CN202810087U - Connection structure of flagstone and wallboard - Google Patents

Connection structure of flagstone and wallboard Download PDF

Info

Publication number
CN202810087U
CN202810087U CN 201220482571 CN201220482571U CN202810087U CN 202810087 U CN202810087 U CN 202810087U CN 201220482571 CN201220482571 CN 201220482571 CN 201220482571 U CN201220482571 U CN 201220482571U CN 202810087 U CN202810087 U CN 202810087U
Authority
CN
China
Prior art keywords
wallboard
flagstone
slabstone
fixed
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220482571
Other languages
Chinese (zh)
Inventor
孔蕾蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201220482571 priority Critical patent/CN202810087U/en
Application granted granted Critical
Publication of CN202810087U publication Critical patent/CN202810087U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a connection structure of a flagstone and a wallboard. The connection structure of the flagstone and the wallboard is characterized by comprising the wallboard, the flagstone, an aluminium plate, a chloroprene rubber block, building sealants, a steel fastener, anchor bolts and a concave steel plug-in board. A gap of 15-25 millimeters is maintained between the wallboard and the flagstone. The inner side of the gap is provided with the chloroprene rubber block, and the outer side of the gap is sealed by the building sealants. The outer side of the wallboard is provided with the aluminium plate, and the thickness of the aluminium plate is 3-5 millimeters. An aluminium upper end socket is fixed on the steel fastener through a bolt, and the steel fastener is fixed inside a structural body through the anchor bolts. The lower side of the flagstone is provided with a groove, the concave steel plug-in board is embedded in the groove and is sealed by strong adhesives, and the concave steel plug-in board is fixed on the structural body through the anchor bolts. The connection structure of the flagstone and the wallboard is simple and practical.

Description

A kind of slabstone and wallboard connecting structure
Technical field
The utility model relates to a kind of slabstone and wallboard connecting structure, is applicable to construction field.
Background technology
Stone facing dry-hanging method construction technology is to adopt the flexible connecting member of galvanized bolt and corrosion resistant decorations, and with the external surface of stone material dry suspending in building structure, stone material inner surface and structural outer surface keep certain space.Its advantage is to have accelerated construction speed, save again this procedure of grouting, effectively reduced the deadweight of building, the slabstone quality problems that come off there has been larger improvement, stone material is not subjected to the pollution of cement paste, greatly improve the aesthetic of building, be applicable to the decorative engineering of the public buildings such as large outer facade such as station, hotel, shop.If it is the problem that the engineering staff faces that different stone materials such as slabstone and wallboard are done effectively to be connected.
The utility model content
The technical problem that the utility model solves provides a kind of slabstone and wallboard connecting structure, solves existing technical deficiency.
The utility model comprises wallboard, slabstone, aluminium sheet, neoprene blocks, building sealant, steel fastener, crab-bolt, spill steel plug-in unit, wallboard and slabstone keep the space of 15~25mm, the inboard, space arranges neoprene blocks, the building sealant sealing is adopted in the outside, space, wallboard arranged outside aluminium sheet, aluminium plate thickness is 3~5mm, the aluminium sheet upper cover is fixed by bolts to above the steel fastener, steel fastener is fixed in the structure with crab-bolt, the slabstone downside arranges groove, spill steel plug-in unit embeds groove and seals with strong adhesive, and spill steel plug-in unit is fixed on above the structure by crab-bolt.
The utility model is simple and practical.
Description of drawings
Fig. 1 slabstone and wallboard connecting structure schematic diagram.
Accompanying drawing sign: 1, wallboard, 2, slabstone, 3, aluminium sheet, 4, neoprene blocks, 5, building sealant, 6, steel fastener, 7, crab-bolt, 8, spill steel plug-in unit.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Fig. 1 is slabstone and wallboard connecting structure schematic diagram.The utility model comprises wallboard 1, slabstone 2, aluminium sheet 3, neoprene blocks 4, building sealant 5, steel fastener 6, crab-bolt 7, spill steel plug-in unit 8, the space that wallboard 1 and slabstone 2 keep 20mm, the inboard, space arranges neoprene blocks 4, building sealant 5 sealings are adopted in the outside, space, wallboard 1 arranged outside aluminium sheet 3, aluminium sheet 3 thickness are 4mm, aluminium sheet 3 upper covers are fixed by bolts to above the steel fastener 6, steel fastener 6 usefulness crab-bolts 7 are fixed in the structure, slabstone 2 downsides arrange groove, spill steel plug-in unit 8 embeds groove and seals with strong adhesive, and spill steel plug-in unit 8 is fixed on above the structure by crab-bolt 7.

Claims (1)

1. a slabstone and wallboard connecting structure, it is characterized in that comprising wallboard, slabstone, aluminium sheet, neoprene blocks, building sealant, steel fastener, crab-bolt, spill steel plug-in unit, wallboard and slabstone keep the space of 15~25mm, the inboard, space arranges neoprene blocks, the building sealant sealing is adopted in the outside, space, wallboard arranged outside aluminium sheet, aluminium plate thickness is 3~5mm, the aluminium sheet upper cover is fixed by bolts to above the steel fastener, steel fastener is fixed in the structure with crab-bolt, the slabstone downside arranges groove, and spill steel plug-in unit embeds groove and seals with strong adhesive, and spill steel plug-in unit is fixed on above the structure by crab-bolt.
CN 201220482571 2012-09-11 2012-09-11 Connection structure of flagstone and wallboard Expired - Fee Related CN202810087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220482571 CN202810087U (en) 2012-09-11 2012-09-11 Connection structure of flagstone and wallboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220482571 CN202810087U (en) 2012-09-11 2012-09-11 Connection structure of flagstone and wallboard

Publications (1)

Publication Number Publication Date
CN202810087U true CN202810087U (en) 2013-03-20

Family

ID=47868994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220482571 Expired - Fee Related CN202810087U (en) 2012-09-11 2012-09-11 Connection structure of flagstone and wallboard

Country Status (1)

Country Link
CN (1) CN202810087U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952097A (en) * 2016-07-01 2016-09-21 吴伟 Splicing type quick-mounting wall board and mounting method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952097A (en) * 2016-07-01 2016-09-21 吴伟 Splicing type quick-mounting wall board and mounting method

Similar Documents

Publication Publication Date Title
CN202672592U (en) Stone anchoring structure
CN106760164A (en) A kind of prefabricated panel with window opening and its installation splicing form
CN201679122U (en) Novel curtain wall structure
CN202810087U (en) Connection structure of flagstone and wallboard
CN103899036B (en) A kind of calcium silicate board with microporous compound insulating material wallboard
CN203654729U (en) Prefabricated type shear wall sleeve grouting and molding device
CN201424719Y (en) Composite heat insulating silicon calcium plate curtain wall
CN202194275U (en) Intermittent anti-drop auxiliary-frame curtain wall
CN202810084U (en) Connection structure of flagstone and wallboard
CN203201432U (en) Plastic steel window waterproof structure
CN203174957U (en) Arc-shaped stone honeycomb panel
CN202689203U (en) Anti-seep structure of construction joint
CN203256974U (en) Parapet wall waterproof structure
CN204112645U (en) Hanging-connecting light heat insulation and combination of decorations plate
CN202280218U (en) Strengthened-net hung nail
CN202787779U (en) Wall body structure with external calcium silicate boards
CN202731097U (en) Novel building energy-saving wall panel
CN205025024U (en) Semicircle wood wallboard
CN202248428U (en) Slotted sawtoothed back bolt stone curtain wall
CN204456465U (en) A kind of light inorganic heat preserving layer outer mounting structure
CN202689400U (en) Dry-hanging marble indent door opening structure
CN202809927U (en) Metal wall plate outside-hanging structure
CN203441010U (en) Tile roof cornice
CN202810055U (en) Face brick and decorative plate joint plug-in structure
CN203097136U (en) Waterproof roof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130320

Termination date: 20130911