CN202898924U - Overpass assembly between primary road L type and branch road connection pedestrian/vehicle barrier-free bridge tunnel - Google Patents

Overpass assembly between primary road L type and branch road connection pedestrian/vehicle barrier-free bridge tunnel Download PDF

Info

Publication number
CN202898924U
CN202898924U CN 201220308488 CN201220308488U CN202898924U CN 202898924 U CN202898924 U CN 202898924U CN 201220308488 CN201220308488 CN 201220308488 CN 201220308488 U CN201220308488 U CN 201220308488U CN 202898924 U CN202898924 U CN 202898924U
Authority
CN
China
Prior art keywords
road
sidewalk
branch road
turnpike
pedestrian
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220308488
Other languages
Chinese (zh)
Inventor
赵树峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220308488 priority Critical patent/CN202898924U/en
Application granted granted Critical
Publication of CN202898924U publication Critical patent/CN202898924U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Road Signs Or Road Markings (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides an overpass assembly between a primary road L type and a branch road connection pedestrian/vehicle barrier-free bridge tunnel, and relates to a combined type traffic facility of road traffic at a primary road connection road section. The overpass assembly comprises a primary road (1) and a branch road (2), wherein the primary road (1) is connected with the branch road (2) in a joining way. The overpass assembly is characterized in that two sides of the primary road (1) and the branch road (2) are respectively provided with a sidewalk (5), the sidewalks (5) are arranged on the same horizontal plane; the primary road (1) is provided with an arc tunnel (3) for the barrier-free arc passing of the turning motor vehicle at the primary road (1) L type at the lower layer of a joining part of the connecting road section sidewalks (5), the primary road (1) and the branch road (2), an upper layer of the joining place of the sidewalks (5) of the connection road section, the primary road (1) and the branch road (2) is provided with a circular overpass (4), the circular overpass (4) is used for the turning vehicles at the primary road (1) and the motor vehicles at the branch road (2) in all directions at different directions to pass, and the joining place of the sidewalks (5) of the connection road sections, the primary road (1) and the branch road (2) is provided with a circular circle (6) for pedestrians to freely walk along all directions.

Description

The arterial road L-type connects pedestrian, the combination of the accessible bridge tunnel of vehicle grade separation with by-path
Technical field
Relate to a kind of arterial road L-type of road traffic crankle and connect the combination of bridge tunnel grade separation with the branch road.
Background technology
Day by day increase in road traffic automobile use amount in service, pass through that freely vehicle congestion is very serious and the existing road means of transportation do not catch up with development so that some arterial road L-type crankle connects the highway section with Zhi Gandao.Road traffic now adopts single overpass bridge, bridge or tunnel to solve traffic jam issue, and vehicle-pedestrian conflict, traffic lights is set waits for restricted driving, greatly reduces the road traffic traffic efficiency, even brings many potential safety hazards; Or adopt pedestrian overcrossing or People's Bank of China's tube, and going across the road to the pedestrian and bring very big inconvenience, motor vehicles safety hazard and the main status of people in road traffic of causing to the pedestrian that block up more and more is subject to social concerns and attention in the urban highway traffic.
The utility model content
The technical problems to be solved in the utility model is that a kind of arterial road L-type crankle of design connects bridge tunnel grade separation combination with the branch road, make human and vehicle shunting no longer people having a common goal strive row, do not establish traffic lights and wait for and restrict driving guarantee pedestrian, accessible comprehensive the passing through of vehicle.The pedestrian walks all the time on ground line and not disturbed by vehicle; Turn round vehicle and the comprehensive bend of Zhi Gandao vehicle of the preferential barrier free accessibility of major trunk roads vehicle, major trunk roads is unimpeded.
For solving the problem in the above-mentioned road traffic, the utility model has designed a kind of like this arterial road L-type crankle and has connected the combination of bridge tunnel grade separation with the branch road: include turnpike road, the branch road, described turnpike road crosses with the branch road and connects, the both sides of described turnpike road and branch road all are provided with the sidewalk, described sidewalk is positioned on the same ground line, described turnpike road is provided with arc tunnel for the turnpike road vehicle barrier free accessibility that continues to travel in the lower floor that connects road section sidewalk intersection with the branch road, and described turnpike road connects road section sidewalk intersection with the branch road upper strata is provided with confession turnpike road turn round vehicle and the comprehensive circular overpass bridge of selecting to passing through that curves of branch road vehicle.
Described sidewalk is positioned at turnpike road and branch road and crosses and connect the highway section and be provided with a comprehensive perforation of round turntable.
Described circular overpass bridge is three tracks in the same way, it is respectively the track, outer ring of right-hand bend Vehicle Driving Cycle and middle lane and the inner ring track that the left-hand bend vehicle travels, described circular overpass bridge is provided with a plurality of import ring roads and exit ramp, and the access of described import ring road and exit ramp is located at respectively on the outermost motorway and branch road automobile road of turnpike road.
Described arc tunnel is two-way Four-Lane Road, and it is current to continue the accessible camber line of driving vehicle for arterial road L-type crankle.
After taking above-mentioned arterial road L-type crankle to connect bridge tunnel grade separation combined facility with by-path, can realize human and vehicle shunting no longer people having a common goal strive row, do not establish traffic lights and wait for restricted driving, ensure pedestrian, accessible comprehensive the passing through of vehicle, reduce the potential safety hazard that road traffic blocks up urban road traffic congestion especially and brings thus, improve the road traffic traffic efficiency.Optimize the road traffic structure, reduce the road traffic floor space, " automobile family " opens unimpeded road for the city; For pedestrian, " bike clan " open wide convenient and safe door.Embody Humanistic Love, harmonious Traffic New Concept.
Description of drawings
Fig. 1 is the utility model top view
Fig. 2 is the utility model schematic perspective view
The specific embodiment
As shown in Figure 1, turnpike road 1 " L " type crankle crosses with branch road 2 and connects, turnpike road 1 all is provided with sidewalk 5 with the road both sides of branch road 2, (arterial road are two-way six-lane among the figure for motorway between the sidewalk 5 of road both sides, Zhi Gandao is two-way Four-Lane Road, also can show road conditions increase and decrease motorway or Zhi Gandao number), sidewalk 5 arranges round turntable 6 comprehensive perforations in the highway section that crosses on same ground line.
Be positioned at turnpike road 1 and be provided with arc tunnel 3 in the lower floor that connects road section sidewalk 5 intersections with branch road 2, described arc tunnel 3 is current for the accessible camber line of turnpike road 1 " L " type crankle motor vehicles that continues to travel, described arc tunnel 3 is two-way Four-Lane Road, 5.3 meters (Class I highway limit for height standards of its limit for height, also can different limits for height be set with different road conditions, or incite somebody to action " the arterial road L-type connects pedestrian, the combination of the accessible bridge tunnel of vehicle grade separation with by-path " overall architecture and move 1 meter at ground line, to reduce arc tunnel 3 underground height).3 discrepancy climb and fall highway sections, arc tunnel are slope of standard.
Be positioned at turnpike road 1 branch road 2 upper strata that connects road section sidewalk 5 that crosses and be provided with circular overpass bridge 4, described circular overpass bridge 4 is selected to current for turn round vehicle and comprehensive the curving of branch road 2 motor vehicles of turnpike roads 1; Described circular overpass bridge 4 is three tracks in the same way, its track, outer ring 4c is for the curved Vehicle Driving Cycle of directly turning right, middle lane 4d and inner ring track 4e travel (internal diameter of described circular overpass bridge 4 middle lane 4d equals the diameter of sidewalk round turntable 6) for the left-hand bend vehicle; Described circular overpass bridge 4 is provided with import ring road 4a exit ramp 4b, described import ring road 4a drives into for turn round vehicle and branch road 2 motor vehicles of turnpike road 1, described exit ramp 4b selects to rolling away from for circular overpass bridge 4 motor vehicles are comprehensive, and the climb and fall highway section of described import ring road 4a exit ramp 4b is slope of standard; Described circular overpass bridge 4 is 2.6 meters apart from the minimum altitude on 5 road surfaces, sidewalk, can make so accessible walking freely on the sidewalk of pedestrian below circular overpass bridge 4.
Described sidewalk 5 crosses at turnpike road 1 branch road 2 and connects the same ground line in highway section a round turntable 6 is set, described round turntable 6 makes sidewalk 5 comprehensive perforations, the maximum gauge of round turntable 6 is the altogether summation on sidewalk of turnpike road 1 two-way motorway, and puts the area at round turntable 6 interior annular spaces and put and afforest and beautify environment (or Convenient shopping market or building mark tower are set).

Claims (4)

1. the arterial road L-type connects the pedestrian with by-path, the combination of the accessible bridge tunnel of vehicle grade separation, it is a kind of road traffic connects the highway section at main Zhi Gandao combined traffic facility, include turnpike road (1), branch road (2), described turnpike road (1) crosses with branch road (2) and connects, it is characterized in that: the both sides of described turnpike road (1) and branch road (2) all are provided with sidewalk (5), described sidewalk (5) is on same ground line, described turnpike road (1) is in the lower floor that connects road section sidewalk (5) intersection with Zhi Gandao (2), be provided with for the current arc tunnel (3) of the accessible camber line of turnpike road (1) L-type crankle motor vehicles, described turnpike road (1) connects road section sidewalk (5) intersection with branch road (2) upper strata is provided with a circular overpass bridge (4), described circular overpass bridge (4) is selected to comprehensive current for turn round vehicle and branch road (2) motor vehicles of turnpike road (1), and described turnpike road (1) connects road section sidewalk (5) intersection the comprehensive walking freely of round turntable (6) confession pedestrian is set with Zhi Gandao (2).
2. described arterial road L-type connects pedestrian, the combination of the accessible bridge tunnel of vehicle grade separation with by-path according to claim 1, it is characterized in that: described sidewalk (5) cross at turnpike road (1) and branch road (2) and connect the same ground line in highway section and be provided with the comprehensive perforation of a round turntable (6), make the pedestrian all the time walking freely on ground line, disturbed by vehicle, described round turntable (6) maximum gauge is the altogether summation on sidewalk of the two-way motorway of major trunk roads.
3. described arterial road L-type connects pedestrian, the combination of the accessible bridge tunnel of vehicle grade separation with by-path according to claim 1, it is characterized in that: described arc tunnel (3) is two-way Four-Lane Road L-type crankle, current for L-type crankle turnpike road (1) the accessible camber line of motor vehicles that continues to travel, 5.3 meters of described arc tunnel (3) limits for height; Discrepancy climb and fall highway section, described arc tunnel (3) is slope of standard.
4. described arterial road L-type connects pedestrian, the combination of the accessible bridge tunnel of vehicle grade separation with by-path according to claim 1, it is characterized in that: described circular overpass bridge (4) is three tracks in the same way, described circular overpass bridge (4) is apart from 2.6 meters of road surface, sidewalk (5) minimum altitudes, and described circular overpass bridge (4) is selected to current for turn round vehicle and comprehensive the curving of branch road (2) motor vehicles of turnpike road (1).
CN 201220308488 2012-06-26 2012-06-26 Overpass assembly between primary road L type and branch road connection pedestrian/vehicle barrier-free bridge tunnel Expired - Lifetime CN202898924U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220308488 CN202898924U (en) 2012-06-26 2012-06-26 Overpass assembly between primary road L type and branch road connection pedestrian/vehicle barrier-free bridge tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220308488 CN202898924U (en) 2012-06-26 2012-06-26 Overpass assembly between primary road L type and branch road connection pedestrian/vehicle barrier-free bridge tunnel

Publications (1)

Publication Number Publication Date
CN202898924U true CN202898924U (en) 2013-04-24

Family

ID=48119614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220308488 Expired - Lifetime CN202898924U (en) 2012-06-26 2012-06-26 Overpass assembly between primary road L type and branch road connection pedestrian/vehicle barrier-free bridge tunnel

Country Status (1)

Country Link
CN (1) CN202898924U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747658A (en) * 2012-06-26 2012-10-24 赵树峰 Trunk road L-shaped crankle and branch road connection combined barrier-free all-round transportation hub
CN109629357A (en) * 2019-01-03 2019-04-16 张学纲 A kind of quick accommodation road of accessible public transport
WO2021036902A1 (en) * 2019-08-28 2021-03-04 李文彬 Interchange overpass bridge

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747658A (en) * 2012-06-26 2012-10-24 赵树峰 Trunk road L-shaped crankle and branch road connection combined barrier-free all-round transportation hub
CN102747658B (en) * 2012-06-26 2014-10-22 赵树峰 Trunk road L-shaped crankle and branch road connection combined barrier-free all-round transportation hub
CN109629357A (en) * 2019-01-03 2019-04-16 张学纲 A kind of quick accommodation road of accessible public transport
WO2021036902A1 (en) * 2019-08-28 2021-03-04 李文彬 Interchange overpass bridge

Similar Documents

Publication Publication Date Title
CN102660914A (en) Crossroad barrier-free all-direction combined type transportation junction
WO2008009189A1 (en) A land saving and energy saving, unblocked ecological urban system with ordered space
KR20060088117A (en) A full interchange urban road system and the traffic method of using it
CN201835564U (en) Elevated multi-layer parking lot
CN101338542A (en) Full-green traffic by-pass system on road crossing
CN202194041U (en) Flyover
CN102322005A (en) Flyover
CN102979019A (en) Pedestrian and vehicle barrier-free combined flyover at arterial road and branch road intersection
CN102747658B (en) Trunk road L-shaped crankle and branch road connection combined barrier-free all-round transportation hub
CN202925408U (en) Crossroad combined type transportation junction for barrier-free passing of pedestrians and vehicles
CN202898924U (en) Overpass assembly between primary road L type and branch road connection pedestrian/vehicle barrier-free bridge tunnel
CN100392185C (en) Cross three-dimensional taffic apparatus
CN202913322U (en) T-shaped intersection pedestrian and vehicle barrier-free combined overpass
CN102747657B (en) T road barrier-free all-pass combined transportation hub
CN201099829Y (en) Human vehicle shunting facilities
CN201738207U (en) High through capacity crossroad full intercommunication fly-over bridge
WO2014079153A1 (en) Interchange for separating pedestrians from vehicles
CN204982577U (en) All -round multilevel traffic facility of city crossroad
CN101338541B (en) Crossing elevated passage for relaxing traffic jam
CN1834352B (en) City system having man and vehicles fully separated
CN103215867B (en) Assembled type intersected road system of bridge floor supporting band traveling device
CN103541285B (en) Conflict-free stereoscopic composite bridge
CN101487214A (en) Humanized multifunctional intersection for urban crossroad
CN201785688U (en) Full-intercommunication flyover for narrow crossroad
CN205775678U (en) A kind of multi-functional cross overpass

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130424

Effective date of abandoning: 20141022

RGAV Abandon patent right to avoid regrant