CN202865976U - Intelligent multifunctional comprehensive sewer - Google Patents
Intelligent multifunctional comprehensive sewer Download PDFInfo
- Publication number
- CN202865976U CN202865976U CN2012206086765U CN201220608676U CN202865976U CN 202865976 U CN202865976 U CN 202865976U CN 2012206086765 U CN2012206086765 U CN 2012206086765U CN 201220608676 U CN201220608676 U CN 201220608676U CN 202865976 U CN202865976 U CN 202865976U
- Authority
- CN
- China
- Prior art keywords
- sewer
- pipe
- cover plate
- cavity
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/20—Controlling water pollution; Waste water treatment
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses an intelligent multifunctional comprehensive sewer and belongs to urban public facilities. The intelligent multifunctional comprehensive sewer comprises a main sewer line and a plurality of branch sewer lines. A cover plate is arranged on the lower portion of an inner cavity of the sewer body, and a cavity above the cover plate is a rainwater channel. An automatic floodgate device is arranged on the main sewer line, an automatic strong drainage system is arranged at a water outlet of the main sewer line, settling ponds are arranged under joints of the main sewer line and each branch sewer line, and hanging baskets for storing warp are arranged in the settling ponds. Frame filters are arranged at water inlets of the branch sewer lines. A monitoring alarm system capable of reflecting the running state of the sewer is arranged. The intelligent multifunctional comprehensive sewer has the advantages that the problems that each municipal corporation works on their own and waste of labor power, material resources and working hours are produced due to repeated construction are solved, drainage in the waterlogging and storage in the drought are achieved indeed, and standardization, simplification, automation and intellectualization of municipal construction and management can be achieved.
Description
Technical field
The utility model relates to the comprehensive sewer of a kind of intelligent multifunction, belongs to urban public utilities.
Background technology
Sewer is an important communal facility in city, and its function height and managerial skills determine the performance of its function and efficient.At present, China city is original and at the sewer of building, and the defective of existence is that bore is little, function singleness, backward in management.On the other hand, in current Process of Urban Development, municipal all departments all do things in his own way, repeat construction, like this, not only cause the waste of a large amount of human and material resources, and, since in work progress random cloth underground utilities, heavy damage on the ground and underground environment.Moreover existing sewer can not play one's part to the full when running into the natural calamity such as heavy showers, usually causes casualties and a large amount of economic losses because of impeded drainage etc.
Summary of the invention
The purpose of this utility model provides the comprehensive sewer of a kind of intelligent multifunction, to solve above-mentioned technical problem.
For addressing the above problem, the technical scheme that the utility model adopts is:
The comprehensive sewer of a kind of intelligent multifunction, comprise main sewer pipe and some sewer pipes that is connected on the main sewer pipe, described main sewer pipe and a sewer pipe all are that the internal diameter that adopts is the sewer integrated pipe of 3-6 rice, described sewer integrated pipe comprises body, the bottom of described tube cavity is provided with cover plate, be provided with several branch pipe(tube)s in the cavity of described cover plate below, the cavity of described cover plate top is rain water channel; It is characterized in that: be provided with the automatic flood discharge valve system on the described main sewer pipe, but described automatic flood discharge valve system comprises the float switch of the gate of main rain water channel in the slit shearing master sewer pipe, the elevating mechanism of regulating gate lifting, the drive motors that drives elevating mechanism and the action of control drive motors; Described float switch is arranged in the main rain water channel.
Say further:
The outfall place of described main sewer pipe is provided with automatic powerful flood drainage system; Described automatic powerful flood drainage system comprises latent well, drainage pump, is used for driving the drainage pump motor of drainage pump, and the automatic floating ball switch of control drainage pump motor action; Described latent well is arranged on outfall one side of main sewer pipe, and connects with main sewer pipe; The middle and upper part of described latent well is provided with the support for carrying drainage pump and drainage pump motor, and the distance of the highest rainwater liquid level is 30cm in described support and the latent well; Described automatic floating ball switch is rack-mount, and is connected with the drainage pump motor; The mouth place, top of described latent well is provided with latent manhole cover plate; The top mouth 30cm above ground level of described latent well.
The below of described main sewer pipe and each sewer pipe joint is provided with sedimentation basin, is provided with the hanging basket for the storage deposit in the described sedimentation basin, and the bottom of described hanging basket is provided with the hanging basket pressure sensor; Be provided with the passage that can hold cage lifting directly over the described sedimentation basin; The top mouth of described passage is provided with sewer cover plate.
The water inlet of described each sewer pipe all is provided be used to the plate filter that stops foreign material, is provided with on the described plate filter to monitor the D.C. resistance sensor that foreign material block the sheet frame filter area; The top of described plate filter is installed in the top of the water inlet of a sewer pipe by hinge; The bottom of described plate filter is connected with pulling rope, and the other end of pulling rope is wound on the hand elevator wheel; Described hand elevator wheel is fixed on the top of adjacent sewer pipe; The top of described hand elevator wheel is provided with cover plate.
The inner cavity top of described body is fixed be used to the wire clamp that grips the communications cable, electric power cable, network cable, monitoring cable.
Described branch pipe(tube) is respectively water supply pipe, heating power admission line, heating power return-air duct, gas pipeline and sewage conduct.
The below of described cover plate is symmetrically arranged with left divider wall, right divider wall; The cavity of described cover plate below is divided into left cavity, middle chamber and right cavity by left divider wall and right divider wall; Described sewage conduct is arranged in the middle chamber; Described water supply pipe and heating power admission line are arranged in the left cavity; Described heating power return-air duct and gas pipeline are arranged in the right cavity; Described cover plate is divided into three parts, is respectively to cover left cover at left cavity top, cover at the inter panel at middle chamber top and cover right cover plate at right cavity top.
Be provided with the first backup line in the described left divider wall, be provided with the second backup line in the described right divider wall.
The comprehensive sewer of described intelligent multifunction also is provided with the monitoring and alarming system that can reflect in real time the sewer running status; Described monitoring and alarming system comprises the infrared pick-up head that is installed in the tube cavity, be installed in pipe pressure sensor in each branch pipe(tube), be arranged on the display screen of municipal sector, and each hanging basket pressure sensor and each D.C. resistance sensor; The number of described infrared pick-up head and pipe pressure sensor is some, is evenly distributed in the tube cavity; Described infrared pick-up head, pipe pressure sensor, hanging basket pressure sensor and D.C. resistance sensor are connected with display screen respectively.
Owing to having adopted technique scheme, compared with prior art, having the utlity model has following advantage:
1, as the sewer integrated pipe of sewer main body, the top of its inner chamber is provided with the wire clamp for clamping and fixing various cables, and the bottom is provided with water supply pipe, heating power admission line, heating power return-air duct and gas pipeline etc.When urban construction, only need one-off construction, be embedded in sewer integrated pipe described in the utility model underground, municipal corporation be can thoroughly solve and human and material resources that construction causes and the waste in man-hour done things in his own way, repeat, and the high drawback of maintenance cost, and then the process of quickening urban construction;
2, be provided with the collection rain water channel in the inner cavity of pipe, being not easy to produce alluvial in this passage stops up, and internal diameter of the pipeline is large, even partly precipitated is arranged, energy mechanical chipping, add the automatic flood drainage system that is arranged on main sewer pipe outfall place, can thoroughly solve the drain off floodwaters difficult problem of current city when heavy showers.And this rain water channel also has water storage function, and the rainwater of accumulating can be used for urban fire control fire extinguishing, cleans the street, the pouring flowers and plants are standby etc., and limited water resource is fully used, and can arrange when really accomplishing to waterlog, and can hold when non-irrigated.
3, also be provided with the monitoring and alarming system that can reflect in real time the sewer running status, in case break down or occur damaging, the staff can find the position of breaking down or occurring damaging by described monitoring and alarming system in the very first time, the fault in-situ so that the maintainer arrives in the very nick of time is repaired fault or damaged location.Can thoroughly solve government to the passive situation of municipal administration, really make urban construction and management reach standardization, simplification, automation and intellectuality.
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Description of drawings
Fig. 1 is the connection diagram of main sewer pipe described in the utility model and a sewer pipe;
Fig. 2 is the structural representation of sewer integrated pipe described in the utility model;
Fig. 3 is the structural representation of automatic flood discharge valve system described in the utility model;
Fig. 4 is the structural representation of automatic flood drainage system described in the utility model;
Fig. 5 is the structural representation of sedimentation basin described in the utility model;
Fig. 6 is the structural representation of plate filter described in the utility model.
The specific embodiment
Embodiment:
With reference to Fig. 1, the comprehensive sewer of intelligent multifunction described in the utility model, comprise main sewer pipe A and some sewer pipe B who is connected on the main sewer pipe A, described main sewer pipe A and a sewer pipe B are that the internal diameter that adopts is the sewer integrated pipe of 3-6 rice.
With reference to Fig. 2, described sewer integrated pipe comprises body, comprises that the internal diameter that adopts the reinforced concrete material to make is the body 1 of 3-6 rice.The bottom of described body 1 inner chamber is provided with cover plate, is provided with several branch pipe(tube)s in the cavity of described cover plate below, and the cavity of described cover plate top is rain water channel 14.The inner cavity top of described body 1 is fixed be used to the wire clamp 15 that grips the communications cable, electric power cable, network cable, monitoring cable.Described branch pipe(tube) is respectively water supply pipe 12, heating power admission line 11, heating power return-air duct 5, gas pipeline 4 and sewage conduct 8.The below of described cover plate is symmetrically arranged with left divider wall 10, right divider wall 6.The cavity of described cover plate below is divided into left cavity, middle chamber and right cavity by left divider wall 10 and right divider wall 6.Described sewage conduct 8 is arranged in the middle chamber; Described water supply pipe 12 and heating power admission line 11 are arranged in the left cavity; Described heating power muffler 5 and gas pipeline 4 are arranged in the right cavity.Described cover plate is divided into three parts, is respectively to cover left cover 13 at left cavity top, cover at the inter panel 2 at middle chamber top and cover right cover plate 3 at right cavity top.Be provided with the first backup line 9 in the described left divider wall 10, be provided with the second backup line 7 in the described right divider wall 6.
With reference to Fig. 3, be provided with the automatic flood discharge valve system on the described main sewer pipe A.But described automatic flood discharge valve system comprises the float switch A2 of gate A3, the elevating mechanism A4 of regulating gate A3 lifting, the drive motors A5 that drives elevating mechanism A4 and the control drive motors A5 action of main rain water channel A1 in the slit shearing master sewer pipe A; Described float switch A2 is a kind of principle of utilizing gravity and buoyancy, conducting or cut-off path, thereby the device in on-off circuit or water route, and it is arranged in the main rain water channel A1.When construction, described automatic flood discharge valve system is arranged in one of them longitudinal bracing body of waiting pavilion at bus station.When certain altitude that the rainwater water level accumulated in the main rain water channel A1 rises, under the buoyancy of water effect, float switch A2 connects drive motors A5 automatically, and drive motors A5 carries out flood discharge by driving the elevating mechanism A4 lift gate A3 that makes progress; When the water level of rainwater in the main rain water channel A1 drops to certain depth, float switch A2 controls drive motors A5 counter-rotating, and then drives elevating mechanism A4 drive gate A3 decline, stops flood discharge, carry out retaining, for urban fire control fire extinguishing, cleaning street and pouring flowers and plants are prepared enough the water source.
With reference to Fig. 4, the outfall A7 place of described main sewer pipe A is provided with automatic powerful flood drainage system.Described automatic powerful flood drainage system comprises dive well A8, drainage pump A12, is used for driving the drainage pump motor A10 of drainage pump A12, and the automatic floating ball switch A9 of control drainage pump motor A10 action.Described latent well A8 is arranged on outfall A7 one side of main sewer pipe, and connects with main sewer pipe A.The middle and upper part of described latent well A8 is provided with the support for carrying drainage pump A12 and drainage pump motor A10, and the distance of the highest rainwater liquid level is 30cm in described support and the latent well A8.Described automatic floating ball switch A9 is rack-mount, and is connected with drainage pump motor A10.The mouth place, top of described latent well A8 is provided with the manhole cover plate A11 that dives.The top mouth 30cm above ground level of described latent well A8 is in case ground water enters from the top mouth of the well A8 that dives.When running into heavy showers, when the flood discharge capacity of outfall A7 did not reach, the water level in the well A8 that dives will rise, and under the buoyancy of water effect, the automatic floating ball switch starts drainage pump A12 automatically, carries out brute force and drains off floodwaters; When the water level in the well A8 that dives drops to automatic floating ball switch A9 and does not reach liquid level, drainage pump A12 autostop.
With reference to Fig. 5, the below of described main sewer pipe A and each sewer pipe B joint is provided with sedimentation basin B4, is provided with the hanging basket B3 for the storage deposit in the described sedimentation basin B4, and described hanging basket B3 is stainless steel micropore hanging basket.The bottom of described hanging basket B3 is provided with hanging basket pressure sensor B5; Be provided with the channel B 1 that to hold hanging basket B3 lifting directly over the described sedimentation basin B4; The top mouth of described channel B 1 is provided with sewer cover plate B2.When the deposit way constant weight in the hanging basket B3, hanging basket pressure sensor B5 automatic alarm, particular location is presented on the municipal giant-screen, municipal administration department in time sends the staff to the scene according to warning message, opens sewer cover plate B2, with the crane hanging basket B3 that slings, pour on the garbage truck, again hanging basket B3 is put back to original position, build sewer cover plate B2 and get final product.
With reference to Fig. 6, the water inlet of described each sewer pipe B all is provided be used to the plate filter B6 that stops foreign material, is provided with on the described plate filter B6 and can monitors the D.C. resistance sensor that foreign material block the sheet frame filter area; The top of described plate filter B6 is installed in the top of the water inlet of a sewer pipe B by hinge B7; The bottom of described plate filter B6 is connected with pulling rope B8, and the other end of pulling rope B8 is wound on the hand elevator wheel B10; Described hand elevator wheel B10 is fixed on the top of adjacent sewer pipe; The top of described hand elevator wheel B10 is provided with cover plate B9.The effective cross sectional area of taking plate filter B6 when the D.C. resistance Sensor monitoring stopped when surpassing 30% by foreign material, and the warning system in municipal administration hall can automatic alarm, and giant-screen shows accurate location automatically.Municipal administration department can in time send the staff to the scene according to warning message, raises cover plate B9, shake hand elevator wheel B10, pull-up sheet frame filter B 6, clean out top foreign material after, again plate filter B6 is returned to original position, again build cover plate B9 and get final product.
In addition, the comprehensive sewer of described intelligent multifunction also is provided with the monitoring and alarming system that can reflect in real time the sewer running status; Described monitoring and alarming system comprises the infrared pick-up head that is installed in the tube cavity, be installed in pipe pressure sensor in each branch pipe(tube), be arranged on the display screen of municipal sector, and each hanging basket pressure sensor and each D.C. resistance sensor; The number of described infrared pick-up head and pipe pressure sensor is some, is evenly distributed in the tube cavity; Described infrared pick-up head, pipe pressure sensor, hanging basket pressure sensor and D.C. resistance sensor are connected with display screen respectively.By the infrared pick-up head, can carry out Real Time Monitoring to the facility of all in the body, monitored picture can be play on the display screen of municipal sector in real time, pipe pressure sensor then can carry out Real-Time Monitoring to the pressure that pipeline bears, in case the Pressure Overload-induced that pipeline bears will be reported to the police to the staff of municipal sector.In case break down or occur damaging, the staff can find the position of breaking down or occurring damaging by described monitoring and alarming system in the very first time, and the fault in-situ so that the maintainer arrives in the very nick of time is repaired fault or damaged location.
Claims (9)
1. comprehensive sewer of intelligent multifunction, comprise main sewer pipe and some sewer pipes that is connected on the main sewer pipe, described main sewer pipe and a sewer pipe all are that the internal diameter that adopts is the sewer integrated pipe of 3-6 rice, described sewer integrated pipe comprises body, the bottom of described tube cavity is provided with cover plate, be provided with several branch pipe(tube)s in the cavity of described cover plate below, the cavity of described cover plate top is rain water channel; It is characterized in that: be provided with the automatic flood discharge valve system on the described main sewer pipe, but described automatic flood discharge valve system comprises the float switch of the gate of main rain water channel in the slit shearing master sewer pipe, the elevating mechanism of regulating gate lifting, the drive motors that drives elevating mechanism and the action of control drive motors; Described float switch is arranged in the main rain water channel.
2. the comprehensive sewer of intelligent multifunction according to claim 1, it is characterized in that: the outfall place of described main sewer pipe is provided with automatic powerful flood drainage system; Described automatic powerful flood drainage system comprises latent well, drainage pump, is used for driving the drainage pump motor of drainage pump, and the automatic floating ball switch of control drainage pump motor action; Described latent well is arranged on outfall one side of main sewer pipe, and connects with main sewer pipe; The middle and upper part of described latent well is provided with the support for carrying drainage pump and drainage pump motor, and the distance of the highest rainwater liquid level is 30cm in described support and the latent well; Described automatic floating ball switch is rack-mount, and is connected with the drainage pump motor; The mouth place, top of described latent well is provided with latent manhole cover plate; The top mouth 30cm above ground level of described latent well.
3. the comprehensive sewer of intelligent multifunction according to claim 1, it is characterized in that: the below of described main sewer pipe and each sewer pipe joint is provided with sedimentation basin, be provided with the hanging basket for the storage deposit in the described sedimentation basin, the bottom of described hanging basket is provided with the hanging basket pressure sensor; Be provided with the passage that can hold cage lifting directly over the described sedimentation basin; The top mouth of described passage is provided with sewer cover plate.
4. the comprehensive sewer of intelligent multifunction according to claim 1, it is characterized in that: the water inlet of described each sewer pipe all is provided be used to the plate filter that stops foreign material, is provided with on the described plate filter and can monitors the D.C. resistance sensor that foreign material block the sheet frame filter area; The top of described plate filter is installed in the top of the water inlet of a sewer pipe by hinge; The bottom of described plate filter is connected with pulling rope, and the other end of pulling rope is wound on the hand elevator wheel; Described hand elevator wheel is fixed on the top of adjacent sewer pipe; The top of described hand elevator wheel is provided with cover plate.
5. the comprehensive sewer of the described intelligent multifunction of any one according to claim 1-4, it is characterized in that: the inner cavity top of described body is fixed be used to the wire clamp that grips the communications cable, electric power cable, network cable, monitoring cable.
6. the comprehensive sewer of intelligent multifunction according to claim 5, it is characterized in that: described branch pipe(tube) is respectively water supply pipe, heating power admission line, heating power return-air duct, gas pipeline and sewage conduct.
7. the comprehensive sewer of intelligent multifunction according to claim 6, it is characterized in that: the below of described cover plate is symmetrically arranged with left divider wall, right divider wall; The cavity of described cover plate below is divided into left cavity, middle chamber and right cavity by left divider wall and right divider wall; Described sewage conduct is arranged in the middle chamber; Described water supply pipe and heating power admission line are arranged in the left cavity; Described heating power return-air duct and gas pipeline are arranged in the right cavity; Described cover plate is divided into three parts, is respectively to cover left cover at left cavity top, cover at the inter panel at middle chamber top and cover right cover plate at right cavity top.
8. the comprehensive sewer of intelligent multifunction according to claim 7 is characterized in that: be provided with the first backup line in the described left divider wall, be provided with the second backup line in the described right divider wall.
9. the comprehensive sewer of intelligent multifunction according to claim 8 is characterized in that: also be provided with the monitoring and alarming system that can reflect in real time the sewer running status; Described monitoring and alarming system comprises the infrared pick-up head that is installed in the tube cavity, be installed in pipe pressure sensor in each branch pipe(tube), be arranged on the display screen of municipal sector, and each hanging basket pressure sensor and each D.C. resistance sensor; The number of described infrared pick-up head and pipe pressure sensor is some, is evenly distributed in the tube cavity; Described infrared pick-up head, pipe pressure sensor, hanging basket pressure sensor and D.C. resistance sensor are connected with display screen respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012206086765U CN202865976U (en) | 2012-11-02 | 2012-11-02 | Intelligent multifunctional comprehensive sewer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012206086765U CN202865976U (en) | 2012-11-02 | 2012-11-02 | Intelligent multifunctional comprehensive sewer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202865976U true CN202865976U (en) | 2013-04-10 |
Family
ID=48032704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012206086765U Expired - Lifetime CN202865976U (en) | 2012-11-02 | 2012-11-02 | Intelligent multifunctional comprehensive sewer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202865976U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102912848A (en) * | 2012-11-02 | 2013-02-06 | 赵学坤 | Intelligent multifunctional comprehensive sewer |
CN105443882A (en) * | 2014-08-29 | 2016-03-30 | 福建纳川管材科技股份有限公司 | Winding structure wall pipe with double functions of water permeation and sewage drainage |
-
2012
- 2012-11-02 CN CN2012206086765U patent/CN202865976U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102912848A (en) * | 2012-11-02 | 2013-02-06 | 赵学坤 | Intelligent multifunctional comprehensive sewer |
CN105443882A (en) * | 2014-08-29 | 2016-03-30 | 福建纳川管材科技股份有限公司 | Winding structure wall pipe with double functions of water permeation and sewage drainage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103469881A (en) | Comprehensive intelligent municipal pipe trench system | |
CN204502491U (en) | A kind of spiral-flow type pollution cutting device | |
CN203259870U (en) | Intelligent control system for prevention and treatment of city rainfall flood | |
CN204212093U (en) | Job site automatic spray dust falling system | |
CN102912848B (en) | Intelligent multifunctional comprehensive sewer | |
CN107630464A (en) | Rainwater-collecting is regulated and stored and the pipe gallery of preliminary purification function | |
CN202755443U (en) | Anti-blocking vertical grate type gutter inlet | |
CN202865976U (en) | Intelligent multifunctional comprehensive sewer | |
CN206706952U (en) | Sewer automates drainage system | |
CN206109974U (en) | Bridge drainage system | |
CN202809648U (en) | Multifunctional sewer integrated pipe | |
CN205259329U (en) | Water draining inspection well | |
CN204023770U (en) | A kind of integrated prefabricated pumping plant | |
CN107806161B (en) | Diversion well control system and diversion well for power failure and control method | |
CN213204424U (en) | Integrated intercepting well | |
CN210887545U (en) | Novel device for fishing garbage in pump station | |
CN104532808A (en) | Turnover type trash barrier and removal rack | |
CN204255452U (en) | Based on water on urban streets early warning and the automatic disposal system of technology of Internet of things | |
CN104452686B (en) | Solar automatic trash removal three-dimensional trash rack device | |
CN210373225U (en) | Solar power generation street lamp capable of collecting rainwater | |
CN112554273A (en) | Ecological rainwater collection system and construction method thereof | |
CN106592734A (en) | Integrated initial rainwater purification system with functions of collection, storage, purification and transfer | |
CN207063094U (en) | A kind of solar energy hydraulic self-control cuts dirty reverse-filling equipment | |
CN206205106U (en) | One kind collection is collected, stored, purifying, transferring integrated early-stage rainwater cleaning system | |
CN206157857U (en) | Intelligence hydraulic pressure intercepting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20130410 Effective date of abandoning: 20140409 |
|
RGAV | Abandon patent right to avoid regrant |