CN202797859U - Concealed signal communication cable - Google Patents

Concealed signal communication cable Download PDF

Info

Publication number
CN202797859U
CN202797859U CN 201220260795 CN201220260795U CN202797859U CN 202797859 U CN202797859 U CN 202797859U CN 201220260795 CN201220260795 CN 201220260795 CN 201220260795 U CN201220260795 U CN 201220260795U CN 202797859 U CN202797859 U CN 202797859U
Authority
CN
China
Prior art keywords
signal
cable
built
logical
communication cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220260795
Other languages
Chinese (zh)
Inventor
曲凯
苗澍
刘林山
陈明非
汪娜
曲函
尹继新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG NORTH MINING MACHINERY CO Ltd
Original Assignee
SHENYANG NORTH MINING MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG NORTH MINING MACHINERY CO Ltd filed Critical SHENYANG NORTH MINING MACHINERY CO Ltd
Priority to CN 201220260795 priority Critical patent/CN202797859U/en
Application granted granted Critical
Publication of CN202797859U publication Critical patent/CN202797859U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model provides a concealed signal communication cable of a directional drilling machine for underground gas drilling and water surveying in a coal mine. The concealed signal communication cable is characterized in that, the conventional 333 communication cables are replaced by 16 communication cables, a concealed signal communication cable fixing frame is concealed inside a drill stem with a plug sealed, the sealed cables are concealed in a pipe body of the drill stem by a fixing plug, the concealed signal communication cable is winded on the concealed signal communication cable fixing frame with one end inserted into a hole bottom drill pipe socket while a highly sealed plug at the other end is concealed in the concealed signal communication cable, and the winded signal communication cable fixing frame with the signal communication cable is mounted in the drill stem. The concealed signal communication cable is advantageous in that, the measuring capability and accuracy are improved, and the measuring precision is improved; the drilling speed is obviously increased; the number of plug joints is reduced, so that poor contacts which are caused by the high humidity underground and the oxidation and corrosion of the plugs and influences the signal transmission are prevented; and the directional drilling efficiency of the directional drilling machine is significantly improved, and the precision of drilling trajectory is obviously improved.

Description

Built-in signal leads to cable
Technical field
The present invention relates to the exploration of a kind of pit of coal draws out methane and visits the measuring built-in signal of the directional drilling machine that discharges water, particularly a kind of directional drilling machine and lead to cable.
Background technology
The logical cable of built-in signal is that the directional drilling measurement-while-drilling system is brought into play the indispensable part of its effect, existing directional drilling machine measuring-signal is to be 3 meter one joint with the interior conducting cable of drilling rod, mutually peg graft, must 333 joints if make a call to the deep hole of a km, the chance of leaking like this is a lot, often too many because of joint in executing the brill process, the sealing of existing joint is to seal with sealing ring, because be to utilize water under high pressure as operation power in the drilling rod, the water under high pressure of 7Mpa is arranged in the drilling rod, often turn round when holing because of drilling rod again, bending force is larger, therefore often having drainage, drilling rod in a single day to leak wire will short circuit, and measurement will be failed.So just must pull out drilling rod from the hole, check leakage point, then replace this joint drilling rod, brill is executed in the effort of so repeatedly taking a lot of work impact.In drilling process, because drilling rod is constantly crooked, easier leaking in case signal short circuit 300 multiple-contacts do not know which contact leaks, searched the difficulty impact and executed and bore the effort of taking a lot of work.
Summary of the invention
The purpose of this utility model is the deficiency that exists in the above-mentioned technology, provides a kind of built-in signal to lead to cable.Adopt built-in signal to lead to the special grafting of cable, improve bonding strength and sealing.60 rice grain pattern cables can be hidden in the drilling rod, make the signal can not short circuit, measuring-signal be smooth and easy, accurately, has improved the accuracy rate of measuring.
The purpose of this utility model is achieved in that and comprises a logical cable of built-in signal with 60 meters long, the logical cable of built-in signal is hidden coil holder, the high sealing plug, the limit line length is inserted axle, the drilling rod spacing ring, built-in signal leads to cable linking springs, inserting tube socket at the bottom of the connecting hole, inserting tube plug, and drilling rod.It is characterized in that, change 16 logical cables into by existing 333 logical cables, the logical cable fixed mount of built-in signal is hidden in drilling rod inside, the plug sealing, and conduction property is good.The cable of good seal is hidden in the drill pipe body with locking-type plug.The logical cable of built-in signal is wrapped on the logical cable frame of built-in signal, and on the inserting tube socket, other end high sealing plug is hidden in the logical cable of built-in signal at the bottom of the end patchhole, then the logical cable frame of signal that winds is packed in the drilling rod together with the logical cable of signal.The logical cable socket of signal is installed in the probe front end at the bottom of the hole, and spacing ring is installed in the cable rack front end.Cable seal adopted double containment grafting sealing when holding wire connected.Use insulating material and encapsulating method.
The beneficial effects of the utility model are, utilize built-in signal to lead to the cable frame, are hidden in the drilling rod, reduce joint and avoid leaking, and the deviational survey system is installed at the bottom of the hole, reach with the purpose of boring deviational survey by the transmission of the logical cable of built-in signal to signal.Real realization can both to measure at the bottom of the hole, improve and measure accuracy rate at any time.The logical cable of built-in signal is hidden in the drilling rod cleverly, because the logical cable of built-in signal is long, it is smooth and easy to communicate by letter, and has improved measurement capability and accuracy.Original signal transmission grafting point is many, 333 joints are arranged, the more resistance of joint are larger, affect the signal transmission, this invention is owing to prolonged the logical cable length of built-in signal, and it is smooth and easy that the minimizing joint also just reduces resistance signal, and process the logical cable of nonstandard built-in signal and hide coil holder, so that signal measurement is convenient, accurately, improved certainty of measurement.Because the logical cable of built-in signal is long, the dress once logical cable of built-in signal can once creep into 20 drilling rods, has reduced unnecessary wait and non-cutting time, so that rate of penetration obviously improves.Because be 60 meters one the logical cable of signal, the signal transmission precision is high.The logical cable of built-in signal is long, has reduced the point of pegging graft and has avoided owing to the down-hole high humidity, and the plug oxidation corrosion causes loose contact to affect the signal transmission.Adopt the logical cable of built-in signal to overcome the shortcoming and defect of above-mentioned 3 meters one logical cable drilling rod, the directional drilling efficient of directional drilling machine is improved greatly, on the precision of drilling trace also by obvious improvement.To improving Safety of Coal Mine Production efficient important meaning is arranged.Adopt and use targetedly special material, make measuring-signal convenient, greatly improve and measure accuracy rate.
Description of drawings:
Fig. 1 is structural representation of the present utility model
Embodiment:
As shown in Figure 1, the logical cable 3 of built-in signal is wrapped on the logical cable frame 2 of built-in signal, at the bottom of the one end patchhole on the inserting tube socket 7, other end high sealing plug 6 is hidden in the logical cable of built-in signal, the logical cable linking springs 5 of built-in signal is installed on the high sealing plug 6, then pack in the drilling rod the logical cable frame 2 of the signal that winds into 9 together with the logical cable 3 of signal, the logical cable plug 8 of signal is installed at the bottom of the hole on the socket 7 at the bottom of the hole.Spacing ring 1 is installed in the logical cable frame front end of signal, it is 5mm that the front end of spacing ring has a land length, the external diameter of spacing ring boss is Φ 61mm, the external diameter of spacing ring is Φ 57 mm, and the internal diameter of spacing ring is M46, and the length of spacing ring is 42 mm, have a notch on the boss, be lowered to notch by spanner, spacing ring is stuck on the drilling rod inwall, make it the logical cable of the logical cable frame of signal and signal and under the promotion of 7Mpa water, can not glide.Next step water tail of just screwing on (part on the former rig) just can have been drilled, and backs out the water tail for 3 meters after squeezing into next root drilling rod, take out to ensconce the plug of high sealing plug 6 on the logical cable frame of signal, and inserting computer just can measuring-signal.Next step extracts the logical cable frame 2 of signal again, back out spacing ring 1, at upper second drilling rod, the logical cable frame of signal is passed in the middle of second drilling rod, pull up holding wire limit shaft 4, emit the logical cable of 3 meters signals from the logical cable frame of signal, then plug limit shaft, the drilling rod spacing ring 1 of screwing on is twisted good drilling rod, the water tail of screwing on just can continue to drill, so repeatedly.60 meters signal cables are installed in 20 drilling rods, and signal cable is protected with dielectric voltage withstand.Cable core place packing there is insulating sleeve.The logical cable length of built-in signal is 60 meters, or 70 meters, or 80 meters, or 90 meters, or 100 meters.Or longer linear meter.The logical cable of built-in signal is selected 4 ㎡ cables.

Claims (5)

1. a built-in signal leads to cable, comprise a logical cable of built-in signal with 60 meters long, the logical cable of built-in signal is hidden coil holder, the high sealing plug, the limit line length is inserted axle, the drilling rod spacing ring, built-in signal leads to the cable linking springs, inserting tube socket at the bottom of the connecting hole, inserting tube plug, and drilling rod, it is characterized in that, change 16 logical cables into by existing 333 logical cables, the logical cable fixed mount of built-in signal is hidden in drilling rod inside, the plug sealing, the cable of good seal is hidden in the drill pipe body with locking-type plug, the logical cable of built-in signal is wrapped on the logical cable frame of built-in signal, and on the inserting tube socket, other end high sealing plug is hidden in the logical cable of built-in signal at the bottom of the end patchhole, then the logical cable frame of the signal that winds is packed in the drilling rod together with the logical cable of signal, the inserting tube socket is installed in the probe front end at the bottom of the hole, and spacing ring is installed in logical cable frame front end, and cable seal adopted double containment grafting sealing when holding wire connected.
2. built-in signal according to claim 1 leads to cable, it is characterized in that: the logical cable of built-in signal is selected 4 ㎡ cables.
3. the logical cable of built-in signal according to claim 1 is characterized in that: be respectively charged in 20 drilling rods by 60 meters holding wires.
4. the logical cable of built-in signal according to claim 1 is characterized in that: cable core place packing is had insulating sleeve.
5. built-in signal according to claim 1 leads to cable, it is characterized in that: the logical cable length of built-in signal is 60 meters, or 70 meters, or 80 meters, or 90 meters, or 100 meters.
CN 201220260795 2012-06-05 2012-06-05 Concealed signal communication cable Expired - Fee Related CN202797859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220260795 CN202797859U (en) 2012-06-05 2012-06-05 Concealed signal communication cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220260795 CN202797859U (en) 2012-06-05 2012-06-05 Concealed signal communication cable

Publications (1)

Publication Number Publication Date
CN202797859U true CN202797859U (en) 2013-03-13

Family

ID=47825037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220260795 Expired - Fee Related CN202797859U (en) 2012-06-05 2012-06-05 Concealed signal communication cable

Country Status (1)

Country Link
CN (1) CN202797859U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798645A (en) * 2018-06-07 2018-11-13 永城煤电控股集团有限公司 Following formula inclination measurement system in following formula inclination measurement device and drilling rod in a kind of drilling rod
CN111430965A (en) * 2020-03-31 2020-07-17 郑东升 Bus connector and cabinet combining structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798645A (en) * 2018-06-07 2018-11-13 永城煤电控股集团有限公司 Following formula inclination measurement system in following formula inclination measurement device and drilling rod in a kind of drilling rod
CN111430965A (en) * 2020-03-31 2020-07-17 郑东升 Bus connector and cabinet combining structure

Similar Documents

Publication Publication Date Title
CN100513743C (en) Near-bit logging data motor-passing wired transmission device
CN103390816B (en) Electric connector
CN103603651B (en) Devices and methods for testing the stability of coal seam gas extraction drilled holes
CN111323331B (en) Coal seam gas content measuring device and method based on directional drilling machine
CN103498664A (en) Device and method for measuring real-time track of rotary drilling while drilling
CN202797859U (en) Concealed signal communication cable
CN203589673U (en) Downhole instrument connection cable sealing structure
CN201318166Y (en) Plugging direct reading and pressure testing integrated device
CN203685169U (en) Offshore pressure measurement system with capillary tube
CN206096487U (en) Shallow shake appearance
CN202578663U (en) Oilfield down-hole multi-parameter measurement system
CN201265412Y (en) Down-hole tube diameter and tube position temperature tester
CN101684647B (en) Rotary type static sounding probe
CN204113278U (en) Test string for gas storage
CN203574114U (en) Multi-core anti-compression cylindrical multifunctional quick signal connector
CN104078795A (en) Underground sealing connection device of earthquake monitoring equipment and assembling method thereof
CN205117238U (en) Drill collar is hung to no magnetcisuspension
CN104895559A (en) Oil-gas well downhole optical fiber temperature and pressure test instrument
CN205159693U (en) Test connection structure who seals nipple joint and measure and regulate nipple joint
CN207526491U (en) Drill type micro-wave water holding instrument component
CN203476317U (en) Real-time track measurement while drilling device for rotary drilling
CN209102245U (en) A kind of underwater tension measuring device
CN201351491Y (en) Cored flexible nipple for horizontal well logging
CN205135597U (en) Horizontal well rod conveying logging process rod pipe column
CN105140717A (en) Blind plugging type connecting device used for mine measurement while drilling nipples

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20160605

CF01 Termination of patent right due to non-payment of annual fee