CN202952242U - Air tube flange processing platform - Google Patents

Air tube flange processing platform Download PDF

Info

Publication number
CN202952242U
CN202952242U CN 201220694587 CN201220694587U CN202952242U CN 202952242 U CN202952242 U CN 202952242U CN 201220694587 CN201220694587 CN 201220694587 CN 201220694587 U CN201220694587 U CN 201220694587U CN 202952242 U CN202952242 U CN 202952242U
Authority
CN
China
Prior art keywords
processing platform
flange processing
bar
air hose
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220694587
Other languages
Chinese (zh)
Inventor
于庆龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN 201220694587 priority Critical patent/CN202952242U/en
Application granted granted Critical
Publication of CN202952242U publication Critical patent/CN202952242U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an air tube flange processing platform comprising a telescopic flange support table and telescopic support legs fixed beneath the support table. Road wheels are arranged beneath the support legs. The length, the width and the height of the air tube flange processing platform can be adjusted, processing of flanges of different sizes can be met, and the processing platform can be adjusted according to different processing tools and operation habits of workers. By utilizing the air tube flange processing platform, only one operator is needed to complete the entire processing procedure of flange processing, the road wheels are additionally arranged beneath the support table to facilitate turnaround in a workshop, the processing time is greatly saved, and the production efficiency is improved.

Description

A kind of air hose flange processing platform
Technical field
The utility model relates to airduct processing manufacture field, is specifically related to a kind of air hose flange processing platform.
Background technology
Airduct is exactly the pipe-line system of for air, carrying and distributing, and by a plurality of assemblies, is formed by connecting, and the connected mode between assembly adopts flange to connect more, so the processing of flange is very important part while making airduct.The processing of flange comprises the operations such as the welding, boring, paint of cutting, the flange of steel.At first steel are cut by size, then placed one flat plate as workbench, carried out the operation of welded flange frame above the steel of well cutting are placed on, finally holed on bench drill.In boring procedure, generally need two staff holding up flange, staff's operating desk creeps into row boring.The action need of above-mentioned processing flange three staff coordinate just and can complete, inefficiency, and lack safeguard measure and bring huge hidden danger to staff's personal safety.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of air hose flange processing platform, and the range of work is wide, and mode is flexible, has greatly improved operating efficiency
The utility model is achieved through the following technical solutions:
A kind of air hose flange processing platform comprises telescopic flange brace table and is fixed in the telescopic supporting leg under described brace table that described supporting leg has road wheel.
The further improvement project of the utility model is, the rectangle framework that the L shaped support bar that described brace table is four same specifications is spliced into, and the splicing place cover of described support bar has adjusting rod.
The utility model further improvement project is, the bar shaped spacing hole that the side at described support bar two ends is provided with cooperatively interacts respectively at two bar shaped spacing holes that are provided with described adjusting rod, with bolt through connecting.
The utility model further improvement project is that the interior corner of described L shaped support bar is welded with spacing angle bar.
The utility model further improvement project is that described spacing angle bar exceeds the table top of described brace table.
The utility model further improvement project is to be provided with continuously arranged protection hole above described support bar.
The utility model further improvement project is, described supporting leg comprises that bottom is provided with the upper support leg of bar shaped spacing hole and the lower support leg that top is provided with the bar shaped spacing hole, and described upper support leg inserts the lower support leg and is connected and fixed through described bar shaped spacing hole with bolt.
The utility model compared with prior art has the following advantages:
Length of the present utility model, width, height can be regulated, can meet the processing of different size flange, can to processing platform, be regulated according to difference and the operating habit of machining tool equally, the utility model only needs operating personnel just can complete the whole manufacturing procedure of flange processing, add the road wheel that brace table has, conveniently in workshop, had enough to meet the need, greatly saved process time, improved production efficiency.
The accompanying drawing explanation
Fig. 1 is the utility model schematic top plan view.
Fig. 2 is the utility model front elevational schematic.
The specific embodiment
As shown in Figure 1, 2, a kind of air hose flange processing platform comprises telescopic flange brace table 1 and is fixed in the telescopic supporting leg 2 under described brace table 1 that described supporting leg 2 has road wheel 3.
Still as shown in Figure 1, 2, the rectangle framework that the L shaped support bar 11 that described brace table 1 is four same specifications is spliced into, the splicing place cover of support bar 11 has adjusting rod 12, the bar shaped spacing hole 6 that the side at support bar 11 two ends is provided with cooperatively interacts respectively at two bar shaped spacing holes 6 that are provided with described adjusting rod 12, with bolt 4 through fixing.The interior corner of described L shaped support bar 11 is welded with the spacing angle bar 13 that exceeds brace table 1 table top, and during operation, flange assembly, near spacing angle bar 13, prevents mobile.Be provided with continuously arranged protection hole 14 above support bar 11, when boring flange hole, drill bit can not cause damage to the table top of brace table 1 like this.
As shown in Figure 2, described supporting leg 2 comprises that bottom is provided with the upper support leg 21 of bar shaped spacing hole 6 and the lower support leg 22 that top is provided with bar shaped spacing hole 6, and upper support leg 21 inserts two groups of bolts of lower support leg 22 use 5 and is connected and fixed through described bar shaped spacing hole 6.Support bar 11 in the present embodiment, adjusting rod 12, supporting leg 2 all adopt angle steel.

Claims (7)

1. an air hose flange processing platform, it is characterized in that: comprise telescopic flange brace table (1) and be fixed in the telescopic supporting leg (2) under described brace table (1), described supporting leg (2) has road wheel (3).
2. a kind of air hose flange processing platform as claimed in claim 1 is characterized in that: the rectangle framework that the L shaped support bar (11) that described brace table (1) is four same specifications is spliced into, the splicing place cover of described support bar (11) has adjusting rod (12).
3. a kind of air hose flange processing platform as claimed in claim 2, it is characterized in that: the bar shaped spacing hole (6) that the side at described support bar (11) two ends is provided with cooperatively interacts respectively at two the bar shaped spacing holes (6) that are provided with described adjusting rod (12), with bolt (4) through fixing.
4. a kind of air hose flange processing platform as claimed in claim 2, it is characterized in that: the interior corner of described L shaped support bar (11) is welded with spacing angle bar (13).
5. a kind of air hose flange processing platform as claimed in claim 4, it is characterized in that: described spacing angle bar (13) exceeds the table top of described brace table (1).
6. a kind of air hose flange processing platform as claimed in claim 2, is characterized in that: be provided with continuously arranged protection hole (14) above described support bar (11).
7. a kind of air hose flange processing platform as claimed in claim 1, it is characterized in that: described supporting leg (2) comprises that bottom is provided with the upper support leg (21) of bar shaped spacing hole (6) and the lower support leg (22) that top is provided with bar shaped spacing hole (6), and described upper support leg (21) inserts lower support leg (22) and is connected and fixed through described bar shaped spacing hole (6) with bolt (5).
CN 201220694587 2012-12-17 2012-12-17 Air tube flange processing platform Expired - Fee Related CN202952242U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220694587 CN202952242U (en) 2012-12-17 2012-12-17 Air tube flange processing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220694587 CN202952242U (en) 2012-12-17 2012-12-17 Air tube flange processing platform

Publications (1)

Publication Number Publication Date
CN202952242U true CN202952242U (en) 2013-05-29

Family

ID=48457835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220694587 Expired - Fee Related CN202952242U (en) 2012-12-17 2012-12-17 Air tube flange processing platform

Country Status (1)

Country Link
CN (1) CN202952242U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104128820A (en) * 2013-11-18 2014-11-05 成都科创佳思科技有限公司 Fixture assisting in machining of automobile parts
CN105149489A (en) * 2015-10-22 2015-12-16 中航卓越锻造(无锡)有限公司 Retractable workbench for pressing machine
CN105186385A (en) * 2015-07-14 2015-12-23 国网山东省电力公司经济技术研究院 Intelligent cabling trolley
CN110919622A (en) * 2019-12-03 2020-03-27 深圳市微语信息技术开发有限公司 Transportation device mounted on bionic robot and convenient to mount and capable of preventing collision
CN113635255A (en) * 2021-08-16 2021-11-12 安徽欣叶安康门窗幕墙股份有限公司 Movable door and window assembly tool with telescopic movable arm

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104128820A (en) * 2013-11-18 2014-11-05 成都科创佳思科技有限公司 Fixture assisting in machining of automobile parts
CN105186385A (en) * 2015-07-14 2015-12-23 国网山东省电力公司经济技术研究院 Intelligent cabling trolley
CN105186385B (en) * 2015-07-14 2017-07-04 国网山东省电力公司经济技术研究院 Intelligent cable lays dolly
CN105149489A (en) * 2015-10-22 2015-12-16 中航卓越锻造(无锡)有限公司 Retractable workbench for pressing machine
CN110919622A (en) * 2019-12-03 2020-03-27 深圳市微语信息技术开发有限公司 Transportation device mounted on bionic robot and convenient to mount and capable of preventing collision
CN110919622B (en) * 2019-12-03 2021-06-18 宁波曼汶智能装备有限公司 Transportation method of transportation device installed on bionic robot
CN113635255A (en) * 2021-08-16 2021-11-12 安徽欣叶安康门窗幕墙股份有限公司 Movable door and window assembly tool with telescopic movable arm

Similar Documents

Publication Publication Date Title
CN202952242U (en) Air tube flange processing platform
CN205274173U (en) Detachable slide adjusting placing of material bracket
CN202702225U (en) Mould storage rack
CN205552682U (en) Quick automatic punching apparatus on foam spare
CN202447848U (en) Auxiliary device for welding of vehicle frame
CN202924576U (en) Lifting tool for totally enclosed bus conductor
CN203726059U (en) Cantilever crane welding tool
CN203843411U (en) Production mold for instrument pillars
CN210360025U (en) Steel pipe pole welding frock suitable for not unidimensional steel pipe
CN209758320U (en) Tooling trolley and assembly line
CN203474367U (en) Movable triangular jacking tool
CN104209686B (en) Tank support leg welding positioning device
CN102922241B (en) Rotary table lightering method for ocean engineering crane
CN203875528U (en) L-shaped supporting frame
CN202200440U (en) Overturning tool for tapered mould
CN214323265U (en) Simple and practical tool platform
CN204623505U (en) A kind of pellet type gas cylinder conveying vehicle
CN204035897U (en) Tank body leg apparatus for welding and positioning
CN204353663U (en) A kind ofly assist the tooling platform be welded for passenger vehicle gusset
CN202213926U (en) Tool car for product debugging
CN205927334U (en) Cutting and fixing device and cutting system thereof
CN211663306U (en) Intelligent manufacturing workshop transportation device
CN203867189U (en) Supporting device and concrete pump truck
CN204976020U (en) Portal frame structure of production line
CN203696506U (en) Step-type clamp cushion block used for atomizing equipment processing panel drill floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130529

Termination date: 20201217

CF01 Termination of patent right due to non-payment of annual fee