CN202779903U - Processing device for brake hub - Google Patents
Processing device for brake hub Download PDFInfo
- Publication number
- CN202779903U CN202779903U CN 201220342949 CN201220342949U CN202779903U CN 202779903 U CN202779903 U CN 202779903U CN 201220342949 CN201220342949 CN 201220342949 CN 201220342949 U CN201220342949 U CN 201220342949U CN 202779903 U CN202779903 U CN 202779903U
- Authority
- CN
- China
- Prior art keywords
- drilling machine
- contact
- brake hub
- making switch
- pneumatic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Drilling And Boring (AREA)
Abstract
The utility model provides a processing device for a brake hub. The processing device comprises a multi-shaft driller and a multi-shaft borer arranged on the multi-shaft driller, the multi-shaft borer is provided with a plurality of drill bits, the multi-shaft driller is provided with a pneumatic three-jaw chuck which is positioned right below and on a same vertical center line with the multi-shaft borer and connected with a first contact switch and a second contact switch which is positioned below the first contact switch, and when the multi-shaft borer moves downwards, the multi-shaft borer sequentially contacts with the first contact switch and the second contact switch independently. The processing device for the brake hub is simple in structure, easy to mount and clamp and simple in operation, the pneumatic three-jaw chuck automatically clamp and release the brake hub, and processing of a plurality of hole sites at the same time can be achieved by once mounting and clamping of the brake hub, so that labor efficiency and processing accuracy can be substantially improved, and labor intensity can be greatly lowered for operators.
Description
Technical field
The utility model relates to machinery processing apparatus, relates in particular to a kind of processing unit (plant) of brake hub.
Background technology
The position, hole of brake hub has position, 6 hole, position, 8 hole usually, and position, 18 hole is set, and the motorcycle brake hub industry generally adopts the single hole position to process one by one when several positions, hole of processing brake hub at present.This single hole position its production efficiency of processing mode one by one is low, machining accuracy is not high, labour intensity is large, and the processing of single hole position is lost time, and increases operator's labour intensity, and deviation can occur the position degree of product after repeatedly processing, the impact assembling.
The utility model content
The technical problem that the utility model solves is: a kind of processing unit (plant) of brake hub is provided, can conveniently carries out accurate machining to several positions, hole of brake hub simultaneously.
The technical solution of the utility model is: a kind of processing unit (plant) of brake hub, comprise multi spindle drilling machine and the multi-axis drilling machine that is arranged on the multi spindle drilling machine, it is characterized in that, described multi-axis drilling machine is provided with some brill flowers, also be provided with pneumatic three-jaw chuck on the described multi spindle drilling machine, this pneumatic three-jaw chuck be positioned at described multi-axis drilling machine under, and pneumatic three-jaw chuck and multi-axis drilling machine are positioned on the same vertical center line; Described pneumatic three-jaw chuck is connected with the first contact-making switch and the second contact-making switch, described the first contact-making switch and described the second contact-making switch are all near multi-axis drilling machine, and the first contact-making switch is positioned at the top of described the second contact-making switch, when multi-axis drilling machine moves down, multi-axis drilling machine successively with the first contact-making switch, the second contact-making switch between single the contact, described pneumatic three-jaw chuck is in clamped condition when multi-axis drilling machine contacts with the first contact-making switch, and described pneumatic three-jaw chuck is in releasing orientation when multi-axis drilling machine contacts with the second contact-making switch.
Described pneumatic three-jaw chuck upper surface is provided with alignment pin.
Described multi-axis drilling machine is provided with 18 and bores flower, and described brill flower is positioned on the same circumference of multi-axis drilling machine lower surface.
Described multi spindle drilling machine is connected with hydraulic oil container by high-pressure oil pipe.
Be provided with overflow valve and magnetic valve between described high-pressure oil pipe and the described hydraulic oil container.
The beneficial effects of the utility model are: when the utility model uses, brake hub is placed on the pneumatic three-jaw chuck, when multi-axis drilling machine moves downward work, touch simultaneously the first contact-making switch, this moment, pneumatic three-jaw chuck was with the brake hub Automatic-clamping, until the some brill flowers on the multi-axis drilling machine machine some Kong Weihou of respective amount at brake hub, when multi-axis drilling machine touches the second contact-making switch, pneumatic three-jaw chuck unclamps brake hub automatically, at this moment just can take off brake hub, multi-axis drilling machine is returned to original position.The utility model clamping that is easy to simple in structure, simple to operate, pneumatic three-jaw chuck can Automatic-clamping brake hub and take-off the brake hub, finish simultaneously the processing of position, some holes with the clamped one time brake hub, efficiency and machining accuracy can not only be increased substantially, and operator's labour intensity can also be reduced greatly.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples:
Referring to Fig. 1, a kind of processing unit (plant) of brake hub comprises multi spindle drilling machine 1 and the multi-axis drilling machine 2 that is arranged on the multi spindle drilling machine 1, and multi-axis drilling machine 2 is provided with 18 brills and spends 3,18 brills to spend 3 to be positioned on the same circumference of multi-axis drilling machine 2 lower surfaces.Also be provided with pneumatic three-jaw chuck 4 on the multi spindle drilling machine 1, this pneumatic three-jaw chuck 4 be positioned at multi-axis drilling machine 2 under, and pneumatic three-jaw chuck 4 is positioned on the same vertical center line with multi-axis drilling machine 2.Pneumatic three-jaw chuck 4 is connected with the first contact-making switch 5 and the second contact-making switch 6, the first contact-making switch 5 and the second contact-making switch 6 are all near multi-axis drilling machine 2, and the first contact-making switch 5 is positioned at the top of the second contact-making switch 6, when multi-axis drilling machine 2 downward work are mobile, multi-axis drilling machine 2 successively with the first contact-making switch 5, the second contact-making switch 6 between single the contact, namely multi-axis drilling machine 2 can not contact with the second contact-making switch 6 with the first contact-making switch 5 simultaneously.Pneumatic three-jaw chuck 4 is in clamped condition and clamps brake hub 7 when multi-axis drilling machine 2 contacts with the first contact-making switch 5, and pneumatic three-jaw chuck 4 is in releasing orientation take-off the brake hub 7 when multi-axis drilling machine 2 contacts with the second contact-making switch 6.Pneumatic three-jaw chuck 4 upper surfaces are provided with alignment pin 8, the location when alignment pin 8 is placed on the pneumatic three-jaw chuck 4 for brake hub 7.Multi spindle drilling machine 1 is connected with hydraulic oil container 10 by high-pressure oil pipe 9.Be provided with overflow valve 11 and magnetic valve 12 between high-pressure oil pipe 9 and the hydraulic oil container 10.
The utility model is like this work: brake hub 7 is placed on the pneumatic three-jaw chuck 4, multi spindle drilling machine 1 passes through hydraulic oil, motor 13 rotations and control panel 14 and gauge tap 15 are worked multi-axis drilling machine 2 downwards, when multi-axis drilling machine 1 moves downward work, touch simultaneously the first contact-making switch 5, this moment, pneumatic three-jaw chuck was with the brake hub Automatic-clamping, until 18 on the multi-axis drilling machine bore flower machines correspondence at brake hub 7 18 Kong Weihou, when multi-axis drilling machine 2 touches the second contact-making switch 6, pneumatic three-jaw chuck 4 unclamps brake hub 7 automatically, at this moment just can take off brake hub 7, multi-axis drilling machine 2 is returned to original position.The utility model clamping that is easy to simple in structure, simple to operate, pneumatic three-jaw chuck can Automatic-clamping brake hub and take-off the brake hub, finish simultaneously the processing of position, some holes with the clamped one time brake hub, efficiency and machining accuracy can not only be increased substantially, and operator's labour intensity can also be reduced greatly.
Claims (5)
1. the processing unit (plant) of a brake hub, comprise multi spindle drilling machine and the multi-axis drilling machine that is arranged on the multi spindle drilling machine, it is characterized in that: described multi-axis drilling machine is provided with some brill flowers, also be provided with pneumatic three-jaw chuck on the described multi spindle drilling machine, this pneumatic three-jaw chuck be positioned at described multi-axis drilling machine under, and pneumatic three-jaw chuck and multi-axis drilling machine are positioned on the same vertical center line; Described pneumatic three-jaw chuck is connected with the first contact-making switch and the second contact-making switch, described the first contact-making switch and described the second contact-making switch are all near multi-axis drilling machine, and the first contact-making switch is positioned at the top of described the second contact-making switch, when multi-axis drilling machine moves down, multi-axis drilling machine successively with the first contact-making switch, the second contact-making switch between single the contact, described pneumatic three-jaw chuck is in clamped condition when multi-axis drilling machine contacts with the first contact-making switch, and described pneumatic three-jaw chuck is in releasing orientation when multi-axis drilling machine contacts with the second contact-making switch.
2. according to the processing unit (plant) of brake hub claimed in claim 1, it is characterized in that: described pneumatic three-jaw chuck upper surface is provided with alignment pin.
3. according to the processing unit (plant) of brake hub claimed in claim 1, it is characterized in that: described multi-axis drilling machine is provided with 18 and bores flower, and described brill flower is positioned on the same circumference of multi-axis drilling machine lower surface.
4. according to the processing unit (plant) of brake hub claimed in claim 1, it is characterized in that: described multi spindle drilling machine is connected with hydraulic oil container by high-pressure oil pipe.
5. according to the processing unit (plant) of brake hub claimed in claim 4, it is characterized in that: be provided with overflow valve and magnetic valve between described high-pressure oil pipe and the described hydraulic oil container.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220342949 CN202779903U (en) | 2012-07-16 | 2012-07-16 | Processing device for brake hub |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220342949 CN202779903U (en) | 2012-07-16 | 2012-07-16 | Processing device for brake hub |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202779903U true CN202779903U (en) | 2013-03-13 |
Family
ID=47807245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220342949 Expired - Lifetime CN202779903U (en) | 2012-07-16 | 2012-07-16 | Processing device for brake hub |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202779903U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103158042A (en) * | 2013-03-29 | 2013-06-19 | 上海坤孚企业(集团)有限公司 | Multistation machining device |
CN104493243A (en) * | 2014-12-17 | 2015-04-08 | 天津市滨海奥杰阀门有限公司 | Perforating device of bonnet connecting hole of flange lift type check valve |
CN106140939A (en) * | 2016-08-26 | 2016-11-23 | 叶青 | A kind of bolt hole process equipment of wheel hub |
-
2012
- 2012-07-16 CN CN 201220342949 patent/CN202779903U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103158042A (en) * | 2013-03-29 | 2013-06-19 | 上海坤孚企业(集团)有限公司 | Multistation machining device |
CN104493243A (en) * | 2014-12-17 | 2015-04-08 | 天津市滨海奥杰阀门有限公司 | Perforating device of bonnet connecting hole of flange lift type check valve |
CN106140939A (en) * | 2016-08-26 | 2016-11-23 | 叶青 | A kind of bolt hole process equipment of wheel hub |
CN106140939B (en) * | 2016-08-26 | 2018-08-03 | 吴茂根 | A kind of bolt hole process equipment of wheel hub |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201357251Y (en) | Drill jig for machining cylinder head hole | |
CN201357254Y (en) | Rotary jig for drilling side holes of oil sump | |
CN202292179U (en) | Positioning tool used for processing hole diameter of cylinder | |
CN203003556U (en) | Hydraulic quick-change clamp for drilling and tapping machining of belt pulley | |
CN203956590U (en) | The pneumatic pinch machining center clamp of a kind of V-block location | |
CN202779903U (en) | Processing device for brake hub | |
CN202180355U (en) | Pneumatic clamping device for processing workpieces of numerical control machine | |
CN204075814U (en) | A kind of adjustment hole machining center clamp | |
CN202639941U (en) | Fixture for vertical machining center | |
CN202964203U (en) | Fixture used for processing engine connecting rod oil hole | |
CN102009207A (en) | Tool for drilling central holes of steering knuckle arm | |
CN203409510U (en) | Workpiece drilling and tapping device | |
CN202490988U (en) | Multiple-spindle tapping device | |
CN203863394U (en) | Clamp special for combined drilling of transmission control connection assembly | |
CN203804615U (en) | Device capable of improving accuracy in perpendicularity of cross-hole drilling | |
CN203664745U (en) | Continuous laminated hole machining device | |
CN203956592U (en) | Wheel hub oil filler point tool for processing | |
CN202726121U (en) | Locating mould for machining top-loading valve body base screw hole | |
CN202155552U (en) | Multi-station drilling device | |
CN202964142U (en) | Diesel engine four-cylinder exhaust pipe drilling tool clamped for one time | |
CN204294972U (en) | Drilling equipment | |
CN203470954U (en) | Drilling device for machining directional machine of motorcycle | |
CN203371303U (en) | Combination machining device | |
CN204912444U (en) | Six jar house steward cut -out press | |
CN202951898U (en) | Machine tool special for butting borings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130313 |
|
CX01 | Expiry of patent term |