Real-time cluster control system for offshore wind plant Download PDFInfo
- Publication number
- CN202914242U CN202914242U CN2012204719744U CN201220471974U CN202914242U CN 202914242 U CN202914242 U CN 202914242U CN 2012204719744 U CN2012204719744 U CN 2012204719744U CN 201220471974 U CN201220471974 U CN 201220471974U CN 202914242 U CN202914242 U CN 202914242U
- Authority
- CN
- China
- Prior art keywords
- control system
- real
- time cluster
- centralized
- offshore wind
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model relates to a real-time cluster control system for an offshore wind plant. The real-time cluster control system for the offshore wind plant comprises fan controllers arranged on all wind driven generators and a centralized control center connected with the fan controllers in communication mode through a wireless network. High construction cost of submarine cable paving of the offshore wind plant due to a far offshore distance is reduced, problems of network circuit port aging, signal attenuating and the like are reduced, potential safety hazards of wireless network circuit faults of the offshore wind plant are reduced, and a plurality of problems of communication cables in actual use are solved.
Description
Technical field
The utility model relates to technical field of wind power generation, particularly relates to a kind of marine wind electric field Real-Time Cluster control system.
Background technique
At present, many areas in the whole world are populous, lack the place of implementing the large-scale wind electricity solution.And in underpopulated naturally area, national governments bring certain difficulty also for the construction of wind energy turbine set to the protection of ecological and natural landscape.And marine wind-force can not be subject to mountain range or influence of building, and Oversea wind is than the easier prediction in land simultaneously, and turbulent flow is less.In addition, the sea does not have the problem of limited space, and the neritic province domain of along the coastline often is the desirable place of building marine wind electric field, and offshore wind farm has obtained vigorous growth.
In many countries, the land site of suitable construction wind energy turbine set is fewer and feweri, and various countries all invest sight marine.Some state plan developing zones concentrate on the greater coasting areas such as wild and shipping of exclusive economic zone, periphery, shore line, and farther offshore distance means higher construction cost, and reason is as follows:
1, the bottom cable laying of marine wind electric field has proved time-consuming, and necessary diver's active receiving is formed on strong tidal flow.The weather that is fit to cable laying and trial run should provide enough surpluses in making a plan, the foul weather in summer should be taken into account especially;
2, during the wind energy turbine set operation, will face the problems such as the network line interface is aging, signal degradation, the maintenance cost of grid is relatively high.
Therefore, marine wind field network is laid difficulty becomes one of high reason of offshore wind farm construction cost, and most developer is just expecting to stabilize the measure of the extra construction cost that the offshore distance brings.But marine wind resource is abundant, the wind speed of marine wind electric field is higher than the wind speed of landwid electric field, do not take land surface, although its electrical network connection cost investment is relatively high, economic value and the social value of wind energy on the sea exploitation are just more and more approved.The construction of marine wind electric field is very crucial for the further developing of wind-powered electricity generation industry.
This shows, utilization exists various defectives and deficiency to offshore wind farm in the prior art, therefore how founding a kind of communication cable that saves lays, reduce difficulty of construction and construction cost, improve the Security of wind energy turbine set Real-Time Cluster control, and the marine wind electric field Real-Time Cluster control system of the problem such as aging, the signal degradation of network line interface in the process in avoiding using, one of real important topic that belongs to current research.
The model utility content
The purpose of this utility model provides a kind of marine wind electric field Real-Time Cluster control system, making it can save communication cable lays, reduce difficulty of construction and construction cost, and occur the problems such as the network line interface is aging, signal degradation in can avoiding using in the process, thereby overcome the deficiencies in the prior art.
For solving the problems of the technologies described above, a kind of marine wind electric field Real-Time Cluster of the utility model control system comprises: be arranged on the controller of fan on every typhoon power generator; And the centralized-control center that is connected with the controller of fan communication by wireless network.
As further improvement of the utility model, described controller of fan and centralized-control center respectively are connected with wireless transceiver, and are connected in wireless network by wireless transceiver separately.
Described centralized-control center mainly comprises ethernet switch hub, and the supervisory system of the wind field that is connected with ethernet switch hub, OS server and WEB server.
Described centralized-control center also is connected with router, display device and printer.
After adopting above design, the utility model compared with prior art has following beneficial effect:
1, solved the high construction cost of the bottom cable laying of the marine wind electric field that brings because of the offshore distance, and many difficult problems of having avoided communication cable in reality is implemented, to occur;
2, solve because of during the wind energy turbine set operation, the problems such as the network line interface of appearance wears out, signal degradation have reduced wind energy turbine set cable network line fault hidden danger, thereby and have reduced the maintenance cost of grid.
Below by drawings and Examples, the technical solution of the utility model is described in further detail.
Description of drawings
Above-mentioned only is the general introduction of technical solutions of the utility model, and for can clearer understanding the utility model, the utility model is described in further detail below in conjunction with accompanying drawing and embodiment.
Fig. 1 is a kind of marine wind electric field Real-Time Cluster of the utility model composition of the control system structural drawing.
Embodiment
See also shown in Figure 1ly, marine wind electric field Real-Time Cluster control system comprises centralized-control center, exchanges data layer, key-course and execution level, has realized the local control of blower fan, the control of wind field collection and remote monitoring.
The centralized-control center of wind field is used for the runnability to the every Fans of lower monitoring, upwards accepts local dispatching center to the requirement of its wind field generated energy.Centralized-control center mainly comprises ethernet switch hub, and the supervisory system of the wind field that is connected with ethernet switch hub, OS server and WEB server, in addition, and equipment such as connection route device, display device and printer as required also.
The exchanges data layer; it is the tie of connecting fan and centralized-control center; the service data of blower fan, fault recording are sent to centralized-control center accurately and fast, accept simultaneously the instruction that centralized-control center sends to blower fan (such as: open machine, shutdown, limit Power operation etc.).
Key-course relates generally to the controller of blower fan, and the automatic operation of blower fan body is controlled.
Execution level, namely involved various device in the blower fan when guaranteeing that blower fan normally moves, is carried out accordingly action.
Marine wind electric field Real-Time Cluster control system specific works flow process is as follows: A, data of utilizing centralized-control center acceptance and storage data exchange layer to transmit, monitor long-range fan operation situation; B, connect centralized-control center and key-course by the exchanges data layer, carry out exchanges data and wireless telecommunications; C, the control command by the exchange of the controller receiving data in key-course layer, and sending controling instruction is to execution level; D, according to the instruction of key-course, each equipment of blower fan is carried out corresponding action in the execution level.
Specifically, every Fans is all realized local control and telecontrol by blower fan, the controller of self and blower fan wireless transceiver, that is: blower fan opens machine, shutdown, meritorious and idle control.Involved various device in the blower fan when guaranteeing that blower fan normally moves, is carried out accordingly action.
Telecontrol and exchanges data are to realize by the wireless network that wind field is set up, centralized-control center is accepted the data that every Fans wireless transceiver transmits by the centralized-control center wireless transceiver, and centralized-control center also can send to by the centralized-control center wireless transceiver wireless transceiver reception control command of every Fans simultaneously.
Like this, marine wind electric field Real-Time Cluster control system replaces wire communication by wireless network, carries out exchanges data with the institute connecting fan, and blower fan is realized centralized control and remote monitoring.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is done any pro forma restriction, those skilled in the art utilize the technology contents of above-mentioned announcement to make a little simple modification, equivalent variations or modification, all drop in the protection domain of the present utility model.
Claims (3)
1. marine wind electric field Real-Time Cluster control system is characterized in that comprising:
Be arranged on the controller of fan on every typhoon power generator; And
The centralized-control center that is connected with the controller of fan communication by wireless network;
Described centralized-control center mainly comprises ethernet switch hub, and the supervisory system of the wind field that is connected with ethernet switch hub, OS server and WEB server.
2. marine wind electric field Real-Time Cluster control system according to claim 1 is characterized in that described controller of fan and centralized-control center respectively are connected with wireless transceiver, and is connected in wireless network by wireless transceiver separately.
3. marine wind electric field Real-Time Cluster control system according to claim 1 is characterized in that described centralized-control center also is connected with router, display device and printer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012204719744U CN202914242U (en) | 2012-09-14 | 2012-09-14 | Real-time cluster control system for offshore wind plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012204719744U CN202914242U (en) | 2012-09-14 | 2012-09-14 | Real-time cluster control system for offshore wind plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202914242U true CN202914242U (en) | 2013-05-01 |
Family
ID=48162561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012204719744U Expired - Lifetime CN202914242U (en) | 2012-09-14 | 2012-09-14 | Real-time cluster control system for offshore wind plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202914242U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102865189A (en) * | 2012-09-14 | 2013-01-09 | 国电联合动力技术有限公司 | Real-time cluster control system for offshore wind plant |
CN103267027A (en) * | 2013-05-30 | 2013-08-28 | 黑龙江省博凯科技开发有限公司 | Offshore fan safety monitoring system |
CN104037803A (en) * | 2014-06-09 | 2014-09-10 | 东北电力大学 | Sequential electricity quantity counting and analyzing method for regional wind farm group |
CN105005861A (en) * | 2015-07-17 | 2015-10-28 | 中国能源建设集团广东省电力设计研究院有限公司 | Operation regulation and control system for offshore wind farm |
CN113357083A (en) * | 2021-08-09 | 2021-09-07 | 东方电气风电有限公司 | Intelligent control system and method for wind generating set |
-
2012
- 2012-09-14 CN CN2012204719744U patent/CN202914242U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102865189A (en) * | 2012-09-14 | 2013-01-09 | 国电联合动力技术有限公司 | Real-time cluster control system for offshore wind plant |
CN103267027A (en) * | 2013-05-30 | 2013-08-28 | 黑龙江省博凯科技开发有限公司 | Offshore fan safety monitoring system |
CN103267027B (en) * | 2013-05-30 | 2016-11-16 | 黑龙江省博凯科技开发有限公司 | Offshore wind turbine safety monitoring system |
CN104037803A (en) * | 2014-06-09 | 2014-09-10 | 东北电力大学 | Sequential electricity quantity counting and analyzing method for regional wind farm group |
CN104037803B (en) * | 2014-06-09 | 2018-08-07 | 东北电力大学 | The statistics and analysis method of sequence electricity quantity when regional wind power group |
CN105005861A (en) * | 2015-07-17 | 2015-10-28 | 中国能源建设集团广东省电力设计研究院有限公司 | Operation regulation and control system for offshore wind farm |
CN105005861B (en) * | 2015-07-17 | 2018-07-24 | 中国能源建设集团广东省电力设计研究院有限公司 | Marine wind electric field runs regulator control system |
CN113357083A (en) * | 2021-08-09 | 2021-09-07 | 东方电气风电有限公司 | Intelligent control system and method for wind generating set |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202914242U (en) | Real-time cluster control system for offshore wind plant | |
CN104281737B (en) | A kind of wind power collection system of offshore wind power plant topological structure selection method | |
CN102865189A (en) | Real-time cluster control system for offshore wind plant | |
Chen et al. | Overview of the development of offshore wind power generation in China | |
CN104269937B (en) | A kind of operation monitoring system in distributed photovoltaic power station | |
CN104917204B (en) | A kind of active power of wind power field optimal control method | |
CN207039630U (en) | A kind of fine hair ring network data communication system of wind-powered electricity generation industry | |
CN102280923A (en) | Wind/solar hybrid power supply system for traction power supply | |
CN201433847Y (en) | Novel machine set monitoring system of water-pumping and energy-storing power station | |
CN107542626B (en) | Offshore wind power and vertical shaft type tidal current energy combined power generation device | |
CN104300587A (en) | Power grid frequency modulation control system and method based on wind power generation and thermal power generation | |
CN111336066A (en) | Wind power generation system for generating energy and control method | |
CN105098840B (en) | A kind of wind power cooperative control method and its system | |
CN204103595U (en) | Based on the distributed wind-power generator system of Internet of Things | |
CN202579032U (en) | Wireless paddle changing control system for wind generating set | |
CN106704084A (en) | Complete machine distribution design scheme of ocean-current-type generator set | |
CN102624034B (en) | Wind power station dispatching fit type idle work operation method suitable for high voltage power grid | |
CN202391650U (en) | Real-time remote monitoring system for wind power station group | |
CN103557120B (en) | Integral marine energy source power generation system | |
CN204331438U (en) | A kind of offshore wind farm set remote monitoring system | |
CN209765562U (en) | Extensible wind power prediction system | |
CN204361779U (en) | A kind of wind energy turbine set fault recovery system | |
CN202599447U (en) | Dam measuring and reporting instrument with wind-light complementary power generation system for power supply | |
CN207960842U (en) | A kind of deep sea energy source integrated system based on floating wind turbine and marine tidal-current energy device | |
CN206060616U (en) | The mounting structure of fishing light complementation photovoltaic generation electrical equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: GUODIAN UNITED POWER TECHNOLOGY (BAODING) Co.,Ltd. Assignor: GUODIAN UNITED POWER TECHNOLOGY Co.,Ltd. Contract record no.: 2015990000391 Denomination of utility model: Real-time cluster control system for offshore wind plant Granted publication date: 20130501 License type: Exclusive License Record date: 20150529 |
|
LICC | Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130501 |