CN202882456U - Ring beam structure newly arranged at bottom of construction floorslab - Google Patents
Ring beam structure newly arranged at bottom of construction floorslab Download PDFInfo
- Publication number
- CN202882456U CN202882456U CN 201220530577 CN201220530577U CN202882456U CN 202882456 U CN202882456 U CN 202882456U CN 201220530577 CN201220530577 CN 201220530577 CN 201220530577 U CN201220530577 U CN 201220530577U CN 202882456 U CN202882456 U CN 202882456U
- Authority
- CN
- China
- Prior art keywords
- floorslab
- building
- collar tie
- tie beam
- ring beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a ring beam structure newly arranged at the bottom of a construction floorslab. A ring beam (5) is arranged at the connection position between a wall body (1) of a building and a floorslab (2), at the bottom of the floorslab (2) and along the wall body (1). The ring beam (5) is connected with the floorslab (2) through fillings inside more than two pouring troughs (3) arranged in one row. A clumpy decoration layer (4) which can cover the pouring troughs (3) is arranged on the upper portion of the floorslab (2). According to the ring beam structure newly arranged at the bottom of the construction floorslab, by newly arranging the ring beam on the bottom of the construction floorslab, the anti-seismic property of the original building is strengthened and improved. The problem that time and efforts are wasted when a ring beam is additionally arranged on the bottom of an original floorslab is resolved. The strengthening effect is improved obviously. Due to the fact that the new strengthening component can be connected with the original building closely and can be stressed together with the original building, the problem of stress lagging is resolved. Through the method that grooves are arranged in the floorslab and steel bars are arranged in the grooves, the construction problem that concrete is not easy to be cast in the ring beam additionally arranged on the bottom of the original floorslab is resolved. The traditional construction process is improved, efficiency is improved and cost is further reduced.
Description
Technical field
The utility model relates to a kind of collar tie beam structure of newly establishing in the building floor bottom, belongs to the extraordinary technical field of construction of building.
Background technology
Collar tie beam is around the skin and the beam of the continuous sealing that cross wall arranges in the part, its objective is for the integral rigidity that strengthens building and the stability of wall body.Collar tie beam can reduce gene basis differential settlement or larger vibration load to adverse effect and the caused wall body cracking thereof of building.In the area of providing fortification against earthquakes, utilize collar tie beam reinforcement walls body to seem more necessary.Reinforcing the anti-seismic performance that improves original building at the newly-increased collar tie beam of floor slab bottoms, is one technical barrier in the strengthening construction process.Because the young concrete collar tie beam is not only time-consuming at the bottom of the plate, and can not the fine while stressed with original structure.Adopt constructional materials, the construction quality of high-quality strictly to control in no matter constructing, all can not obtain good effect.Therefore practice is restricted, usually replaced by reinforcing pull rod, yet the performance of reinforcing pull rod is far away from reinforced concrete circle beam.
Why traditional construction technology is difficult for construction, poor effect, reason have following some:
At first, newly-increased concrete collar tie beam is difficult for building at the bottom of the plate, and common practices is: method one is after assembling reinforcement, staying the slit above the template and between the floor slab bottoms, chinky altitude is greater than the vibrating head diameter, through the slit in the template concreting, vibrate, artificial plug is filled out this top, slit more afterwards.Method two is after assembling reinforcement, and sidepiece stays " infundibulate " to build groove above template, through the slit in the template concreting, vibrate, manually after form removal reject unnecessary infundibulate concrete.Although these two kinds of methods can both be finished building of newly-increased concrete collar tie beam at the bottom of the plate, constructor's technical ability is had relatively high expectations, and when relatively taking a lot of work.
Secondly, adopt artificial stuff up a crack or reservation infundibulate groove mode to construct, newly-increased member closely is connected with original building, the common stressed effect of the old and new's member is not good, and stress lags behind, and affects consolidation effect.
Along with improving constantly of China's economic level, building aseismicity is required also more and more to pay attention to, especially in emphasis such as transforming old hospital, old teaching building is set up defences building, depend merely on reinforcing pull rod and can not satisfy shockproof requirements.Therefore need to consider a kind of construction measure that newly-increased concrete collar tie beam is reinforced at the bottom of plate, can not only significantly improve the house performance, can also improve conventional practice, raise the efficiency.
Summary of the invention
The purpose of this utility model is, a kind of collar tie beam structure of newly establishing in the building floor bottom is provided, and this structure can be combined with the original building close structure, improves consolidation effect, and is easy to construction.
The technical solution of the utility model: for realizing the purpose of this utility model, a kind of collar tie beam structure of newly establishing in the building floor bottom of the present utility model, comprise body of wall and floor, wherein, be positioned at floor slab bottoms in described body of wall and floor junction and be provided with collar tie beam along body of wall, collar tie beam links to each other with floor by the charges of building in the groove of layout in a row more than two, and arranges and can will build the decorative layer of the one-tenth piece of groove covering on floor top.
Further, the above-mentioned collar tie beam structure of newly establishing in the building floor bottom, wherein, the described groove of building is of a size of 200mm * 300mm.
Further, above-mentioned collar tie beam structure of newly establishing in the building floor bottom, wherein, described spacing of building between adjacent two of the groove is 600mm.
Further, the above-mentioned collar tie beam structure of newly establishing in the building floor bottom, wherein, described charges are pea gravel concreten or grouting material.
Again further, the above-mentioned collar tie beam structure of newly establishing in the building floor bottom wherein, is provided with steel fabric sheet or anti-crack fiber cloth in the described decorative layer.
Compared with prior art, collar tie beam structure of newly establishing in the building floor bottom of the present utility model is by reinforcing the anti-seismic performance that improves original building at the newly-increased collar tie beam of floor slab bottoms, increase time-consuming, the problem of taking a lot of work of collar tie beam newly at the bottom of solving conventional panels, and consolidation effect is significantly promoted, and new strenthening member and original building are combined closely, jointly stressed, solve stress and lag behind; Solve newly-increased plate foundation ring beam by plate internal recessing and the method that reinforcing bar is set and be difficult for the placing of concrete construction problem, improve traditional construction technology, raise the efficiency; Reduce irregular template materials amount and reinforce the rear unnecessary concrete recruitment amount of rejecting, reduce cost.Compare not only time and labour saving with conventional construction, and satisfy with original structure jointly stressed, the requirement of integrality performance of the structure enhancing.
Description of drawings
Fig. 1 is the structural representation that the utility model is applied to Bars In Poured Concrete Slab;
Fig. 2 is the structural representation that the utility model is applied to precast channel slab;
Fig. 3 is the structural representation that the utility model is applied to precast hollow slab;
Fig. 4 is the top view of Fig. 1, Fig. 2 and Fig. 3.
Description of reference numerals: the 1-body of wall, the 2-floor, 3-builds groove, 4-decorative layer, 5-collar tie beam, 6-beam.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
Usually floor 2 is divided into Bars In Poured Concrete Slab, precast channel slab and precast hollow slab, collar tie beam structure of newly establishing in the building floor bottom of the present utility model can be used these three kinds of floors 2, see Fig. 1, Fig. 2 and Fig. 3, what these three figure showed is the structural representation that the utility model is applied to respectively these three kinds of plates.Something in common in three kinds of situations is it all is to be positioned at floor 2 bottoms in body of wall 1 and floor 2 junctions to be provided with collar tie beam 5 along body of wall 1, collar tie beam 5 links to each other with floor 2 by the charges of building in the groove 3 of layout in a row more than two, and arranges and can will build the decorative layer 4 of the one-tenth piece of groove 3 coverings on floor 2 tops.Build groove 3 and be of a size of 200mm * 300mm, two adjacent spacings of building groove 3 are 600mm.See Fig. 4, newly-increased collar tie beam 5 in floor 2 arranged beneath, and is connected to form whole to increase bearing capacity and stability with the beam 6 on both sides along body of wall 1.Build groove 3 and be evenly arranged in floor 2 near the position of body of wall 1, collar tie beam 5 is hung below floor with the reinforcing bar of collar tie beam 5 interior settings by building groove 3, like this collar tie beam 5 and build charges groove 3 in build finish after, collar tie beam 5 is embedded into and forms integral body in the floor 2 by building charges in the groove 3.
The charges of building in the groove 3 are pea gravel concreten or grouting material, can make to build groove 3 and be connected the strengthen effect with the close structure of former floor 2.Be provided with steel fabric sheet or anti-crack fiber cloth in the decorative layer 4, and carry out surface plastering and decoration, to avoid having influence on ground, upper strata outward appearance.
During the utility model construction, on floor 2, offer the plural groove 3 of building along the layout circuit of collar tie beam 5 is in a row, cracking resistance reinforcing bar in collar tie beam 5 reinforcing bars and the plate is set building groove 3 bottoms, then in building groove 3 perfusion pea gravel concreten or structure grouting material as charges; After charges solidify, cracking resistance steel fabric sheet or anti-crack fiber cloth are set building groove 3 upper plate faces, do at last incrustation.
Embodiment 1:
The utility model increases the job practices of collar tie beam newly at the bottom of Bars In Poured Concrete Slab: open to build to establish at cast-in-place edges of boards and build groove 3, but do not destroy former reinforcing bar, cleaning is built groove 3; Set up template, colligation ring beam reinforcing steel bar, build newly-increased collar tie beam 5 and pea gravel concreten or the grouting material of building in the groove 3, tamping; Decorative layer 4 is laid reinforced mesh, mortar plastering and ground decoration.
Embodiment 2:
The utility model increases the job practices of collar tie beam newly at the bottom of precast channel slab: offer on the precast channel slab limit and build groove 3, but do not destroy former reinforcing bar and prefabricated rib of slab, cleaning is built groove 3; Set up template, colligation ring beam reinforcing steel bar, build newly-increased collar tie beam 5 and pea gravel concreten or the grouting material of building in the groove 3, tamping; Decorative layer 4 is laid reinforced mesh, mortar plastering and ground decoration.
Embodiment 3:
The utility model increases the job practices of collar tie beam newly at the bottom of precast channel slab: offer at the precast hollow edges of boards and build groove 3, do not destroy former reinforcing bar; Place, circular cavity in precast hollow slab sets up stiffener, and cleaning is built groove 3; Set up template, colligation ring beam reinforcing steel bar, build newly-increased collar tie beam 5 and pea gravel concreten or the grouting material of building in the groove 3, tamping; Decorative layer 4 is laid reinforced mesh, mortar plastering and ground decoration.
Certainly, more than be concrete exemplary applications of the present utility model, the utility model also has other embodiment, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop within the desired protection domain of the utility model.
Claims (5)
1. collar tie beam structure of newly establishing in building floor bottom, comprise body of wall (1) and floor (2), it is characterized in that: be positioned at floor (2) bottom in described body of wall (1) and floor (2) junction and be provided with collar tie beam (5) along body of wall (1), collar tie beam (5) links to each other with floor (2) by the charges of building in the groove (3) of layout in a row more than two, and arranges and can will build the decorative layer (4) of the one-tenth piece of groove (3) covering on floor (2) top.
2. collar tie beam structure of newly establishing in building floor bottom according to claim 1, it is characterized in that: the described groove (3) of building is of a size of 200mm * 300mm.
3. collar tie beam structure of newly establishing in building floor bottom according to claim 1 and 2 is characterized in that: described spacing of building between adjacent two of the groove (3) is 600mm.
4. collar tie beam structure of newly establishing in building floor bottom according to claim 1, it is characterized in that: described charges are pea gravel concreten or grouting material.
5. collar tie beam structure of newly establishing in the building floor bottom according to claim 1 is characterized in that: be provided with steel fabric sheet or anti-crack fiber cloth in the described decorative layer (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220530577 CN202882456U (en) | 2012-10-17 | 2012-10-17 | Ring beam structure newly arranged at bottom of construction floorslab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220530577 CN202882456U (en) | 2012-10-17 | 2012-10-17 | Ring beam structure newly arranged at bottom of construction floorslab |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202882456U true CN202882456U (en) | 2013-04-17 |
Family
ID=48073897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220530577 Expired - Fee Related CN202882456U (en) | 2012-10-17 | 2012-10-17 | Ring beam structure newly arranged at bottom of construction floorslab |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202882456U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774860A (en) * | 2012-10-17 | 2014-05-07 | 贵州中建建筑科研设计院有限公司 | Floor-bottom added ring beam structure and construction method |
CN105756362A (en) * | 2015-05-27 | 2016-07-13 | 杭州固特建筑加固技术工程有限公司 | Method for controlling cracking by carrying out grouting reinforcement on thin-walled structures in building |
-
2012
- 2012-10-17 CN CN 201220530577 patent/CN202882456U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103774860A (en) * | 2012-10-17 | 2014-05-07 | 贵州中建建筑科研设计院有限公司 | Floor-bottom added ring beam structure and construction method |
CN105756362A (en) * | 2015-05-27 | 2016-07-13 | 杭州固特建筑加固技术工程有限公司 | Method for controlling cracking by carrying out grouting reinforcement on thin-walled structures in building |
CN105756362B (en) * | 2015-05-27 | 2018-01-09 | 杭州固特建筑加固技术工程有限公司 | The method that consolidation by grouting control cracking is carried out to the thin-wall construction in building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924711B (en) | The construction technology of assembling grillage shear wall structural system | |
CN104264862B (en) | 3D printing reinforcement masonry shear wall structure and construction method thereof | |
CN206070562U (en) | Subassembly formula underground structure | |
CN103290967B (en) | A kind of multi-ribbed hollow composite floor slab and manufacture method | |
CN204676609U (en) | The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape | |
CN110359631A (en) | Secondary structure Constructional Col-umn Construction method | |
CN101629423A (en) | Method for rigidly plugging overlength and ultra-thick block concrete foundation and board post poured band | |
CN103590486B (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
CN106968381A (en) | With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection | |
CN104727440B (en) | Industrialized production efficiently-assembled type building frame column beam and manufacturing method | |
CN106930431A (en) | A kind of combined type cavity EPS modules | |
CN202882456U (en) | Ring beam structure newly arranged at bottom of construction floorslab | |
CN103615007A (en) | Construction method for pouring basement exterior wall and bottom plate simultaneously | |
CN206328863U (en) | Prefabricated assembled frame beam column structure | |
CN103774860A (en) | Floor-bottom added ring beam structure and construction method | |
CN205669211U (en) | A kind of prefabricated Gravity Retaining Wall | |
CN106836592A (en) | Overlapped hollow floor system after partial precast assembled | |
CN203654562U (en) | Assembled type tooth-shaped composite floor slab | |
CN207110035U (en) | Assembled steel tendon concrete frame structure based on steel plate connection joint | |
CN203296208U (en) | Pouring hole non-mortar reinforcing bar building block brickwork shear wall | |
CN109057101A (en) | The method of construction and exterior wall of support construction and exterior wall | |
CN103774758A (en) | Connecting method and connecting structure for box-type steel pipe column and shear wall end post | |
CN109505422B (en) | Reinforcing method for ancient building wall | |
CN207700206U (en) | A kind of concrete self-balancing side mould of building construction cushion cap | |
CN203782950U (en) | Sloping roof gradient structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130417 Termination date: 20151017 |
|
EXPY | Termination of patent right or utility model |