CN202913762U - Tower cross arm with handrail and foot plates - Google Patents

Tower cross arm with handrail and foot plates Download PDF

Info

Publication number
CN202913762U
CN202913762U CN 201220566834 CN201220566834U CN202913762U CN 202913762 U CN202913762 U CN 202913762U CN 201220566834 CN201220566834 CN 201220566834 CN 201220566834 U CN201220566834 U CN 201220566834U CN 202913762 U CN202913762 U CN 202913762U
Authority
CN
China
Prior art keywords
foot rest
handrail
cross
cross arm
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220566834
Other languages
Chinese (zh)
Inventor
王月季
李凯
李玉明
徐负沈
王子环
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Century Communication Equipment Manufacturing Co., Ltd.
Original Assignee
HENAN CENTURY COMMUNICATION EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN CENTURY COMMUNICATION EQUIPMENT CO Ltd filed Critical HENAN CENTURY COMMUNICATION EQUIPMENT CO Ltd
Priority to CN 201220566834 priority Critical patent/CN202913762U/en
Application granted granted Critical
Publication of CN202913762U publication Critical patent/CN202913762U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to a tower cross arm with a handrail and foot plates. The tower cross arm with the handrail and the foot plates comprises a cross arm body. A group of the foot plates are arranged on the upper side of the cross arm body. The handrail or handrails are arranged on one side or two sides of the foot plates, and accord with the cross arm body in trend. Due to the facts that the group of the foot plates are arranged on the upper side face of the cross arm, and the handrail or the handrails are arranged on one side or two sides of the foot plates, when a worker is in construction operations, the worker not only can step on the foot plates, but also can grab the handrail with hands, and safety is high. Even the worker on a cross arm which is large in height, safety accidents, such as falls, are free from occurrence, so that the tower cross arm with the handrail and the foot plates has the advantages of being high in safety performance, convenient to install and rapid in installation.

Description

The cross arm of tower of a kind of Armrest and foot rest
Technical field
The utility model belongs to the electric power tower technical field, relates in particular to a kind of Armrest safe, quick and easy for installation and the cross arm of tower of foot rest.
Background technology
Along with China was to the input increasing of power infrastructures in recent years, increasing transmission line of electricity is set up.Shaft tower because of its compare with traditional angle steel tower have specious, floor space is little, cost performance is high, and adopted by vast Construction unit.Cross arm of tower is the important component part of shaft tower, it plays the effect of attached cable, in practice of construction, the staff often will climb up the operation that cross arm of tower is fixed cable, existing cross arm of tower does not mostly have safeguard measure, there is very large potential safety hazard, especially when some highly higher cross arm of tower operations, the security incident such as occurs falling easilier; Also occurred on the market the cross arm of tower that is provided with safeguard measure, but their structure is complicated, installation is very loaded down with trivial details and safety is not high.
Summary of the invention
The purpose of this utility model is in order to overcome the deficiencies in the prior art, and a kind of Armrest safe, quick and easy for installation and the cross arm of tower of foot rest are provided.
The purpose of this utility model is achieved in that the cross arm of tower of a kind of Armrest and foot rest, comprise the cross-arm body, the upside of described cross-arm body is provided with one group of foot rest, and a side of foot rest or both sides are provided with the cross-arm body and move towards consistent handrail.
Described foot rest is that equidistant placement is at three of cross-arm body upper side.
The rectangular-shaped structure of described handrail for being consisted of by cross bar and montant, the end that is positioned at the foot rest of two ends and centre is provided with pedestal, and the montant of handrail is plugged in the pedestal.
Described foot rest is to tilt upward in rectangular-shaped checkered steel plate and the two ends of foot rest.
The utlity model has following positive effect: the utility model arranges foot rest at the upper side of cross arm of tower, one side or the both sides of foot rest arrange handrail, the staff is when construction operation like this, not only with regard to the energy foot-treadle, but also the expert grips hand, and safety is higher, even operation on highly higher cross-arm, the security incident such as can not occur falling yet, ensure staff's personal safety; Handrail is pegged graft by the pedestal and the foot rest that are arranged on the foot rest end, and installation and removal are convenient like this; Foot rest adopts checkered steel plate and two ends to upwarp, and prevents from like this that the staff from sliding into because sole skids to fall; The utlity model has advantage safe, quick and easy for installation.
Description of drawings
Fig. 1 is the main TV structure schematic diagram of the cross arm of tower of a kind of Armrest of the utility model and foot rest.
Fig. 2 is the plan structure schematic diagram that the both sides of the cross arm of tower of a kind of Armrest of the utility model and foot rest arrange handrail.
Fig. 3 is the plan structure schematic diagram that a side of the cross arm of tower of a kind of Armrest of the utility model and foot rest arranges handrail.
Among the figure: 1, cross-arm body 2, handrail 3, foot rest 4, pedestal.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further:
Embodiment 1
As depicted in figs. 1 and 2, the cross arm of tower of a kind of Armrest and foot rest comprises cross-arm body 1, and the upside of described cross-arm body 1 is provided with one group of foot rest 3, and the both sides of foot rest 3 are provided with cross-arm body 1 and move towards consistent handrail 2.
Described foot rest 3 is that equidistant placement is at three of cross-arm body 1 upper side.
The rectangular-shaped structure of described handrail 2 for being consisted of by cross bar and montant, the end that is positioned at the foot rest 3 of two ends and centre is provided with pedestal 4, and the montant of handrail 2 is plugged in the pedestal 4.
Described foot rest 3 is tilted upward for rectangular-shaped checkered steel plate and the two ends of foot rest 3.
The utility model arranges foot rest 3 at the upper side of cross arm of tower body 1, one side or the both sides of foot rest 3 arrange handrail 2, the staff is when construction operation like this, not only with regard to energy foot-treadle 3, but also the expert grips hand 2, and safety is higher, even operation on highly higher cross-arm, the security incident such as can not occur falling yet, ensure staff's personal safety; Handrail 2 is pegged graft with foot rest 3 by the pedestal 4 that is arranged on foot rest 3 ends, and installation and removal are convenient like this; Foot rest 3 adopts checkered steel plates and two ends to upwarp, and prevents from like this that the staff from sliding into because sole skids to fall; The utlity model has advantage safe, quick and easy for installation.
Embodiment 2
As shown in figures 1 and 3, the cross arm of tower of a kind of Armrest and foot rest comprises cross-arm body 1, and the upside of described cross-arm body 1 is provided with one group of foot rest 3, and a side of foot rest 3 is provided with cross-arm body 1 and moves towards consistent handrail 2.
Described foot rest 3 is that equidistant placement is at three of cross-arm body 1 upper side.
The rectangular-shaped structure of described handrail 2 for being consisted of by cross bar and montant, the end that is positioned at the foot rest 3 of two ends and centre is provided with pedestal 4, and the montant of handrail 2 is plugged in the pedestal 4.
Described foot rest 3 is tilted upward for rectangular-shaped checkered steel plate and the two ends of foot rest 3.
The utility model arranges foot rest 3 at the upper side of cross arm of tower body 1, one side or the both sides of foot rest 3 arrange handrail 2, the staff is when construction operation like this, not only with regard to energy foot-treadle 3, but also the expert grips hand 2, and safety is higher, even operation on highly higher cross-arm, the security incident such as can not occur falling yet, ensure staff's personal safety; Handrail 2 is pegged graft with foot rest 3 by the pedestal 4 that is arranged on foot rest 3 ends, and installation and removal are convenient like this; Foot rest 3 adopts checkered steel plates and two ends to upwarp, and prevents from like this that the staff from sliding into because sole skids to fall; The utlity model has advantage safe, quick and easy for installation.

Claims (4)

1. the cross arm of tower of an Armrest and foot rest comprises the cross-arm body, and it is characterized in that: the upside of described cross-arm body is provided with one group of foot rest, and a side of foot rest or both sides are provided with the cross-arm body and move towards consistent handrail.
2. the cross arm of tower of a kind of Armrest according to claim 1 and foot rest, it is characterized in that: described foot rest is that equidistant placement is at three of cross-arm body upper side.
3. the cross arm of tower of a kind of Armrest according to claim 1 and foot rest, it is characterized in that: the rectangular-shaped structure of described handrail for being consisted of by cross bar and montant, the end that is positioned at the foot rest of two ends and centre is provided with pedestal, and the montant of handrail is plugged in the pedestal.
4. the cross arm of tower of a kind of Armrest according to claim 1 and foot rest is characterized in that: described foot rest is to tilt upward in rectangular-shaped checkered steel plate and the two ends of foot rest.
CN 201220566834 2012-10-31 2012-10-31 Tower cross arm with handrail and foot plates Expired - Fee Related CN202913762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220566834 CN202913762U (en) 2012-10-31 2012-10-31 Tower cross arm with handrail and foot plates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220566834 CN202913762U (en) 2012-10-31 2012-10-31 Tower cross arm with handrail and foot plates

Publications (1)

Publication Number Publication Date
CN202913762U true CN202913762U (en) 2013-05-01

Family

ID=48162084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220566834 Expired - Fee Related CN202913762U (en) 2012-10-31 2012-10-31 Tower cross arm with handrail and foot plates

Country Status (1)

Country Link
CN (1) CN202913762U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863409A (en) * 2015-06-17 2015-08-26 国家电网公司 Steel pipe pole climbable cross arm

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863409A (en) * 2015-06-17 2015-08-26 国家电网公司 Steel pipe pole climbable cross arm

Similar Documents

Publication Publication Date Title
CN201705190U (en) Insulation ladder capable of carrying objects
CN201981800U (en) Straight ladder type guard rail
CN102275797B (en) Elevator emergency falling protection device
CN202913762U (en) Tower cross arm with handrail and foot plates
CN203242941U (en) Novel electric power overhaul frame
CN202913761U (en) Tower cross arm with handrail
CN104653088A (en) Armrest-carrying insulating ladder
CN202136710U (en) Anti-falling structure for pole and tower climbing on power transmission line
CN204571817U (en) A kind of multifunction power maintenance ladder
CN202358794U (en) Spring device for coal mine hoister
CN102721838A (en) Mobile test platform for secondary verification
CN202296676U (en) Safety protection device for elevator
CN202913760U (en) Tower cross arm with foot plates
CN203545376U (en) Tower cylinder elevator
CN202926197U (en) Auxiliary hooking device for safety belt of steel tube tower
CN206172381U (en) Chain elevator chain buffer
CN209481105U (en) It is a kind of large size ball screw assembly, assembly use device
CN204137052U (en) A kind of multifunctional relay protection tester guard box
CN102780174B (en) Double-row type pulley sheave
CN202351266U (en) Insulating rod special for test
CN208369081U (en) A kind of height-adjustable safety inspection frame of power equipment
CN101972521A (en) Large-travel portable rescue lifter
CN207779842U (en) Goat grinding test platform
CN203951101U (en) A kind of double electric pole aerial work platform
CN202183574U (en) Push rod of line-clamping device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160412

Address after: Private science and Technology Park Weidu District north of Xuchang Henan province 461000 city Henan century communications equipment manufacturing Co. Ltd.

Patentee after: Henan Century Communication Equipment Manufacturing Co., Ltd.

Address before: Private science and Technology Park Weidu District north of Xuchang Henan province 461000 city Henan Century Communication Equipment Co. Ltd.

Patentee before: Henan Century Communication Equipment Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130501

Termination date: 20151031

EXPY Termination of patent right or utility model