CN202903927U - Complete-set comprehensive test bench - Google Patents

Complete-set comprehensive test bench Download PDF

Info

Publication number
CN202903927U
CN202903927U CN 201220602601 CN201220602601U CN202903927U CN 202903927 U CN202903927 U CN 202903927U CN 201220602601 CN201220602601 CN 201220602601 CN 201220602601 U CN201220602601 U CN 201220602601U CN 202903927 U CN202903927 U CN 202903927U
Authority
CN
China
Prior art keywords
tester part
tester
complete
test stand
downside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220602601
Other languages
Chinese (zh)
Inventor
魏林步
张光成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinyu Electric Coltd
Original Assignee
Zhejiang Jinyu Electric Coltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinyu Electric Coltd filed Critical Zhejiang Jinyu Electric Coltd
Priority to CN 201220602601 priority Critical patent/CN202903927U/en
Application granted granted Critical
Publication of CN202903927U publication Critical patent/CN202903927U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses a complete-set comprehensive test bench, mainly to solve the problems that keys of each function part of the existing comprehensive test bench are scattered and not compact in structure. The complete-set comprehensive test bench comprises a cabinet body, an operation panel and movable casters, and is characterized in that an alternating current and direct current voltage tester part, a three-phase small current tester part, a grounding resistor tester part, and a voltage resistance tester part are sequentially arranged on the operation panel. Due to the adoptation of the above technical scheme, the key structure of each operation part is substantially compact, the size of the machine body is greatly reduced, and operation of the working staff is facilitated.

Description

Complete combined test stand
Technical field
The utility model relates to a kind of test board, is specifically related to a kind of complete Universal electric test board.
Background technology
In electric field, usually need equipment is carried out electric test, such as, the test of AC and DC voltage, voltage-withstand test, resistance test and the little testing current of three-phase etc.
In general, most of electric test all is to synthesize on a combined test stand, thereby has simplified workload.But the button of existing combined test stand functions relatively disperses, and does not focus on one; Like this, the volume of entire machine has been increased greatly, and the staff is inconvenient to operate.
The utility model content
In order to overcome the deficiency of background technology, the utility model provides a kind of complete combined test stand, and the button that has mainly solved existing combined test stand functions disperses, the problem that structure is not compact.
The technical scheme that the utility model adopts is: a kind of complete combined test stand, comprise cabinet, guidance panel, movable castor, be provided with successively alterating and direct current pressure tester part, the little current tester part of three-phase, earth resistance tester part, Hi-pot Tester part on the guidance panel; Described alterating and direct current pressure tester part, the little current tester part of three-phase, Hi-pot Tester part upside are respectively equipped with electrical instrument and are positioned on the same level position, the middle part is respectively equipped with miniature circuit breaker and is positioned on the same level position, and downside is respectively equipped with starting switch and is positioned on the same level position; Described earth resistance tester part is provided with earth resistance tester with miniature circuit breaker same level position, and downside also is provided with starting switch.
The middle part of described alterating and direct current pressure tester part also is provided with switch and the time relay, and downside also is provided with DIP device.
The upside of described Hi-pot Tester part also is provided with the time relay, and downside also is provided with DIP device and pilot lamp.
Place, side, described cabinet middle part is provided with regulator.
Right side, described cabinet bottom is provided with output wiring terminal.
The beneficial effects of the utility model are: owing to take technique scheme, the press-key structure of each operation part is very compact, and the volume of fuselage greatly reduces, and has made things convenient for staff's operation.
Description of drawings
Fig. 1 is the front elevation of present embodiment.
Fig. 2 is the side view of present embodiment.
1-cabinet among the figure, 2-guidance panel, 3-movable castor, 4-alterating and direct current pressure tester part, the little current tester part of 5-three-phase, 6-earth resistance tester part, 7-Hi-pot Tester part, 8-electrical instrument, 9-miniature circuit breaker, the 10-starting switch, 11-switch, the 12-time relay, the 13-DIP device, the 14-pilot lamp, 15-regulator, 16-output wiring terminal.
Embodiment
Below in conjunction with accompanying drawing the utility model embodiment is described further:
Such as Fig. 1 in conjunction with shown in Figure 2, a kind of complete combined test stand, comprise cabinet 1, guidance panel 2, movable castor 3, be provided with successively alterating and direct current pressure tester part 4, the little current tester part 5 of three-phase, earth resistance tester part 6, Hi-pot Tester part 7 on the guidance panel 2; Described alterating and direct current pressure tester part 4, the little current tester part 5 of three-phase, Hi-pot Tester part 7 upsides are respectively equipped with electrical instrument 8 and are positioned on the same level position, the middle part is respectively equipped with miniature circuit breaker 9 and is positioned on the same level position, and downside is respectively equipped with starting switch 10 and is positioned on the same level position; Described earth resistance tester part 6 is provided with earth resistance tester 10 with miniature circuit breaker 9 same level positions, and downside also is provided with starting switch 10.The middle part of described alterating and direct current pressure tester part 4 also is provided with switch 11 and the time relay 12, and downside also is provided with DIP device 13.The upside of described Hi-pot Tester part 7 also is provided with the time relay 12, and downside also is provided with DIP device 13 and pilot lamp 14.Place, side, described cabinet 1 middle part is provided with regulator 15.Right side, cabinet 1 bottom is provided with output wiring terminal 16.
Alterating and direct current pressure tester part 4 operations: close a switch, press start button 10, regulator 15 is transferred to the required voltage value, Voltage-output is on cabinet 1 lower right side joint terminal, AC power is output as three-phase and four-line, and direct supply is output as 220V, is respectively two binding posts of positive and negative electrode.Combined-voltage all passes through isolating transformer, and DC voltage is to adopt bridge rectifier.
Earth resistance tester part 6 operation: determine that electric current regulates 15 device knobs with the reset position, then turn on the power switch.Select corresponding range according to the test request of measured piece.P-wire and measured piece are connected.Contact must be good.Then starting switch 10, and at this moment, adjusting current regulator knob 15 makes and outputs current to desirable value.
Little current tester part 5 operations of three-phase: the contact is connected, receive on the auxiliary normally closed point in last loop.Regulation voltage again, when voltage was transferred to desirable value, the time relay 12 can self-clockings, and reactive-load compensator can discharge A.C. contactor automatically.When being discharged into last loop, the time relay 12 can stop automatically, and the time of testing is exactly the superpotential test value.
Hi-pot Tester part 7 operations: close a switch; clip beating withstand voltage product; voltage regulator 15 is down to zero-bit (zero position protection is arranged; can not start); then press start button 10; regulation voltage regulator 15 transfers to required voltage, the time relay 12 meeting self-clockings; Preset Time then; can automatic cutoff high export, this moment, stopping light was bright, and voltage is default; according to product required voltage value; at first electric current DIP device 13 is set, when voltage reached setting value, the time relay 12 can self-clocking.Current settings sets electric current DIP device 13 equally, and when primary current reached this value, this moment, alarm meeting automatic alarm and pilot lamp were bright.When needing to survey again, press stop button, press again start button.
More than be exactly the each several part operation of this complete combined test stand because each structure compactness very so that the staff is very convenient in operation, and so that the volume of entire machine also greatly reduced.

Claims (5)

1. complete combined test stand, comprise cabinet (1), guidance panel (2), movable castor (3), it is characterized in that: be provided with successively alterating and direct current pressure tester part (4), the little current tester part of three-phase (5), earth resistance tester part (6), Hi-pot Tester part (7) on the guidance panel (2); Described alterating and direct current pressure tester part (4), the little current tester part of three-phase (5), Hi-pot Tester part (7) upside are respectively equipped with electrical instrument (8) and are positioned on the same level position, the middle part is respectively equipped with miniature circuit breaker (9) and is positioned on the same level position, and downside is respectively equipped with starting switch (10) and is positioned on the same level position; Described earth resistance tester part (6) is provided with earth resistance tester (10) with miniature circuit breaker (9) same level position, and downside also is provided with starting switch (10).
2. complete combined test stand according to claim 1, it is characterized in that: the middle part of described alterating and direct current pressure tester part (4) also is provided with switch (11) and the time relay (12), and downside also is provided with DIP device (13).
3. complete combined test stand according to claim 1 and 2 is characterized in that: the upside of described Hi-pot Tester part (7) also is provided with the time relay (12), and downside also is provided with DIP device (13) and pilot lamp (14).
4. complete combined test stand according to claim 1 is characterized in that: place, side, described cabinet (1) middle part is provided with regulator (15).
5. complete combined test stand according to claim 1, it is characterized in that: cabinet (1) right side, bottom is provided with output wiring terminal (16).
CN 201220602601 2012-11-14 2012-11-14 Complete-set comprehensive test bench Expired - Lifetime CN202903927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220602601 CN202903927U (en) 2012-11-14 2012-11-14 Complete-set comprehensive test bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220602601 CN202903927U (en) 2012-11-14 2012-11-14 Complete-set comprehensive test bench

Publications (1)

Publication Number Publication Date
CN202903927U true CN202903927U (en) 2013-04-24

Family

ID=48124583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220602601 Expired - Lifetime CN202903927U (en) 2012-11-14 2012-11-14 Complete-set comprehensive test bench

Country Status (1)

Country Link
CN (1) CN202903927U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103675658A (en) * 2013-11-21 2014-03-26 洛阳龙羽电气设备有限公司 Test bed special for electric tests
CN105301389A (en) * 2015-10-12 2016-02-03 沈阳南车时代交通设备有限公司 Mobile test bench for tests of traction system
CN113253020A (en) * 2021-04-26 2021-08-13 嘉兴市恒创电力设备有限公司 Complete cabinet-based multifunctional intelligent test bench system and rapid test method thereof
CN115267392A (en) * 2022-07-28 2022-11-01 淄博市产品质量检验研究院 Device and method for detecting operating characteristics of electrical equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103675658A (en) * 2013-11-21 2014-03-26 洛阳龙羽电气设备有限公司 Test bed special for electric tests
CN105301389A (en) * 2015-10-12 2016-02-03 沈阳南车时代交通设备有限公司 Mobile test bench for tests of traction system
CN105301389B (en) * 2015-10-12 2018-01-16 沈阳中车时代交通设备有限公司 A kind of transportable test panel platform for trailer system test
CN113253020A (en) * 2021-04-26 2021-08-13 嘉兴市恒创电力设备有限公司 Complete cabinet-based multifunctional intelligent test bench system and rapid test method thereof
CN115267392A (en) * 2022-07-28 2022-11-01 淄博市产品质量检验研究院 Device and method for detecting operating characteristics of electrical equipment

Similar Documents

Publication Publication Date Title
CN202119860U (en) Current transformer polarity testing box
CN103630734B (en) A kind of full voltage all-loop self-inspection condensing type electroscope
CN202903927U (en) Complete-set comprehensive test bench
CN202110274U (en) Association test tool for meter switch
CN202939885U (en) Electrical measuring instrument simulation training apparatus
CN203535165U (en) Portable current transformer polarity tester
CN203217023U (en) Motor and transformer microcomputer integration test stand
CN105203948A (en) Circuit breaker integrated test device
CN203705523U (en) Multifunctional integrated comprehensive test bench
CN203133226U (en) Polarity testing instrument for current transformer
CN206270449U (en) A kind of ac voltage withstanding testing stand
CN208795801U (en) A kind of automatic no-load voltage ratio tester
CN209432939U (en) A kind of high-power transformer second protection polarity test device
CN204832412U (en) Novel combined instrument transformer polarity test appearance
CN205038882U (en) Electrician instructs device in fact
CN104931905B (en) High voltage electroscope starts voltage test device and test method
CN207069928U (en) A kind of separate type small-size multifunction adjustable power of direct current
CN206023362U (en) Double loop power supply socket apparatus for fast switching
CN203909209U (en) High-low voltage current voltage transformer polarity tester
CN204347225U (en) A kind of power switch period measuring device
CN210376575U (en) Withstand voltage insulation test control circuit and withstand voltage insulation test equipment
CN209460300U (en) A kind of controlled silicon detection apparatus
CN204631221U (en) System for Circuit Breaker proving installation
CN203858285U (en) Full-voltage full-loop self-checking capacitive type electroscope
CN201887467U (en) Automatic power converter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130424

CX01 Expiry of patent term