CN202848645U - Conveying system of tailing secondary pump station - Google Patents

Conveying system of tailing secondary pump station Download PDF

Info

Publication number
CN202848645U
CN202848645U CN 201220349947 CN201220349947U CN202848645U CN 202848645 U CN202848645 U CN 202848645U CN 201220349947 CN201220349947 CN 201220349947 CN 201220349947 U CN201220349947 U CN 201220349947U CN 202848645 U CN202848645 U CN 202848645U
Authority
CN
China
Prior art keywords
tailing
tailings
pump
pumping station
pond
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220349947
Other languages
Chinese (zh)
Inventor
徐继胜
计正武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI NEW ZHONGYUAN CHEMICAL Co Ltd
Original Assignee
ANHUI NEW ZHONGYUAN CHEMICAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI NEW ZHONGYUAN CHEMICAL Co Ltd filed Critical ANHUI NEW ZHONGYUAN CHEMICAL Co Ltd
Priority to CN 201220349947 priority Critical patent/CN202848645U/en
Application granted granted Critical
Publication of CN202848645U publication Critical patent/CN202848645U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jet Pumps And Other Pumps (AREA)

Abstract

The utility model discloses a tailing conveying and iron source comprehensive recycling system in sulfur selection work. A conveying system of a tailing secondary pump station comprises a tailing thickening pond, a primary tailing conveying pump, a magnetic separator, an iron concentrate pond, a secondary pump station tailing tower, and a secondary tailing conveying pump. After the tailing in the sulfur selection work enters the thickening pond, overflow water of the thickening pond enters a production water circular system to recycle, underflow of the overflow water is connected with a feeding pipe of the primary tailing conveying pump, a discharging pipe of the primary tailing conveying pump is connected with a secondary pump station magnetic separator, a magnetic separator concentrate unloading pipe is connected with an iron concentrate setting tank, a magnetic separator tailing pipe is connected with the secondary pump station tailing tower, the bottom of the tailing tower is provided with the secondary tailing conveying pump, and discharge pipes of the secondary tailing conveying pump are all connected with a tailing pond 1000 meters away. The system is simple in structure, eliminates inconvenience and fault hidden risks generated due to the fact that a primary pump station is connected with two pumps in serial to conveying tailing to the tailing pond in the prior art, saves maintenance cost of tail pumps, and improves work efficiency of dressing plants by 8%, and meanwhile improves comprehensive utilization of resources.

Description

Tailings secondary pumping station delivery system
Technical field
The utility model relates generally to the mill tailings transportation art, relates in particular to the comprehensive recovery system of the conveying of mine tailing secondary pumping station and resource thereof.
Background technology
Mine tailing delivery system in the prior art includes a mine tailing thickening pond and two groups of (the using and the reserved) mine tailing drug delivery pump system, every group is comprised of two pumps in series respectively, every group of transmission pump discharging opening directly accesses Tailings Dam, and namely mine tailing works to finish conveying simultaneously by two pumpss in series of one-level pumping plant.System configuration for this type of high-lift (h=75 rice), remote (S=1300 rice) conveying because two pumps in series is used, closely restricts mutually, and without any buffering leeway; And because the sand pump operation pressure is large, cause the reactive loss of lift between two pumps; Moreover because second pump of series connection is directly to work, also caused the resistance loss of First pump under the pressure-acting of First pump, and the dehvery lift loss is not only arranged, sand pump is very easily wearing and tearing also, and the disorderly closedown that brings therefrom happens occasionally.
The utility model content
The utility model purpose is exactly in order to remedy the defective of prior art, tailings secondary pumping station delivery system to be provided, and it has been eliminated because of mine tailing and has carried the potential faults that produces by two pumpss in series, has reduced the cost of equipping.
The utility model is achieved through the following technical solutions:
Tailings secondary pumping station delivery system includes mine tailing thickening pond, one-level pumping plant tailings pump, secondary pumping station cobber and iron ore concentrate sludge pan, secondary pumping station sand tower and tailings transmission pump thereof.It is characterized in that: the mine tailing from flotation operation is concentrated through thickening pond, overflow water returns production and uses, its underflow accesses respectively two tailings pumps (open standby) feed pipe of one-level pumping plant, the discharge nozzle of two pumps all accesses the secondary pumping station cobber material feeding box at 300 meters, cobber concentrate discharge gate access iron ore concentrate sludge pan, cobber debris tube direct current leads to secondary pumping station sand tower.The sand tower bottom is provided with two secondary tailings transmission pumps of installing side by side, and its feed pipe is communicated with sand tower, and its outlet pipe all accesses the Tailings Dam outside 1000 meters.
The utility model has eliminated fundamentally that mine tailing is delivered to Tailings Dam by original two pumps in series and the inconvenience that causes to operation, thereby eliminate the potential faults that brings therefrom, not only guarantee to produce normal, and sand pump standby redundancy expense lacked than originally nearly 1/3, more than 80,000 yuan of the costs for equipment of saving approximately pump every year.Also accomplished simultaneously the comprehensive reutilization to iron resource in the mine tailing.Sulphur flotation operation tailings discharging amount by 50 tons/time, wherein contain Fe 3O 4Content 0.5%, iron concentrate grade 58%, iron recovery 70% calculates, and can reclaim about more than 2000 tons of iron ore concentrate the whole year from mine tailing, per tonly only press 500 yuan of calculating, removes the cobber power consumption and takes more than 70,000 yuan/year, and only this item can be enterprise every year and has a net increase of the output value and reach more than 90 ten thousand yuan.
The utility model has the advantages that:
The utility model simple structure has been eliminated because of mine tailing and has been carried all potential faults produce by two pumps in series, makes the ore dressing plant operating rate bring up to 90% by original average 82%.Simultaneously, realized the comprehensive reutilization of mineral resources.
Description of drawings
Fig. 1 is tailings delivery system organigram before transforming.
Fig. 2 is the organigram that the utility model is namely transformed rear tailings secondary pumping station delivery system.
1-mine tailing thickening pond wherein, 2-one-level pumping plant tailings pump, 3-cobber, 4-secondary pumping station sand tower, 5-secondary pumping station tailings pump.
The specific embodiment
Referring to Fig. 1, Fig. 2, the mine tailing delivery system comprises mine tailing thickening pond 1, one-level pumping plant tailings pump 2, cobber 3 and iron ore concentrate sludge pan, secondary pumping station sand tower 4 and secondary pumping station tailings pump 5.The underflow of mine tailing thickening pond 1 accesses respectively the tailings pump 2 that two of one-level pumping plants are set up in parallel, the discharging opening of every one-level tailings pump 2 all accesses to be roughly selected first rear selected into secondary pumping station cobber 3(), the cobber concentrate enters the iron ore concentrate sludge pan, cobber is roughly selected all to flow automatically with selected mine tailing and is entered secondary pumping station sand tower 4, the sand tower is put sandpipe and is accessed two secondary tailings transmission pumps 5 that its bottom arranges, and the discharge nozzle of every secondary tailings pump 5 all accesses into Tailings Dam.

Claims (2)

1. tailings secondary pumping station delivery system, include tailings concentration basin, two tailings transmission pumps of one-level pumping plant, secondary pumping station cobber, secondary pumping station sand tower, two tailings transmission pumps of secondary pumping station, it is characterized in that: mine tailing thickening pond underflow, be transported to secondary pumping station by tailings pump of one-level pumping plant, behind the magnetite in the cobber recovery tailings, iron ore concentrate advances the natural seasoning of iron ore concentrate sludge pan, mine tailing enters secondary pumping station sand tower again after the magnetic separation, and the secondary tailings pump by the setting of sand tower bottom is transported to Tailings Dam again.
2. tailings secondary pumping station delivery system according to claim 1, it is characterized in that: include a mine tailing thickening pond, the thickening pond bottom is provided with two tailings pumps of installation arranged side by side, single pump delivery system for the using and the reserved, carry secondary pumping station at the other tailings of setting up of one-level pumping plant, and install one group and contain and roughly select and selected two cobbers, the tailings that the cobber charging is carried from the one-level pumping plant, magnetic concentrate access iron ore concentrate precipitates dry pond; Magnetic tailing access secondary pumping station sand tower, the sand tower bottom is equipped with the secondary tailings transmission pump of two the using and the reserved side by side.The straight-through sand tower bottom of secondary tailings pump feed pipe is put the sand mouth, secondary tailings pump discharge pipeline access tailings storehouse.
?
CN 201220349947 2012-07-19 2012-07-19 Conveying system of tailing secondary pump station Expired - Fee Related CN202848645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220349947 CN202848645U (en) 2012-07-19 2012-07-19 Conveying system of tailing secondary pump station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220349947 CN202848645U (en) 2012-07-19 2012-07-19 Conveying system of tailing secondary pump station

Publications (1)

Publication Number Publication Date
CN202848645U true CN202848645U (en) 2013-04-03

Family

ID=47979865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220349947 Expired - Fee Related CN202848645U (en) 2012-07-19 2012-07-19 Conveying system of tailing secondary pump station

Country Status (1)

Country Link
CN (1) CN202848645U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104874472A (en) * 2015-03-31 2015-09-02 马钢(集团)控股有限公司 Automatic separating device for fine-sized slime in tailings conveying manifolds
CN109382200A (en) * 2018-09-14 2019-02-26 金川集团股份有限公司 A kind of Tailings transportation device and its delivery method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104874472A (en) * 2015-03-31 2015-09-02 马钢(集团)控股有限公司 Automatic separating device for fine-sized slime in tailings conveying manifolds
CN104874472B (en) * 2015-03-31 2017-05-24 马钢(集团)控股有限公司 Automatic separating device for fine-sized slime in tailings conveying manifolds
CN109382200A (en) * 2018-09-14 2019-02-26 金川集团股份有限公司 A kind of Tailings transportation device and its delivery method
CN109382200B (en) * 2018-09-14 2023-10-20 金川集团股份有限公司 Tailing conveying device

Similar Documents

Publication Publication Date Title
CN202655105U (en) Iron mine tailing dry pile device
CN202848645U (en) Conveying system of tailing secondary pump station
CN112973953A (en) Improved collophanite flotation return water short circulating system
CN202199415U (en) Pretreatment device for rare earth processing flotation and magnetic separation
CN207271464U (en) A kind of tailing dry row's equipment that can be improved efficiency and reduce cost
CN211109664U (en) Ore separation device for rapidly and uniformly separating and feeding mine filling tailing pulp
CN104154419A (en) Double-concentration-basin slurry pipeline conveying system
CN201325937Y (en) Protein recovery device for protein and starch separation section in the production of corn starch
CN203392954U (en) Mineral separation, water-saving and emission reduction equipment
CN205011710U (en) Carbide slag thick liquid separator indisputable with silicon in wet process system acetylene
CN102897950A (en) Method for treating coal slurry water at long-distance pipeline coal transporting terminal
CN209384316U (en) A kind of desulfurization municipal water supply system
CN103834818B (en) Oxygen adding system and method for reactor iron removing
CN207276527U (en) A kind of methanol extraction in MTBE devices recycles structure
CN215087951U (en) Improved collophanite flotation return water short circulating system
CN207213650U (en) A kind of fine fraction concentrate conveys concentrator
CN202529579U (en) U-shaped communicating pipe water carrier coal transportation system
CN203907234U (en) Slurry pipeline conveying system of double concentration basins
CN106520203A (en) Acetylene dreg slurry conveying system
CN208594239U (en) Toluene sends device outside in benzene column
CN204569863U (en) Pipeline coal transporting water delivery process unit under a kind of large drop ground potential condition
CN203668318U (en) Replacement gas recovery device in wet acetylene production system
CN205199296U (en) With clear solution retrieval and utilization device in ore pulp desulfurization
CN204344161U (en) Crude tailings gravitational settling type filling system
CN204816910U (en) Groove double - circuit mineralize mineralization composite set is scanned in positive flotation of bauxite

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20150719

EXPY Termination of patent right or utility model