CN202884875U - Boiler flue structure - Google Patents

Boiler flue structure Download PDF

Info

Publication number
CN202884875U
CN202884875U CN 201220535255 CN201220535255U CN202884875U CN 202884875 U CN202884875 U CN 202884875U CN 201220535255 CN201220535255 CN 201220535255 CN 201220535255 U CN201220535255 U CN 201220535255U CN 202884875 U CN202884875 U CN 202884875U
Authority
CN
China
Prior art keywords
flue
boiler
ash
shaped channel
high temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220535255
Other languages
Chinese (zh)
Inventor
杨燕梅
吕俊复
张海
吴玉新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN 201220535255 priority Critical patent/CN202884875U/en
Application granted granted Critical
Publication of CN202884875U publication Critical patent/CN202884875U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Combustion Of Fluid Fuel (AREA)

Abstract

The utility model provides a boiler flue structure, and belongs to the technical field of fuel-burning equipment. The boiler flue structure comprises a first flue, a second flue and a tail portion flue. A cooling water wall partition divides an outlet flue of a boiler furnace into a U-shaped channel, and the first flue and the second flue are arranged in the U-shaped channel in sequence along a smoke flow path and are communicated through an ash hopper in the middle. A high temperature reheater is arranged in the first flue, and a finishing superheater is arranged in the second flue. A low temperature reheater and a coal economizer and other convection heating surfaces are arranged in the tail portion flue. The ash hopper is arranged at the bottom of the U-shaped channel, and the ash hopper is not only a steering chamber for smoke flow, but also can be used for ash deposition. An air-lock device is arranged at the bottom of the ash hopper and used for eliminating the accumulated ash at regular intervals. The heating surfaces arranged in the U-shaped channel are all in a crust block type structure and are arranged in a big coarse pitch mode. The boiler flue structure can solve the problem that the boiler high temperature convection heating surfaces are stained severely.

Description

A kind of boiler flue structure
Technical field
The utility model relates to the structural design of coal-burning boiler, and particularly the high temperature convection heating surface stains serious coal-burning boiler flue structure design, belongs to the combustion apparatus technical field.
Background technology
It is inevitable phenomenon in the boiler running process that the high temperature convection heating surface stains, and affect the heating surface heat exchange, and the reduction boiler output causes the metal erosion of heating surface tube wall, stains when serious even the problem such as overtemperature tube burst can occur.Boiler flue structure reasonable in design can help to solve the contamination problem of high-temperature surface.
Accurate eastern coal volatile matter content is high, and ash content is few, easily catches fire easy to burn out.But alkali metal content is high in the accurate eastern coal, and sulfur content is also higher simultaneously.The chloride of alkalies and alkaline earth, sulfate fusing point are low, may be gaseous state or molten state under the high temperature.In addition, alkali metal also is easy to and SiO in combustion process 2, Al 2O 3Deng formation low temperature eutectic, for example SiO 2-CaO-Na 2The fusing point of O is 720 ℃, Na 3Al(SO 4) 3Fusing point is 920 ℃ etc.In certain temperature range scope (flue-gas temperature is regional at 750 ~ 900 ℃ high temperature convection heating surface), the alkali metal compound of gaseous state or low-temperature eutectic thing, meet cold cohering on heating surface, the ash particle in the flue gas also is adhered to the surface of convection heating surface gradually.This is a kind of growth dust stratification, such as untimely removing, will affect safe, stable, the efficient operation of boiler.
Accurate eastern coal high-moisture, Serious Slagging and fouling characteristics have brought very large difficulty for the safe operation of built boiler of power plant.From the situation of the accurate eastern coal of boiler combustion that put into operation at present, all found more serious coking at burner hearth, high temperature convection heating surface, middle temperature convection heating surface and low temperature convection heating surface, stain phenomenon.The main feature of accurate eastern coal coking, contamination problem is:
(1.) distributed areas are extensive, serious coking has all occured or stain phenomenon along each section of burning (flue gas) stroke heating surface;
(2.) use in the accurate eastern coal process, the heating surface position of the generation coking of different power plant and contamination is different;
(3.) use accurate eastern coal burning boiler majority and the characteristics that coking is facingd the wind growth, developed occur.
At present, the major way that solves accurate eastern coal slagging scorification and fouling characteristics is to mix burning.Power plant has summed up a series of measure through practice, and for example: improve the coal blending mode, burner reconstruction is added deslagging agent, optimizes and revises burning etc., and the dust stratification that slows down heating surface stains, and improves simultaneously mixing of accurate eastern coal and burns ratio.But this does not fundamentally solve slagging scorification, the contamination problem of the accurate eastern coal of burning.Current stage, in the boiler structure design, also there is not effective way to solve the problem that heating surface stains dust stratification.
The utility model content
The purpose of this utility model is to stain serious coal-burning boiler for the high temperature convection heating surface, proposes a kind of new boiler flue structure.
The technical solution of the utility model is as follows:
A kind of boiler flue structure is characterized in that described flue comprises the first flue, the second flue and back-end ductwork.Be the water-cooling wall partition wall between the first flue and the second flue, the first flue is communicated with into a U-shaped passage with the second flue by ash bucket, and the bottom of ash bucket is provided with flapper; In the first flue, arrange high temperature reheater, in the second flue, arrange finishing superheater, arrange low-temperature reheater and economizer in the back-end ductwork.
High temperature reheater described in the technique scheme and finishing superheater all adopt crust block formula structure, coarse pitch arrangement.
The utlity model has following advantage and outstanding effect: the design of U-shaped passage, prolonged the time that high-temperature flue gas contacts with heating surface on the one hand, can effectively slow down the dust stratification of back-end ductwork heating surface; Be beneficial on the other hand separately high-temperature surface is carried out the dust stratification cleaning.The ash bucket of U-shaped channel bottom is the reversal chamber of flue gas circulation, can be used for again ash deposition.The flapper that is arranged in the ash bucket bottom is regularly opened, and gets rid of the dust stratification in the ash bucket.The metallic surface temperature of crust block formula heating surface is generally 500~600 ℃, and flue gas temperature of hearth outlet is 800~1200 ℃, gaseous state in the high-temperature flue gas or molten metal compound run into the low metal surface meeting condensation of temperature, adhere to simultaneously the thin ash particle in the flue gas, form gradually dust stratification.The design of crust block heating surface is beneficial to and forms the equal dust stratification that distributes, and prevents because thermal resistance is uneven, causes the working medium heat absorption uneven.The arrangement of coarse pitch can effectively reduce fouling of heating surface to the impact of flue gas circulating resistance, reduces the increase of fan energy consumption.
Description of drawings
A kind of boiler flue structural representation that Fig. 1 provides for the utility model.
Fig. 2 arranges schematic diagram (top view) for the U-shaped passage heating surface that the utility model provides.
Crust block formula heating surface front view in the U-shaped passage that Fig. 3 provides for the utility model.
Fig. 4 is the top view of Fig. 3.
Among the figure: 1-the first flue; 2-the second flue; The 3-ash bucket; The 4-flapper; The 5-high temperature reheater; 6-water-cooling wall partition wall; The 7-finishing superheater; The 8-back-end ductwork; The 9-low-temperature reheater; The 10-economizer.
The specific embodiment
Stain serious problem in order to solve the boiler high temperature convection heating surface, the utility model proposes a kind of new boiler flue structural design.Further specify embodiment of the present utility model below in conjunction with accompanying drawing.
A kind of boiler flue structural representation that Fig. 1 provides for the utility model, as shown in Figure 1, described flue comprises the first flue 1, the second flue 2 and back-end ductwork 8.Be water-cooling wall partition wall 6 between the first flue 1 and the second flue 2, the two is communicated with into a U-shaped passage by ash bucket 3, in the first flue 1, arrange high temperature reheater 5, in the second flue 2, arrange finishing superheater 7, arrange low-temperature reheater 9 and economizer 10 in the back-end ductwork 8.The bottom of ash bucket 3 is provided with flapper 4.The high temperature reheater 5 and the finishing superheater 6 that are arranged in the described U-shaped passage all adopt crust block formula structure, coarse pitch arrangement.
During boiler operatiopn, flue gas is flowed through successively and is arranged in high temperature reheater 5 in the first flue 1, is arranged in the finishing superheater 7 in the second flue 2, is arranged in low-temperature reheater 9 and economizer 10 in the back-end ductwork 8.U-shaped channel bottom is provided with ash bucket 3, is the reversal chamber of flow of flue gas, can be used for again the dust stratification deposition.Ash bucket 3 bottoms are provided with flapper 4, regularly open flapper 4, remove the dust stratification in the ash bucket 3.
As shown in Figure 2, the heating surface in the U-shaped passage all adopts the coarse pitch arrangement, to reduce fouling of heating surface to the impact of flow of flue gas resistance, reduces the increase of fan energy consumption.
Shown in Fig. 3 and 4, the heating surface in the U-shaped passage all adopts crust block formula structure, and namely pipe adds the Welding Structure of band steel.During operation, the temperature of crust block formula heating surface is 500~600 ℃, and furnace outlet (separator outlet) flue-gas temperature is 800~1200 ℃.Smoke gas flow is when cold heating surface, and the gaseous state in the flue gas or molten metal compound condense on the tube wall, and tiny can also being adhered to gradually on the tube wall by particle in the flue gas forms dust stratification.Crust block formula heating surface is beneficial to and forms the dust stratification that is evenly distributed, and reduces because the interior working medium heat absorption of the heating surface that the dust stratification skewness causes is uneven.Simultaneously, can also alleviate the dust stratification of heating surface in the back-end ductwork 8.
Suitable adjustment can be carried out according to concrete heating power result of calculation in the size of boiler heating surface, arrangement and installation site when boiler design.This flue structure is not only applicable to pulverized-coal fired boiler, and is applicable to CFBB.

Claims (2)

1. boiler flue structure, it is characterized in that: described flue structure comprises the first flue (1), the second flue (2) and back-end ductwork (8); Be provided with water-cooling wall partition wall (6) between the first flue (1) and the second flue (2), the first flue is communicated with into a U-shaped passage with the second flue by ash bucket (3), and the bottom of ash bucket (3) is provided with flapper (4); In the first flue (1), arrange high temperature reheater (5), in the second flue (2), arrange finishing superheater (7); Arrange low-temperature reheater and economizer in the described back-end ductwork.
2. a kind of boiler flue structure as claimed in claim 1, it is characterized in that: described high temperature reheater (5) and finishing superheater (7) all adopt crust block formula structure, coarse pitch arrangement.
CN 201220535255 2012-10-18 2012-10-18 Boiler flue structure Expired - Lifetime CN202884875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220535255 CN202884875U (en) 2012-10-18 2012-10-18 Boiler flue structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220535255 CN202884875U (en) 2012-10-18 2012-10-18 Boiler flue structure

Publications (1)

Publication Number Publication Date
CN202884875U true CN202884875U (en) 2013-04-17

Family

ID=48076299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220535255 Expired - Lifetime CN202884875U (en) 2012-10-18 2012-10-18 Boiler flue structure

Country Status (1)

Country Link
CN (1) CN202884875U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913891A (en) * 2012-10-18 2013-02-06 清华大学 Boiler flue structure
CN107559804A (en) * 2017-09-19 2018-01-09 深圳市能源环保有限公司 A kind of garbage burning boiler superheater system
CN108036298A (en) * 2017-12-21 2018-05-15 深圳市能源环保有限公司 A kind of garbage burning boiler steam reheat system
CN108534119A (en) * 2018-06-19 2018-09-14 哈尔滨锅炉厂有限责任公司 One kind using the accurate eastern coal 660MW tangential firing super critical boilers in Xinjiang
CN109630998A (en) * 2018-11-23 2019-04-16 东方电气集团东方锅炉股份有限公司 A kind of high parameter waste heat boiler suitable for refuse incineration grate furnace
WO2019119384A1 (en) * 2017-12-21 2019-06-27 深圳市能源环保有限公司 Steam reheating system for rubbish incineration furnace
CN110006052A (en) * 2019-03-22 2019-07-12 东方电气集团东方锅炉股份有限公司 A kind of waste incineration afterheat utilizing system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913891A (en) * 2012-10-18 2013-02-06 清华大学 Boiler flue structure
CN107559804A (en) * 2017-09-19 2018-01-09 深圳市能源环保有限公司 A kind of garbage burning boiler superheater system
CN108036298A (en) * 2017-12-21 2018-05-15 深圳市能源环保有限公司 A kind of garbage burning boiler steam reheat system
WO2019119384A1 (en) * 2017-12-21 2019-06-27 深圳市能源环保有限公司 Steam reheating system for rubbish incineration furnace
CN108534119A (en) * 2018-06-19 2018-09-14 哈尔滨锅炉厂有限责任公司 One kind using the accurate eastern coal 660MW tangential firing super critical boilers in Xinjiang
CN109630998A (en) * 2018-11-23 2019-04-16 东方电气集团东方锅炉股份有限公司 A kind of high parameter waste heat boiler suitable for refuse incineration grate furnace
CN110006052A (en) * 2019-03-22 2019-07-12 东方电气集团东方锅炉股份有限公司 A kind of waste incineration afterheat utilizing system

Similar Documents

Publication Publication Date Title
CN202884875U (en) Boiler flue structure
CN205403139U (en) Low nitrogen buggy boiler
CN102563688A (en) Boiler thermodynamic system for burning fuel with low ash melting point and high sodium-potassium content
CN102840592A (en) Low-temperature smoke recirculation system
CN102913891A (en) Boiler flue structure
CN204063078U (en) A kind of coal-burning boiler vertical well gas flue and coal-burning boiler
CN204042866U (en) Biomass boiler burner
CN100434798C (en) Internally circulating fluidized reburning device for fly ash based on high temperature separation
CN203478209U (en) Double-low type boiler capable of cleanly combusting high-alkali-metal coal
CN205048409U (en) Improved generation gas boiler structure
CN101881456A (en) Circulating fluid bed domestic garbage burning electricity generation boiler
CN104595894A (en) System and method for solving high-sodium coal combustion contamination by low-wall-temperature heat exchange surface
CN103398371B (en) A kind of two low type boiler using high basic metal coal
CN202884905U (en) Local oxygen-enriched combustion transformation system for conventional circulating fluidized bed boiler with external bed
CN202733916U (en) Burning dregs fluidized bed boiler
CN104654266A (en) Water boiler with single boiler barrel and four return strokes
CN204345904U (en) Biomass chain boiler row boiler
CN203147745U (en) Integrated hearth and flue biomass fluidized bed boiler
CN209541168U (en) Coal dust organic heat carrier furnace in bulk
CN203478218U (en) Compact type circulating fluidized bed boiler capable of cleanly combusting high-sodium coal
CN204460190U (en) A kind of low wall temperature heat-transfer surface solves the system that high sodium coal combustion stains
CN207113682U (en) A kind of high-efficiency and energy-saving type phase-change heat-exchanger
CN203148032U (en) Efficient pulverized-coal-fired molten salt furnace
CN204786364U (en) Fire coal fired boiler
CN105972569B (en) Supplementary fired Waste Heat Boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130417