CN202925480U - Reinforced steel truss lower node positioning die - Google Patents

Reinforced steel truss lower node positioning die Download PDF

Info

Publication number
CN202925480U
CN202925480U CN2012206857274U CN201220685727U CN202925480U CN 202925480 U CN202925480 U CN 202925480U CN 2012206857274 U CN2012206857274 U CN 2012206857274U CN 201220685727 U CN201220685727 U CN 201220685727U CN 202925480 U CN202925480 U CN 202925480U
Authority
CN
China
Prior art keywords
vertical
accurate adjustment
outrigger
adjustment bolt
adjuster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012206857274U
Other languages
Chinese (zh)
Inventor
卢志良
骆正甲
张雅平
陈晓辉
郭光权
周向国
马媛媛
杨少博
刘琳
姚晨辉
张蔚
刘晓林
崔伟
谭猛
杨旻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN2012206857274U priority Critical patent/CN202925480U/en
Application granted granted Critical
Publication of CN202925480U publication Critical patent/CN202925480U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a reinforced steel truss lower node positioning die which is characterized in that an outrigger is anchored on a poured beam section along the direction of a beam section to be poured, a vertical fine adjustment device, a transverse fine adjustment device, and a vertical fine adjustment device are respectively arranged on the outrigger, and the vertical and horizontal positions of the steel truss lower node suspended on the outrigger can be adjusted by means of the vertical fine adjustment device, the transverse fine adjustment device, and the vertical fine adjustment device. The positioning die provided gets rid of the unstable work condition of a suspended scaffold platform and can accurately position the steel truss lower node.

Description

The steel purlin lower node jig of putting more energy into
Technical field
The utility model relates to and being applied in during the bridge continuous beam cantilever builds, the device that cantilever segment pre-buried steel purlin lower node is adjusted and located.
Background technology
The put more energy into form of structure of combining structure case beam of the single firm structure steel of T of a kind of 15 2 * 108m purlin is applied to Shan, Line for Passenger Transportation Shanxi, the large western railway of China road Yellow River Bridge main span.Adopt Hanging Basket to carry out symmetrical cantilever construction, 100 meters of single T cantilever construction length nearly.Case beam beam-ends 60m scope beam section adopts steel purlin stiff girder to strengthen, and the steel purlin lower node that needs at first will put more energy into when the construction cantilever beam section is embedded in Liang Tizhong.
For the pre-buried large-scale component of construction in the fixed platform situation, such as steel purlin lower node, usually the method that adopts is that support system is set on fixed platform, determine its position through measuring, then fix its position by fixed platform and avoid being moved, measurement is carried out concreting after checking and completing.But, because the increase along with weight of the vertical position of Hanging Basket bottom die platform can change, can't provide fixed platform to finely tune, so can't guarantee the accuracy of built-in fitting position.
The utility model content
The utility model is for avoiding the existing weak point of above-mentioned prior art, a kind of steel purlin lower node jig of putting more energy on without the cantilever Cast-in-situ Beam section under the fixed platform operating environment is provided, steel purlin lower node is accurately located so that put more energy into, and guarantees programming, and improves workmanship.
The utility model is that the technical solution problem adopts following technical scheme:
The put more energy into design feature of steel purlin lower node jig of the utility model is: watering on the beam section along beam section direction anchoring outrigger to be poured, vertical adjuster, laterally adjuster and vertical adjuster are set respectively on described outrigger, utilize described vertical adjuster, laterally adjuster and vertical adjuster adjustment are suspended on the vertical and horizontal level of the steel purlin lower node on outrigger.
The put more energy into design feature of steel purlin lower node jig of the utility model also is: a pair of parallel outrigger along beam section direction to be poured setting waters on the beam section by pressing beam shaped steel and anchor rib to be anchored at, two ends longitudinal spacing shaped steel is set respectively between described pair of parallel outrigger, and the form with cross-arm on described pair of parallel outrigger arranges respectively two ends vertical spacing shaped steel; Weld respectively vertical accurate adjustment bolt on four vertical corners of steel purlin gusset plate, with vertical accurate adjustment bolt, described gusset plate is suspended on vertical spacing shaped steel; Horizontal accurate adjustment bolt is set on described outrigger, is butted on the side plate of steel purlin lower node with the front end of described horizontal accurate adjustment bolt; Vertical accurate adjustment bolt is set on described longitudinal spacing shaped steel, be butted on the side plate longitudinal terminal surface of steel purlin lower node with the front end of described vertical accurate adjustment bolt, described vertical adjuster is to be made of longitudinal spacing shaped steel and vertical accurate adjustment bolt, described horizontal adjuster is horizontal accurate adjustment bolt, and described vertical adjuster is to be made of vertical spacing shaped steel and vertical accurate adjustment bolt.
Compared with the prior art, the utility model beneficial effect is embodied in:
1, the utility model be the beam section of having completed construction be the basis, jig is set, make the steel purlin lower node of putting more energy on without fixed platform accurately be located.
2, precise adjusting device features simple structure in the utility model, on-the-spot easily processing and fabricating plays good economic effect.
3, in the utility model, jig itself is adjuster and a fixed system, has broken away from not fixed environment of platform hanging basket.
Description of drawings
Fig. 1 is rough package drawing in the utility model;
Fig. 2 is adjuster floor map in the utility model;
Fig. 3 is adjuster longitudinal section schematic diagram in the utility model;
Number in the figure: 1 outrigger; 2 vertical accurate adjustment bolts; 3 horizontal accurate adjustment bolts; 4 vertical accurate adjustment bolts; 5 press beam shaped steel; 6 anchor ribs; 7 vertical spacing shaped steel; 8 longitudinal spacing shaped steel; 10 steel purlin lower nodes; 11 have watered beam section, 12 beam sections to be poured.
The specific embodiment
Referring to Fig. 1, the steel purlin lower node jig of putting more energy in the present embodiment is at the direction anchoring outrigger 1 that waters on beam section 12 along beam section 11 to be poured, vertical adjuster, laterally adjuster and vertical adjuster are set respectively on outrigger 1, utilize vertical adjuster, laterally adjuster and vertical adjuster adjustment are suspended on the vertical and horizontal level of the steel purlin lower node 11 on outrigger 1.
In concrete enforcement, as Fig. 1, Fig. 2 and shown in Figure 3:
A pair of parallel outrigger 1 along beam section direction to be poured setting waters on beam section 11 by pressing beam shaped steel 5 and anchor rib 6 to be anchored at, two ends longitudinal spacing shaped steel 8 is set respectively between pair of parallel outrigger 1, and the form with cross-arm on pair of parallel outrigger 1 arranges respectively two ends vertical spacing shaped steel 7; Weld respectively vertical accurate adjustment bolt 2 on four vertical corners of steel purlin gusset plate, with vertical accurate adjustment bolt 2, gusset plate is suspended on vertical spacing shaped steel 7; Horizontal accurate adjustment bolt 3 is set on outrigger 1, is butted on the side plate of steel purlin lower node 10 with the front end of horizontal accurate adjustment bolt 3; Vertical accurate adjustment bolt 4 is set on longitudinal spacing shaped steel 8, be butted on the side plate longitudinal terminal surface of steel purlin lower node 10 with the front end of vertical accurate adjustment bolt 4, vertically adjuster is to be made of longitudinal spacing shaped steel 8 and vertical accurate adjustment bolt 4, laterally adjuster is horizontal accurate adjustment bolt 3, and vertical adjuster is to be made of vertical spacing shaped steel 7 and vertical accurate adjustment bolt 2.
In specifically implementing, outrigger 1 adopts the I40b i iron, and vertical accurate adjustment bolt 2, horizontal accurate adjustment bolt 3, vertical accurate adjustment bolt 4 and anchor rib 6 all adopt φ 25 fining twisted steels; Press beam shaped steel 5, vertical spacing shaped steel 7 and longitudinal spacing shaped steel 8 to be I14 i iron Two bors d's oeuveres;
After the anchoring of completing outrigger 1, vertical spacing shaped steel 7 and longitudinal spacing shaped steel 8 are welded on outrigger 1, then the nut of supporting setting and vertical spacing shaped steel and longitudinal spacing shaped steel and outrigger are welded, nut is fixed.After steel purlin lower node 10 hangs and puts in place, by vertical accurate adjustment bolt 2, laterally accurate adjustment bolt 3 and vertically 4 pairs, accurate adjustment bolt steel purlin lower node carry out accurate adjustment.
Work progress:
1, on job platform to the I40b i iron dipstick metering count and cut eye and be made into the outrigger 1 of bearing steel purlin lower node weight, cutting a position welded nut, nut adopts φ 25 nuts.
2, the outrigger 1 that processes is anchored on the concrete beam joint piece that waters the beam section, adopts jack and artificial the cooperation that steel purlin lower node roughly is placed on design attitude.
3, welding vertical spacing shaped steel 7 and longitudinal spacing shaped steel 8 on outrigger 1.
4, vertical accurate adjustment bolt 2 is installed on vertical spacing shaped steel 7, and vertical accurate adjustment bolt 2 welds with steel purlin lower node, horizontal accurate adjustment bolt 3 is installed on outrigger 1, vertical accurate adjustment bolt 4 is installed on longitudinal spacing shaped steel 8.
5, adjust respectively vertical accurate adjustment bolt 2, laterally accurate adjustment bolt 3 and vertical accurate adjustment bolt 4, make the position of steel purlin lower node 10 obtain accurate adjustment and location.
6, check through measuring, after determining that lower node position, steel purlin is errorless, steel purlin lower node to be fixed on outrigger 1, the adjustment of steel purlin lower node and fix and all broken away from Hanging Basket so can not change because of the vertical displacement of Hanging Basket.

Claims (2)

1. the steel purlin lower node jig of putting more energy into, it is characterized in that: watering the upper direction anchoring outrigger (1) along beam section to be poured (12) of beam section (11), vertical adjuster, horizontal adjuster and vertical adjuster are set respectively on described outrigger (1), utilize described vertical adjuster, horizontal adjuster and vertical adjuster adjustment to be suspended on the vertical horizontal level that reaches of the steel purlin lower node (10) on outrigger (1).
2. the steel purlin lower node jig of putting more energy into according to claim 1, it is characterized in that: a pair of parallel outrigger (1) that arranges along beam section direction to be poured waters on the beam section by pressing beam shaped steel (5) and anchor rib (6) to be anchored at, two ends longitudinal spacing shaped steel (8) are set respectively between described pair of parallel outrigger (1), in the upper form with cross-arm of described pair of parallel outrigger (1), two ends vertical spacing shaped steel (7) are set respectively; Weld respectively vertical accurate adjustment bolt (2) on four vertical corners of steel purlin gusset plate, with vertical accurate adjustment bolt (2), described gusset plate is suspended on vertical spacing shaped steel (7); Horizontal accurate adjustment bolt (3) is set on described outrigger (1), is butted on the side plate of steel purlin lower node (10) with the front end of described horizontal accurate adjustment bolt (3); Vertical accurate adjustment bolt (4) is set on described longitudinal spacing shaped steel (8), be butted on the side plate longitudinal terminal surface of steel purlin lower node (10) with the front end of described vertical accurate adjustment bolt (4), described vertical adjuster is to be made of longitudinal spacing shaped steel (8) and vertical accurate adjustment bolt (4), described horizontal adjuster is horizontal accurate adjustment bolt (3), and described vertical adjuster is to be made of vertical spacing shaped steel (7) and vertical accurate adjustment bolt (2).
CN2012206857274U 2012-12-12 2012-12-12 Reinforced steel truss lower node positioning die Expired - Fee Related CN202925480U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012206857274U CN202925480U (en) 2012-12-12 2012-12-12 Reinforced steel truss lower node positioning die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012206857274U CN202925480U (en) 2012-12-12 2012-12-12 Reinforced steel truss lower node positioning die

Publications (1)

Publication Number Publication Date
CN202925480U true CN202925480U (en) 2013-05-08

Family

ID=48215456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012206857274U Expired - Fee Related CN202925480U (en) 2012-12-12 2012-12-12 Reinforced steel truss lower node positioning die

Country Status (1)

Country Link
CN (1) CN202925480U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995570A (en) * 2012-12-12 2013-03-27 中铁上海工程局有限公司 Stiffening steel truss lower node location die

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995570A (en) * 2012-12-12 2013-03-27 中铁上海工程局有限公司 Stiffening steel truss lower node location die

Similar Documents

Publication Publication Date Title
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN109610328A (en) Straddle-type monorail Simple-supported PC Rail Beam in Light Rail high accuracy install method
CN202881856U (en) Concrete pouring support prepressing device
CN103437279B (en) Overhead cast-in-place box compression struts and construction technology thereof
CN203668833U (en) Steel web locating device
CN103498425A (en) Full-dismounting combination type multifunctional bracket supporting structure and construction method thereof
CN212375900U (en) Large-scale equipment mounting base location steel sheet bearing structure
CN205223871U (en) Suspension bridge bridge tower overarm brace pre -compaction device
CN211922298U (en) Recyclable tunnel anchor cable strand embedded pipe fine adjustment device
CN102995570A (en) Stiffening steel truss lower node location die
CN109267493A (en) A kind of construction method installed across river steel lid beam
CN105317052A (en) Tower crane foundation bolt fixing method
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN207775734U (en) A kind of balance regulator of single-cantilever assembly
CN107471428B (en) Manufacturing method in a kind of non-standard box beam field
CN202925480U (en) Reinforced steel truss lower node positioning die
CN109235280A (en) The operation platform and construction method of bridge coping
CN202989762U (en) Shock absorption device for bridge widening construction
CN202544423U (en) Hoisting structure of supporting steel column
CN210507148U (en) Positioning and adjusting device for main tower cable guide pipe of cable-stayed bridge
CN202265906U (en) Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN209194347U (en) The operation platform of bridge coping
CN104499435B (en) Bracket for mounting self-anchored cable-stayed bridge cable-stayed saddle base
CN107881914B (en) Wire-dividing tube type cable saddle back field assembly type positioning device and assembly method
CN103132461B (en) For the flexible carrier device of steel truss beam bridge cantilever construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20201212

CF01 Termination of patent right due to non-payment of annual fee