket 3 comprises platform suspension rod 6.1, platform crossbeam 6.2 and the suspension rod 6.3 that is fixedly connected with, and wherein platform suspension rod 6.1, platform crossbeam 6.2 are for square steel is welded, and suspension rod 6.3 forms for steel-pipe welding; Platform crossbeam 6.2 is provided with the 3rd distribution beam, is equipped with the 3rd wooden springboard on the 3rd distribution beam, and the 3rd wooden springboard is operation platform (not marking in the 3rd distribution beam and the 3rd wooden springboard figure); Platform suspension rod 6.1 laterally is provided with a platform spike 6.4, and when platform suspension rod 6.1 bearing load, platform spike 6.4 is shored on the concrete wall of having built.
As shown in Figure 7, anchor structure 7 comprises anchor block 7.1, on the concrete wall that anchor block 7.1 is fixedly connected on to build by embedded fixing component, is hingedly connected with the anchor pole 7.2 that is connected with upper hanger on anchor block 7.1, and embedded fixing component is embedded in the concrete wall of having built; Embedded fixing component comprises embedded part plate 7.4 and the anchor cone 7.5 that connects by finish rolling deformed bar 7.3, and anchor block 7.1 is fixedly connected on the concrete wall of having built by the bolt 7.6 that cooperatively interacts with anchor cone 7.5.
The utility model when mounted, first anchor structure 5 is anchored in the concrete wall of having built in advance, again the bearing frame 2 that assembles and lower hanger 3 are hung on anchor structure 5, insert the safe bearing pin that prevents from proposing on hanger the position on anchor structure 5 and bearing frame 3 fixed position, lift subsequently upper hanger 1, and upper hanger 1 is fixedly connected with fixed bearing 2.12 on bearing frame 2, to distribute subsequently the attached and template part 4 of fine strain of millet to lift to upper hanger 1 side and fixed with upper hanger 1, namely complete the assembling of pin-connected panel hanging rack system; After construction is completed, bearing frame is separated with anchor structure, the whole hanger that passes through on the lifting upper hanger lifts to another anchor structure, can carry out the construction of next stage.
The utility model is than existing high pier or high tower construction system, wherein each member assembled by bearing pin or bolt in factory in advance by independent scattered member, easy assembly and disassembly, and the multiplex hollow channel-section steel of each member or square steel are made, and intensity is large, and rigidity is large, lightweight, save steel, reduce costs, lifting and transportation are all convenient.
The design that the utility model removably connects due to bearing frame and anchor structure, can make the utility model after the one-phase construction is complete, remove the connection between bearing frame and anchor structure, the utility model lifting to another stage is constructed, can repeat turnover and use, save the time of assembling again, convenient to use, applicability is strong, and can reduce the turnover use cost.

Claims (10)

1. pin-connected panel hanging rack system, comprise upper hanger (1), bearing frame (2), lower suspension bracket (3), distribute the attached and template part (4) of fine strain of millet, it is characterized in that: the attached and template part (4) of described distribution fine strain of millet is fixedly connected on the side of upper hanger (1), described upper hanger (1) is fixedly connected with bearing frame (2), described bearing frame (2) is connected on the concrete wall of having built by anchor structure (5), bearing frame (2) removably connects with anchor structure (5), and bearing frame (2) is fixedly connected with lower suspension bracket (3).
2. the pin-connected panel hanging rack system shown according to claim 1, it is characterized in that: the attached and template (4) of described distribution fine strain of millet part comprises that first distributes fine strain of millet (4.1), hanging rack system horse (4.2) and template (4.3), first distributes fine strain of millet (4.1) interlock and be fixedly connected with hanging rack system horse (4.2), distribute fine strain of millet (4.1) and hanging rack system horse (4.2) upper end laying the first wooden springboard (4.4) first, the first wooden springboard (4.4) and first distributes fine strain of millet (4.1) to be fixedly connected with, be provided with fence (4.5) at the edge of the first wooden springboard (4.4), template (4.3) is arranged on the first wooden springboard (4.4), template (4.3) is connected to the side of upper hanger (1) by enclosing purlin card (4.6) and adjuster (4.7).
3. the pin-connected panel hanging rack system shown according to claim 1, it is characterized in that: described upper hanger (1) comprises upper hanger standard knot (1.1), upper hanger base section (1.2) and regulates strut (1.3), the top of described upper hanger standard knot (1.1) is provided with hanger (1.4), the bottom of upper hanger standard knot (1.1) is fixedly connected with by the top of bearing pin with upper hanger base section (1.2), the bottom of upper hanger base section (1.2) by bearing pin with regulate strut (1.3) and be connected; Described adjusting strut (1.3) is made of the sleeve that is threaded connection and screw rod; Connect by the second distribution beam between described upper hanger (1), be equipped with the second wooden springboard on the second distribution beam.
4. the pin-connected panel hanging rack system shown according to claim 1, it is characterized in that: described bearing frame (2) comprises load-bearing tripod (2.1) and mobile device (2.2), and described load-bearing tripod (2.1) is connected 2.2 with mobile device) rolling connects.
5. the pin-connected panel hanging rack system shown according to claim 4, it is characterized in that: described load-bearing tripod (2.1) comprises spandrel girder (2.3), montant (2.4) and the diagonal brace (2.5) that is fixedly connected with, the lower end of montant (2.4) is fixed with lower spike (2.6), and lower spike (2.6) is shored on the concrete wall of having built.
6. the pin-connected panel hanging rack system shown according to claim 5, it is characterized in that: the end of described spandrel girder (2.3) is provided with stiffener (2.7), and stiffener (2.7) is fixedly connected on montant (2.4).
7. the pin-connected panel hanging rack system shown according to claim 4, it is characterized in that: described mobile device (2.2) comprises the transmitting gear (2.9) that the lower surface is provided with the trave lling girder of tooth bar (2.10) (2.8) and cooperatively interacts with tooth bar (2.10), also be provided with shifting roller (2.11) on described trave lling girder (2.8), shifting roller (2.11) rolls with spandrel girder (2.3) and is connected; The upper surface of described trave lling girder (2.8) is provided with the fixed bearing (2.12) that is connected for upper hanger (1); The rear and front end of described trave lling girder (2.8) is provided be used to the positioning roller (2.13) that prevents trave lling girder (2.8) rolling.
8. the pin-connected panel hanging rack system shown according to claim 1, it is characterized in that: described lower suspension bracket (3) comprises platform suspension rod (6.1), platform crossbeam (6.2) and the suspension rod (6.3) that is fixedly connected with, described platform crossbeam (6.2) is provided with the 3rd distribution beam, is equipped with the 3rd wooden springboard on the 3rd distribution beam.
9. the pin-connected panel hanging rack system shown according to claim 8, it is characterized in that: described platform suspension rod (6.1) laterally is provided with platform spike (6.4), and platform spike (6.4) is shored on the concrete wall of having built.
10. the pin-connected panel hanging rack system shown according to claim 1, it is characterized in that: described anchor structure (7) comprises anchor block (7.1), described anchor block (7.1) is fixedly connected on the concrete wall of having built by embedded fixing component, be hingedly connected with the anchor pole (7.2) that is connected with upper hanger (1) on anchor block (7.1), shown embedded fixing component is embedded in the concrete wall of having built, embedded fixing component comprises embedded part plate (7.4) and the anchor cone (7.5) that connects by finish rolling deformed bar (7.3), anchor block (7.1) is fixedly connected on the concrete wall of having built by the bolt (7.6) that cooperatively interacts with anchor cone (7.5).
CN2012205471943U 2012-10-24 2012-10-24 Split-mounting-type hanger system Expired - Fee Related CN203021921U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012205471943U CN203021921U (en) 2012-10-24 2012-10-24 Split-mounting-type hanger system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012205471943U CN203021921U (en) 2012-10-24 2012-10-24 Split-mounting-type hanger system

Publications (1)

Publication Number Publication Date
CN203021921U true CN203021921U (en) 2013-06-26

Family

ID=48645915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012205471943U Expired - Fee Related CN203021921U (en) 2012-10-24 2012-10-24 Split-mounting-type hanger system

Country Status (1)

Country Link
CN (1) CN203021921U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104562938A (en) * 2014-12-16 2015-04-29 贵州科润华机电设备有限公司 Bridge climbing turnover formwork and hanging basket integrated device
CN107642048A (en) * 2017-09-22 2018-01-30 宁夏桥多美路桥钢模板科技有限公司 Pier stud high-altitude construction platform and high-altitude construction method
CN112627484A (en) * 2020-12-08 2021-04-09 中国核工业第二二建设有限公司 Two-point type triangular hanging rack platform and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104562938A (en) * 2014-12-16 2015-04-29 贵州科润华机电设备有限公司 Bridge climbing turnover formwork and hanging basket integrated device
CN107642048A (en) * 2017-09-22 2018-01-30 宁夏桥多美路桥钢模板科技有限公司 Pier stud high-altitude construction platform and high-altitude construction method
CN112627484A (en) * 2020-12-08 2021-04-09 中国核工业第二二建设有限公司 Two-point type triangular hanging rack platform and construction method

Similar Documents

Publication Publication Date Title
CN101672102B (en) Steel structural overhead ceiling construction platform
CN104631343B (en) From traveling rhombus keying cradle in truss type structure and suspended basket and construction method
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN106894326A (en) The construction method of assembled pretensioned prestressing corrugated steel web plate composite box girder
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN202247713U (en) Combined protective shed frame
CN203021921U (en) Split-mounting-type hanger system
CN203223003U (en) Detachable triangular jig frame for steel truss assembling
CN110409318B (en) Assembling and erecting method for large-span simply-supported steel-concrete composite beam
CN211498526U (en) Self-lifting type corrugated steel web cast-in-situ box girder hanging basket
CN201665822U (en) Novel bridge girder erection machine
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN100497834C (en) Construction equipment for integral roof-holding highway bridge top structure
CN216512520U (en) Lifting system suitable for small space
CN202689489U (en) Frame column construction operation frame
CN107237515A (en) The support meanss and its application method of circular steel truss structure
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN202185973U (en) Device for assisting dismounting and installing T beam formwork
CN103711112B (en) Build large-span concrete beam combined type Bailey bracket bearing bent frame
CN202611250U (en) Concreting platform for concrete filled steel tube column
CN204551271U (en) A kind of reinforcement type Hanging Basket
CN206800201U (en) The compound Hanging basket on front support of single cable plane
CN206233119U (en) The cradle structure of antidumping

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626

Termination date: 20201024

CF01 Termination of patent right due to non-payment of annual fee