CN202850513U - Seismic-isolating support seat brick concrete reinforcement structure - Google Patents

Seismic-isolating support seat brick concrete reinforcement structure Download PDF

Info

Publication number
CN202850513U
CN202850513U CN 201220524574 CN201220524574U CN202850513U CN 202850513 U CN202850513 U CN 202850513U CN 201220524574 CN201220524574 CN 201220524574 CN 201220524574 U CN201220524574 U CN 201220524574U CN 202850513 U CN202850513 U CN 202850513U
Authority
CN
China
Prior art keywords
pin key
prefabricated pin
prefabricated
seismic
isolating pedestal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220524574
Other languages
Chinese (zh)
Inventor
董有
赵恩平
瞿翔
鞠树森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Bless Building Co., Ltd.
Original Assignee
BEIJING ZHUFU CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHUFU CONSTRUCTION ENGINEERING Co Ltd filed Critical BEIJING ZHUFU CONSTRUCTION ENGINEERING Co Ltd
Priority to CN 201220524574 priority Critical patent/CN202850513U/en
Application granted granted Critical
Publication of CN202850513U publication Critical patent/CN202850513U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a seismic-isolating support seat brick concrete reinforcement structure, a steel pipe concrete cylindrical prefabricated pin key beam is utilized to carry out shock-insulating processing for a base, and belongs to the field of seismic resistance and reinforcement. The seismic-isolating support seat brick concrete reinforcement structure comprises a ground ring beam, a prefabricated pin key beam, an upper shoulder beam, a lower shoulder beam, an upper seal plate, a low seal plate and a seismic-isolating support seat. According to the seismic-isolating support seat brick concrete reinforcement structure, the steel pipe concrete cylindrical prefabricated pin key beam is utilized to replace a traditional reinforced concrete rectangular cast-in-site pin key beam to carry out the shock-insulating processing. According to the steel pipe concrete cylindrical prefabricated pin key beam, structure strength is higher, integrity is better, and construction is more rapid. The basic seismic-isolating method is more economic and reasonable, safe and reliable, and wide in application prospect.

Description

The shock isolating pedestal brick is mixed fixing structure
Technical field
The utility model relates to a kind of shock isolating pedestal brick and mixes fixing structure, mainly utilizes the cylindrical prefabricated pin key beam of concrete filled steel tube that shock insulation is carried out on the basis and processes, and belongs to the seismic hardening field.
Background technology
The pin key beam is equivalent to be inserted in the pin key in the load bearing wall, and the vertical load of structure is passed to the shoulder beam by it.Pin key beam section in the conventional method is shaped as rectangle, adopts cast-in-place concrete construction technique.For guaranteeing that the pin key beam is connected with the shoulder beam, stay bar splice outward; For guaranteeing construction, template installation, it is larger that pin key beam dimension of opening should be opened.There is following shortcoming in it:
1, the masonry structure before the eighties is set up defences without antidetonation, do not establish constructional column and collar tie beam, generally there is not the ground collar tie beam yet, and the intensity of brick and mortar is usually lower, for guaranteeing to transmit reliably the superstructure load, can not cause again because of brick wall pressure-bearing deficiency, cause structural deterioration, so the common spacing of pin key beam is less, generally establish a pin key beam every 500~700mm, and pin key deck-siding 250mm, the common wide 300mm that is not less than in hole, the hole is intensive or the method that punches is improper, can cause wall body slit to be communicated with, and causes structural deterioration.
2, the pin key beam is Cast-in-place concrete, sometimes adopts the interval to punch for guaranteeing construction safety, in batches the method for pouring construction.Long because of the concrete cure cycle, this has just affected construction speed greatly, causes engineering not construct continuously.
3, consider in the design that the pin key beam is connected with steel concrete shoulder the reliable of beam, generally will get rid of in advance anchor bar, the more formwork supporting plate difficulty that causes of these dowel quantity.
4, because pin key beam hole is offered and can't be accomplished very standard, but pin key beam concrete must be full of the hole, can not stay the space, also causes difficulty to concrete construction.
5, because the quantity of pin key beam is a lot, and problem is also a lot of in the construction, has had a strong impact on the quality control difficulty of base isolation reinforcement and prolonged construction period.This is key and Key technique problem that Seismic Isolation of Isolation Layer arranges.
The utility model content
The utility model is in order to overcome the deficiency of conventional method, propose a kind of shock isolating pedestal brick and mixed fixing structure, its installation that can solve better shock isolating pedestal in the base isolation with insert a difficult problem, a kind of simple in structure, economical rationality, actual effectively Shockproof reinforcing method are provided.
To achieve these goals, the utility model has been taked following technical scheme:
A kind of shock isolating pedestal brick is mixed fixing structure, comprise ground collar tie beam, prefabricated pin key beam, upper shoulder beam, lower shoulder beam, upper sealing plate, lower shrouding, shock isolating pedestal, wherein, prefabricated pin key beam is divided into prefabricated pin key beam and lower prefabricated pin key beam, the load bearing wall of collar tie beam below, described ground is divided into upper and lower two parts, is provided with shock isolating pedestal between upper and lower two parts load bearing wall; Be arranged at intervals with prefabricated pin key beam hole on the load bearing wall of top, be inserted with prefabricated pin key beam in the hole; Be arranged at intervals with prefabricated pin key beam hole on the load bearing wall of bottom, be inserted with lower prefabricated pin key beam in the hole; Upper and lower prefabricated pin key beam all stretches out the load bearing wall both sides; Many upper prefabricated pin key beams that stretch out connect as one by upper shoulder beam, and many lower prefabricated pin key beams that stretch out connect as one by lower shoulder beam; Be respectively arranged with upper sealing plate and lower shrouding between shock isolating pedestal and the upper and lower shoulder beam.
Further, described prefabricated pin key beam is the cylindrical prefabricated pin key beam of concrete filled steel tube.
Further, described prefabricated pin key joist steel thickness of pipe wall 4~5mm, external diameter is 200mm, steel pipe length is that the load-bearing wall thickness adds 120mm.
Above-mentioned shock isolating pedestal brick is mixed the installation support and change method of fixing structure, comprises the steps:
Step 1: excavation foundation;
Step 2: select OB-255A diamond water to bore auger, the top load bearing wall below brick mix structure ground collar tie beam is opened prefabricated pin key beam hole, and the diameter that punches is 230mm;
Step 3: install prefabricated pin key beam, in the space, pour into A level modified epoxy structure glue behind the location, guarantee prefabricated pin key beam and body of wall close contact;
Step 4: take on beam on the perfusion steel concrete, it reliably is connected with upper prefabricated pin key beam;
Step 5: adopt outsourcing C30 concrete to carry out underpin;
Step 6: select OB-255A diamond water to bore auger, open prefabricated pin key beam hole at the bottom load bearing wall, the diameter that punches is 230mm;
Step 7: lower prefabricated pin key beam is installed, in the space, is poured into A level modified epoxy structure glue behind the location, guarantee prefabricated pin key beam and body of wall close contact;
Step 8: take on beam under the perfusion steel concrete, it reliably is connected with lower prefabricated pin key beam;
Step 9: opening the installation shock isolating pedestal under steel concrete shoulder beam and the steel concrete between the shoulder beam and beating the hole of building upper sealing plate and lower shrouding;
Step 10: shock isolating pedestal is installed and is built upper sealing plate and lower shrouding;
Step 11: the continuous body of wall between the shoulder beam under shoulder beam and the steel concrete on the cutting disassembling steel concrete, separate the contact of upper and lower part wall body structure, generate Seismic Isolation of Isolation Layer;
Step 12: the pipeline that changes between Seismic Isolation of Isolation Layer is flexible the connection by former rigid connection;
Step 13: build passage and inspection eye that shock isolating pedestal is safeguarded and changed.
Wherein, the OB-255A diamond water that (1) is selected bores auger, also claims Opel universal type auger, bore diameter 15~255mm, and input power 4250W, idle speed 580r/min, speed of fulfiling hole is fast, and is harmless to body of wall, greatly reduced the size that punches.(2) selecting the prefabricated pin key beam of concrete filled steel tube of 200mm external diameter, is up to standard in order to guarantee pin key beam appearance and size tolerance, so that install and connection construction, guarantees pin key beam and body of wall close contact.(3) pin key joist steel pipe adopts the perfusion of C30 pea gravel concrete.(4) the prefabricated pin key beam of concrete filled steel tube is in advance prefabricated by professional factory for prefabrication.Press the drawing location in the engineering construction, line boring blows off graying in the hole, and prefabricated pin key beam is installed, and requires pin key beam position placed in the middle, and 60mm is stayed on every limit, anchors in the shoulder beam, guarantees that the pin key beam is connected with the shoulder beam, can install while holing, continuously construction operation.
The beneficial effects of the utility model are: adopt shock isolating pedestal brick of the present utility model to mix fixing structure and support and change method is installed to make structural strength higher, globality is better, it is faster to construct, can solve well shock isolating pedestal and install and to underpin problem, reach safety, reliably, purpose easily and efficiently.
Description of drawings
Fig. 1 is that shock isolating pedestal is laid and underpined profile;
A-A sectional drawing among Fig. 1 among Fig. 2;
Fig. 3 is that Seismic-Isolated Masonry Buildings is reinforced drawing;
Among the figure, 1-ground collar tie beam; The upper prefabricated pin key beam of 2-; The upper shoulder of 3-beam; The 4-upper sealing plate; The 5-shock isolating pedestal; Shrouding under the 6-; Prefabricated pin key beam under the 7-; Take on beam under the 8-; The 9-underpin; The 10-base plate.
The specific embodiment
Shown in Fig. 1~3, the specific embodiment of the present utility model is as follows:
A kind of shock isolating pedestal brick is mixed fixing structure, comprise ground collar tie beam 1, prefabricated pin key beam, upper shoulder beam 3, lower shoulder beam 8, upper sealing plate 4, lower shrouding 6, shock isolating pedestal 5, prefabricated pin key beam is divided into prefabricated pin key beam 2 and lower prefabricated pin key beam 7, the load bearing wall of collar tie beam 1 below, ground is divided into upper and lower two parts, is provided with shock isolating pedestal 5 between upper and lower two parts load bearing wall; Be arranged at intervals with prefabricated pin key beam hole on the load bearing wall of top, be inserted with prefabricated pin key beam 2 in the hole; Be arranged at intervals with prefabricated pin key beam hole on the load bearing wall of bottom, be inserted with lower prefabricated pin key beam 7 in the hole; Upper and lower prefabricated pin key beam 2,7 all stretches out the load bearing wall both sides; Many upper prefabricated pin key beams 2 that stretch out connect as one by upper shoulder beam 3, and many lower prefabricated pin key beams 7 that stretch out connect as one by lower shoulder beam 8; Be respectively arranged with upper sealing plate 4 and lower shrouding 6 between shock isolating pedestal 5 and the upper and lower shoulder beam 3,8.Wherein, prefabricated pin key beam is the cylindrical prefabricated pin key beam of concrete filled steel tube, prefabricated pin key joist steel thickness of pipe wall 4~5mm, and external diameter is 200mm, steel pipe length is that the load-bearing wall thickness adds 120mm.It is as follows that it installs support and change method:
Comprise the steps:
Step 1: excavation foundation;
Step 2: select OB-255A diamond water to bore auger, the top load bearing wall below brick mix structure ground collar tie beam 1 is opened prefabricated pin key beam hole, and the diameter that punches is 230mm;
Step 3: install prefabricated pin key beam 2, in the space, pour into A level modified epoxy structure glue behind the location, guarantee prefabricated pin key beam and body of wall close contact;
Step 4: shoulder beam 3 on the perfusion steel concrete makes it reliably be connected with upper prefabricated pin key beam 2;
Step 5: adopt outsourcing C30 concrete to carry out underpin 9;
Step 6: select OB-255A diamond water to bore auger, open prefabricated pin key beam hole at the bottom load bearing wall, the diameter that punches is 230mm;
Step 7: lower prefabricated pin key beam 7 is installed, in the space, is poured into A level modified epoxy structure glue behind the location, guarantee prefabricated pin key beam and body of wall close contact;
Step 8: shoulder beam 8 under the perfusion steel concrete makes it reliably be connected with lower prefabricated pin key beam 7;
Step 9: 8 on beam of shoulder is opened and shock isolating pedestal 5 is installed and is beaten the hole of building upper sealing plate 4 and lower shrouding 6 under steel concrete shoulder beam 3 and steel concrete;
Step 10: shock isolating pedestal 5 is installed and is built upper sealing plate 4 and lower shrouding 6;
Step 11: take on the continuous body of wall of 8 on beam on the cutting disassembling steel concrete under shoulder beam 3 and the steel concrete, separate the contact of upper and lower part wall body structure, generate Seismic Isolation of Isolation Layer;
Step 12: the pipeline that changes between Seismic Isolation of Isolation Layer is flexible the connection by former rigid connection;
Step 13: build passage and inspection eye that shock isolating pedestal 5 is safeguarded and changed.
More than be an exemplary embodiments of the present utility model, enforcement of the present utility model is not limited to this.

Claims (3)

1. a shock isolating pedestal brick is mixed fixing structure, it is characterized in that: comprise ground collar tie beam (1), prefabricated pin key beam, upper shoulder beam (3), lower shoulder beam (8), upper sealing plate (4), lower shrouding (6), shock isolating pedestal (5), wherein, prefabricated pin key beam is divided into prefabricated pin key beam (2) and lower prefabricated pin key beam (7), the load bearing wall of described ground collar tie beam (1) below is divided into upper and lower two parts, is provided with shock isolating pedestal (5) between upper and lower two parts load bearing wall; Be arranged at intervals with prefabricated pin key beam hole on the load bearing wall of top, be inserted with prefabricated pin key beam (2) in the hole; Be arranged at intervals with prefabricated pin key beam hole on the load bearing wall of bottom, be inserted with lower prefabricated pin key beam (7) in the hole; Upper and lower prefabricated pin key beam (2,7) all stretches out the load bearing wall both sides; Many upper prefabricated pin key beams (2) that stretch out connect as one by upper shoulder beam (3), and many lower prefabricated pin key beams (7) that stretch out connect as one by lower shoulder beam (8); Be respectively arranged with upper sealing plate (4) and lower shrouding (6) between shock isolating pedestal (5) and the upper and lower shoulder beam (3,8).
2. shock isolating pedestal brick according to claim 1 is mixed fixing structure, it is characterized in that: described prefabricated pin key beam is the cylindrical prefabricated pin key beam of concrete filled steel tube.
3. shock isolating pedestal brick according to claim 2 is mixed fixing structure, it is characterized in that: described prefabricated pin key joist steel thickness of pipe wall 4~5mm, and external diameter is 200mm, steel pipe length is that the load-bearing wall thickness adds 120mm.
CN 201220524574 2012-10-11 2012-10-11 Seismic-isolating support seat brick concrete reinforcement structure Expired - Fee Related CN202850513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220524574 CN202850513U (en) 2012-10-11 2012-10-11 Seismic-isolating support seat brick concrete reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220524574 CN202850513U (en) 2012-10-11 2012-10-11 Seismic-isolating support seat brick concrete reinforcement structure

Publications (1)

Publication Number Publication Date
CN202850513U true CN202850513U (en) 2013-04-03

Family

ID=47981725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220524574 Expired - Fee Related CN202850513U (en) 2012-10-11 2012-10-11 Seismic-isolating support seat brick concrete reinforcement structure

Country Status (1)

Country Link
CN (1) CN202850513U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864943A (en) * 2012-10-11 2013-01-09 北京筑福建设工程有限责任公司 Brick and concrete reinforcement structure for shock insulation support and mounting and underpinning method thereof
CN107806252A (en) * 2017-10-23 2018-03-16 南京百西思建筑科技有限公司 The upper buttress construction and its construction method of existing building base isolation reinforcement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102864943A (en) * 2012-10-11 2013-01-09 北京筑福建设工程有限责任公司 Brick and concrete reinforcement structure for shock insulation support and mounting and underpinning method thereof
CN102864943B (en) * 2012-10-11 2016-08-03 北京筑福国际工程技术有限责任公司 Shock isolating pedestal brick is mixed fixing structure and installs support and change method
CN107806252A (en) * 2017-10-23 2018-03-16 南京百西思建筑科技有限公司 The upper buttress construction and its construction method of existing building base isolation reinforcement

Similar Documents

Publication Publication Date Title
CN102864943A (en) Brick and concrete reinforcement structure for shock insulation support and mounting and underpinning method thereof
CN107313517B (en) Connecting node for laminated wall and laminated floor slab in middle layer
CN105804283B (en) Full assembly concrete-filled steel tube frame combined shear wall construction
CN205894313U (en) Prefabricated assembled steel pipe retrains frame node entirely
CN106869567A (en) A kind of energy-dissipating type cold-formed thin-walled steel pipe concrete Lateral Resistant System
CN109025064A (en) Method for manufacturing and installing prefabricated concrete column and column assembly type connecting node
CN106400982A (en) Stirrup-densified splicing joint for fabricated reinforced concrete columns
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN101936074B (en) Fast building earthquake-resisting reinforcing method and device
CN201567584U (en) Prefabricated construction reinforced concrete cushion cap foundation
CN203129203U (en) Rubble retaining wall reinforcing single-face formwork supporting system
CN204780969U (en) Compound bored concrete pile basis of expanding of large -scale transmission tower
CN110593303B (en) Prefabricated reinforced concrete fixed buttress for thermal pipeline and construction method
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN205637239U (en) Completely assembling formula steel pipe concrete frame compound shear wall structure
CN103352584B (en) A kind of jacket-type reinforcement means
CN202850513U (en) Seismic-isolating support seat brick concrete reinforcement structure
CN112227353A (en) Assembled integral static pressure pile
CN206752693U (en) A kind of assembled steel reinforced concrete column of stirrup encryption and post splicing node
CN209523212U (en) Assembled independent foundation
CN207003470U (en) A kind of pin-connected panel ecological anchor rod retaining wall structure
CN201857766U (en) Shortcut house anti-seismic reinforcing device
CN210946874U (en) Heat distribution pipeline prefabricated reinforced concrete fixed buttress
CN101565931B (en) Cast in-situ piling pile reinforcement bridge pier structure and construction method
CN103993672A (en) Tenon type connecting joint structure of low-rise fabricated composite wall house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY

Free format text: FORMER NAME: BEIJING AEIDO CONSTRUCTION ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building

Patentee after: Beijing Aeido International Engineering Technology Co., Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building

Patentee before: Beijing Zhufu Construction Engineering Co., Ltd.

DD01 Delivery of document by public notice

Addressee: Beijing Aeido International Engineering Technology Co., Ltd.

Document name: Notification that Application Deemed not to be Proposed

ASS Succession or assignment of patent right

Owner name: BEIJING BLESS BUILDING CO., LTD.

Free format text: FORMER OWNER: BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY CO., LTD.

Effective date: 20140702

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140702

Address after: 100043 Shijingshan District, Yang Yang Street, No. 69, No. 1, building an international Park, Fu International

Patentee after: Beijing Bless Building Co., Ltd.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building

Patentee before: Beijing Aeido International Engineering Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20161011

CF01 Termination of patent right due to non-payment of annual fee