Prior art keywords
tunnel
splash guard
hot melt
waterproof construction
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220694264
Other languages
Chinese (zh)
Inventor
田宝华
陈幼林
彭继安
张义君
金坤学
蒋继
李丰祥
王红
刘延龙
霍莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 23rd Bureau Group Co Ltd
Original Assignee
China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 23rd Bureau Group Co Ltd filed Critical China Railway 23rd Bureau Group Co Ltd
Priority to CN 201220694264 priority Critical patent/CN202937276U/en
Application granted granted Critical
Publication of CN202937276U publication Critical patent/CN202937276U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a waterproof device, in particular to a waterproof structure for a tunnel. The waterproof structure for the tunnel comprises a geotechnical cloth layer arranged on the surface of concrete. A plurality of hot melting liners are arranged on the outer side of the geotechnical cloth layer. A waterproof board covers the outer sides of the hot melting liners and the geotechnical cloth layer. The waterproof board is formed by a plurality of boards which are connected with each other in a welded-overlap-joint mode in sequence. Sealing air channels are arranged among welding joints of overlap connections of the boards. The waterproof structure for the tunnel has the advantages of being capable of being fully combined and firmly attached to the surface of the concrete, reasonable in arrangement, and simple in operation, and guaranteeing good water waterproof performance.

Description

A kind of tunnel waterproof construction
Technical field
The utility model relates to a kind of water-tight device, particularly a kind of tunnel waterproof construction.
Background technology
Along with the fast development of modern railways, highway, especially in the mountain area, the tunnel, not only saves time back and forth between two places close to straight line, and is also safer, become more and more common traffic ingredient.In the constructing tunnel process, resolve tunnel water proofing, draining, just can guarantee Inspection of Tunnel Quality, fundamentally eliminate tunnel safety hidden danger, increase tunnel application life.At present tunnel water proofing is mainly first directly to lay nonwoven or splash guard in country rock, preliminary bracing, and this laying difficulty is large, effect is unsatisfactory, easily causes the waterproof imprecision and leaks or seep water.
The utility model content
Goal of the invention of the present utility model is: the problem for prior art exists, a kind of tunnel waterproof construction is provided, and this waterproof construction laying is firm, easy to operate, waterproof effect is good.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of tunnel waterproof construction comprises the geotechnological layer of cloth that is located at concrete surface, is provided with some hot melt liners outside described geotechnological layer of cloth, and described splash guard is covered in the outside of described hot melt liner and geotechnological layer of cloth.
Preferably, described splash guard is welded to each other successively overlap joint by some blocks of plates and forms, and the width of described lap-joint plate is more than or equal to 15cm.
Preferably, be provided with the sealing air road between the weld seam of described splash guard lap-joint.
Preferably, described splash guard is at described hot melt liner place's formation bulge-structure adaptive with described hot melt pad profile.
Preferably, described splash guard is for being welded in the described hot melt liner outside.
Preferably, the 1.0 ~ 2.0m that staggers of deformation joint, the constuction joint in described splash guard lap-joint and described concrete.
Preferably, it is surperficial that described hot melt liner is fixed in described geotechnological layer of cloth by nailing, packing ring, and described nailing embeds in described concrete.
In sum, owing to having adopted technique scheme, the beneficial effects of the utility model are:
A kind of tunnel described in the utility model waterproof construction, geotechnological layer of cloth, some hot melt liners are set respectively outside concrete, and with nailing, the hot melt liner is fixed on geotechnological layer of cloth and nailing embedding concrete, then in hot melt liner surface soldered, splash guard is arranged, geotechnological layer of cloth is laid and compressed to splash guard simultaneously, and splash guard is formed by some plate welded lap.This waterproof construction can be fully in conjunction with and firmly be close to concrete surface, rationally distributed, simple to operate, guaranteed good water resistance.
Description of drawings
Fig. 1 is a kind of tunnel described in the utility model waterproof construction structural representation.
Fig. 2 is splash guard overlap joint schematic diagram described in the utility model.
Mark in figure:
1, concrete, 2, geotechnological layer of cloth, 3, the hot melt liner, 4, nailing, 5, packing ring, 6, splash guard, 7, lap-joint, 8, weld seam, 9, air channel.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in detail.
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explaining the utility model, and be not used in restriction the utility model.
As shown in Figure 1, a kind of tunnel waterproof construction comprises the geotechnological layer of cloth 2 that is located at concrete 1 surface, and described geotechnological layer of cloth 2 outsides are provided with some hot melt liners 3, and described splash guard 6 is covered in the outside of described hot melt liner 3 and geotechnological layer of cloth 2.
Wherein, when laying geotextiles layer 2 on concrete 1, at first with simple and easy operation platform, the geotechnological layer of cloth 2 of single width is fixed to the precalculated position, then with hot melt liner 3 and nailing 4, packing ring 5, geotechnological layer of cloth 2 is fixed on sprayed mortar 1; Special-purpose hot melt liner 3 and nailing 4 are by quincuncial arrangement, arch spacing 0.5-0.7m, abutment wall spacing 1.0-1.2m.Geotechnique's layer of cloth 2 is laid and is wanted the degree of tightness appropriateness, makes it to be close to sprayed mortar 1 surface, and tension easily is torn, and the mistake pine affects splash guard 6 and hangs, and between geotechnological layer of cloth 2 width, lap width is greater than 10cm.Splash guard 6 is welded on described hot melt liner 3 surfaces, forms domes when splash guard 6 is laid on geotechnological layer of cloth 2, hot melt liner 3.
Want degree of tightness appropriateness when splash guard 6 is laid on geotechnological layer of cloth 2, hot melt liner 3 in addition and leave surplus, making it fully to engage and be close to sprayed mortar 1 surface with geotechnological layer of cloth 2.Prevent too tight or too loose and splash guard 6 breakage that is squeezed may form the people for the retaining point.6 lap-joints 7 of splash guard should be advisable with the waterproof weak links such as deformation joint, the constuction joint 1.0~2.0m that staggers.
As shown in Figure 2, splash guard 6 is welded to each other overlap joint by some blocks of plates and forms, and in order to guarantee splash guard 6 bond strengths, its two width splash guard lap-joint 7 width are more than or equal to 15cm; Also be provided with sealing air road 9 between the weld seam 8 of splash guard lap-joint 7, the air channel 9 that is provided with is in order to check the weldquality of splash guard lap-joint 7; Its method of inspection is to utilize aeration to check the sealing of weld seam 8, being about to entry needle and pressure meter joins, with inflator, sealing air road 9 is inflated, when reaching 0.25Mpa, pressure meter stops inflation, keep 15min, if air channel 9 pressure drops in 10%, illustrate that weld seam 8 is qualified, as too fast in pressure drop, illustrate that weld seam 8 is not tight; Spread upon on weld seam 8 with suds again, the repair welding again of alveolate place, until air tight, guarantee the good water resistance of splash guard 6.
The above is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (7)

1. tunnel waterproof construction, comprise the geotechnological layer of cloth (2) that is located at concrete (1) surface, it is characterized in that, described geotechnological layer of cloth (2) outside is provided with some hot melt liners (3), and described splash guard (6) is covered in the outside of described hot melt liner (3) and geotechnological layer of cloth (2).
2. a kind of tunnel according to claim 1 waterproof construction, is characterized in that, described splash guard (6) is welded to each other successively overlap joint by some blocks of plates and forms, and the width of described lap-joint (7) plate is more than or equal to 15cm.
3. a kind of tunnel according to claim 2 waterproof construction, is characterized in that, is provided with sealing air road (9) between the weld seam (8) of described splash guard lap-joint (7).
4. arbitrary described a kind of tunnel waterproof construction according to claim 3, is characterized in that, described splash guard (6) locates to form the bulge-structure adaptive with described hot melt liner (3) profile at described hot melt liner (3).
5. a kind of tunnel according to claim 4 waterproof construction, is characterized in that, described splash guard (6) is for being welded in described hot melt liner (3) outside.
6. a kind of tunnel according to claim 5 waterproof construction, is characterized in that, described splash guard lap-joint (7) and deformation joint, constuction joint in described concrete (1) 1.0 ~ 2.0m that staggers.
7. the described a kind of tunnel of according to claim 1-6 any one waterproof construction, it is characterized in that, described hot melt liner (3) is fixed in described geotechnological layer of cloth (2) surface by nailing (4), packing ring (5), and described nailing (4) embeds in described concrete (1).
CN 201220694264 2012-12-14 2012-12-14 Waterproof structure for tunnel Expired - Lifetime CN202937276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220694264 CN202937276U (en) 2012-12-14 2012-12-14 Waterproof structure for tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220694264 CN202937276U (en) 2012-12-14 2012-12-14 Waterproof structure for tunnel

Publications (1)

Publication Number Publication Date
CN202937276U true CN202937276U (en) 2013-05-15

Family

ID=48321520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220694264 Expired - Lifetime CN202937276U (en) 2012-12-14 2012-12-14 Waterproof structure for tunnel

Country Status (1)

Country Link
CN (1) CN202937276U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104033167A (en) * 2013-03-08 2014-09-10 国家电网公司 Cable tunnel outlet water resisting device and method
CN104153397A (en) * 2014-08-06 2014-11-19 中国三冶集团有限公司 Concrete wall construction joint waterproof treatment method
CN104476765A (en) * 2014-10-22 2015-04-01 邓卫东 A tunnel waterproof board, a waterproof board welding method and a hot-melt welding machine
CN106500915A (en) * 2016-10-31 2017-03-15 哈尔滨电机厂有限责任公司 The air tightness testing method of airtight welding structure
CN106996300A (en) * 2017-04-19 2017-08-01 中铁十局集团第四工程有限公司 A kind of anchor bar of waterproof plate in tunnels laying method
CN107091719A (en) * 2017-04-01 2017-08-25 招商局重庆交通科研设计院有限公司 A kind of Tunnel splash guard weld seam airtight detection method
CN107355240A (en) * 2017-07-06 2017-11-17 中铁十八局集团有限公司 Modified tunnel water handling heats packing ring and fixed construction method
CN107435549A (en) * 2017-08-14 2017-12-05 合肥卓立雅工程材料科技有限公司 A kind of tunnel applications geomembrane laying method
CN109807456A (en) * 2019-01-02 2019-05-28 中交第二航务工程局有限公司 A kind of anchor bar of waterproof plate in tunnels electromagnetism welding construction method
CN112761678A (en) * 2021-01-11 2021-05-07 中国水利水电第五工程局有限公司 Construction method for laying waterproof board and installing secondary lining reinforcing steel bars by using trolley device

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104033167B (en) * 2013-03-08 2016-02-24 国家电网公司 The water-tight device of cable tunnel outlet and waterproof method
CN104033167A (en) * 2013-03-08 2014-09-10 国家电网公司 Cable tunnel outlet water resisting device and method
CN104153397A (en) * 2014-08-06 2014-11-19 中国三冶集团有限公司 Concrete wall construction joint waterproof treatment method
CN104153397B (en) * 2014-08-06 2016-05-18 中国三冶集团有限公司 A kind of concrete wall Case Study on Construction Joint Water-proofing
CN104476765A (en) * 2014-10-22 2015-04-01 邓卫东 A tunnel waterproof board, a waterproof board welding method and a hot-melt welding machine
CN106500915A (en) * 2016-10-31 2017-03-15 哈尔滨电机厂有限责任公司 The air tightness testing method of airtight welding structure
CN107091719A (en) * 2017-04-01 2017-08-25 招商局重庆交通科研设计院有限公司 A kind of Tunnel splash guard weld seam airtight detection method
CN106996300A (en) * 2017-04-19 2017-08-01 中铁十局集团第四工程有限公司 A kind of anchor bar of waterproof plate in tunnels laying method
CN106996300B (en) * 2017-04-19 2019-02-19 中铁十一局集团第四工程有限公司 A kind of anchor bar of waterproof plate in tunnels laying method
CN107355240A (en) * 2017-07-06 2017-11-17 中铁十八局集团有限公司 Modified tunnel water handling heats packing ring and fixed construction method
CN107435549A (en) * 2017-08-14 2017-12-05 合肥卓立雅工程材料科技有限公司 A kind of tunnel applications geomembrane laying method
CN109807456A (en) * 2019-01-02 2019-05-28 中交第二航务工程局有限公司 A kind of anchor bar of waterproof plate in tunnels electromagnetism welding construction method
CN112761678A (en) * 2021-01-11 2021-05-07 中国水利水电第五工程局有限公司 Construction method for laying waterproof board and installing secondary lining reinforcing steel bars by using trolley device

Similar Documents

Publication Publication Date Title
CN202937276U (en) Waterproof structure for tunnel
CN103061780B (en) Operation tunnel structure steel loop reinforced construction method
CN106436777B (en) A kind of subway station skin-type waterproof construction and its construction method
CN202832570U (en) Tunnel secondary lining construction joint waterproof structure
CN110344879A (en) A kind of tunnel water proofing drainage system
KR101469641B1 (en) Self-adhesive type composite waterproofing sheet and waterproof method using the same
CN209724368U (en) A kind of improved metro built by mining method water proof structure
CN104018857B (en) A kind of splicing laying method of anchor bar of waterproof plate in tunnels and structure thereof
CN103225285B (en) A kind of steel membrane rock
CN104963363B (en) Diaphram wall seam is anti-to stream enclosure device and construction method
CN110145364A (en) A kind of construction method of tunnel water handling structure
JP4108460B2 (en) Construction method of tunnel still water structure
CN106638714A (en) Construction joint structure applied to sectional construction and construction method thereof
CN206426543U (en) Coiled material lock seaming structure and lock seaming coiled material
CN205936663U (en) Undercut tunnel waterproof construction
CN206903674U (en) A kind of tunnel waterproofing construction
CN206428729U (en) A kind of reinforced underground project waterproof structure of combined type
KR101171037B1 (en) Method for compartmentalized tunnel waterproofing
CN206957745U (en) A kind of mounted waterproof layer of tunnel magic
CN214787444U (en) Tunnel waterproof plate structure
CN202644587U (en) Subway station main body structure plate deformation gap water-proof structure
CN211314278U (en) Waterproof drainage system in tunnel
CN104278699A (en) Underground engineering deformation joint waterproof technology
CN205078305U (en) Modular tunnel longitudinal drainage pipe
CN211228618U (en) Fixing device for underground structure rectangular section water stop belt

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130515

CX01 Expiry of patent term