CN202745032U - Novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations - Google Patents

Novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations Download PDF

Info

Publication number
CN202745032U
CN202745032U CN 201220416340 CN201220416340U CN202745032U CN 202745032 U CN202745032 U CN 202745032U CN 201220416340 CN201220416340 CN 201220416340 CN 201220416340 U CN201220416340 U CN 201220416340U CN 202745032 U CN202745032 U CN 202745032U
Authority
CN
China
Prior art keywords
foundation
concrete
layer
slabstone
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220416340
Other languages
Chinese (zh)
Inventor
柴艳飞
王存贵
余流
张云富
陆海英
黄克起
方杰
高璞
朱芳
季忠原
徐晋奇
孙伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN 201220416340 priority Critical patent/CN202745032U/en
Application granted granted Critical
Publication of CN202745032U publication Critical patent/CN202745032U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations which comprise a foundation trench. A single mound foundation layer is arranged in the foundation trench. A hard concrete layer is arranged on the single mound foundation layer. A cement mortar layer is arranged on the hard concrete layer. The novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations have the advantages of improving bearing capacity of the single mound composite foundation remarkably, avoiding bulges and bottom diapirism of side face of the single mound composite foundation and reducing construction cost tremendously.

Description

A kind of Novel dry rigid concrete-slabstone dynamic replacement list pier composite foundation
Technical field
The utility model relates to a kind of building lot, especially relates to a kind of Novel dry rigid concrete-slabstone dynamic replacement list pier composite foundation.
Background technology
At present, in civil engineering, traffic engineering, in the processing of the soft foundation such as municipal engineering and hydraulic engineering, ground for single pier adopts heavy tamping replacement method usually, it namely mainly is stone filling in foundation ditch, the coarse granule such as rubble and jackstone discrete material, ram the continuous dynamic replacement list pier ground of formation with hammer ram, the amplitude that single pier bearing capacity of foundation soil of processing with existing these heavy tamping replacement methods improves is little, the side bulging and the single pier ground basal part that easily single pier ground occur pierce through destruction, and the ground that forms can not be directly as the post of superstructure or the basis of wall, not only cause huge economic loss, and stayed huge potential safety hazard to superstructure.
The utility model content
The purpose of this utility model is just in order to solve above-mentioned deficiency of the prior art, provide a kind of and can increase substantially single pier bearing capacity of foundation soil, the side of single pier ground avoids that also bulging occurs and pierce through the bottom, and a kind of Novel dry rigid concrete of great reducing construction cost-slabstone dynamic replacement list pier composite foundation.
The purpose of this utility model is achieved by following technical proposals: a kind of Novel dry rigid concrete-slabstone dynamic replacement list pier composite foundation, comprise foundation ditch, and be provided with single pier foundation layer in the described foundation ditch; Be provided with the harsh concrete layer above described single pier foundation layer, be provided with cement sand bed above the described harsh concrete layer.
Described single pier foundation layer is that harsh concrete and slabstone mix formation.
Described slabstone is large diameter block of stone or jackstone a kind of formation wherein.
The beneficial effects of the utility model are: adopt three layer construction to consist of single pier composite foundation, its basal layer adopts harsh concrete and slabstone to mix formation, not only can improve the bearing capacity of ground, can also greatly save engineering cost, the harsh concrete layer and the cement sand bed that on basal layer, arrange, played in its scope and to have reinforced and the effect of levelling, provide a firm basic platform for the post of superstructure or the basis of wall simultaneously.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described:
As shown in Figure 1, a kind of Novel dry rigid concrete-slabstone dynamic replacement list pier composite foundation, comprise foundation ditch, be provided with single pier foundation layer 1 in the described foundation ditch, described single pier foundation layer 1 is that harsh concrete and slabstone mix formation, and described slabstone is large diameter block of stone or jackstone a kind of formation wherein; The utility model is provided with harsh concrete layer 2 on described single pier foundation layer 1, be provided with cement sand bed 3 above the described harsh concrete layer 2.
Job practices of the present utility model is:
(1) according to the superstructure load, carries out the calculation Design of harsh concrete match ratio;
(2) determine accurately that with transit each replaces the position of single pier, and make marks;
(3) harsh concrete and the slabstone for preparing mixed by a certain percentage, ram with dynamic compaction machinery and fill out in the bottom, and compacting;
(4) with tamping machine the harsh concrete rammer is filled out on the multiple top of dynamic replacement list pier, and compacting;
(5) dynamic replacement Dan Dun top reinforces dynamic replacement list pier along the top certain limit with cement mortar, and levelling, and straw mat is spread on top, carries out maintenance.
The utility model not only can be strengthened the bearing capacity on top self, and can provide a basic platform for the post of superstructure or the basis of wall.

Claims (3)

1. Novel dry rigid concrete-slabstone dynamic replacement list pier composite foundation comprises foundation ditch, it is characterized in that, is provided with single pier foundation layer in the described foundation ditch; Be provided with the harsh concrete layer above described single pier foundation layer, be provided with cement sand bed above the described harsh concrete layer.
2. require 1 described Novel dry rigid concrete-slabstone dynamic replacement list pier composite foundation according to brute force, it is characterized in that, described single pier foundation layer is that harsh concrete and slabstone mix formation.
3. Novel dry rigid concrete according to claim 2-slabstone dynamic replacement list pier composite foundation is characterized in that, described slabstone is large diameter block of stone or jackstone a kind of formation wherein.
CN 201220416340 2012-08-21 2012-08-21 Novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations Expired - Fee Related CN202745032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220416340 CN202745032U (en) 2012-08-21 2012-08-21 Novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220416340 CN202745032U (en) 2012-08-21 2012-08-21 Novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations

Publications (1)

Publication Number Publication Date
CN202745032U true CN202745032U (en) 2013-02-20

Family

ID=47704455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220416340 Expired - Fee Related CN202745032U (en) 2012-08-21 2012-08-21 Novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations

Country Status (1)

Country Link
CN (1) CN202745032U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594330A (en) * 2015-01-16 2015-05-06 刘献刚 Method for treating high-strength replacement pier composite ground foundation and high-strength replacement pier

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594330A (en) * 2015-01-16 2015-05-06 刘献刚 Method for treating high-strength replacement pier composite ground foundation and high-strength replacement pier

Similar Documents

Publication Publication Date Title
CN107419630B (en) Soft soil foundation high-filling embankment capable of effectively controlling post-construction settlement and construction method
CN201495468U (en) Structure of highway subgrade on wet soft foundation
CN102425082A (en) Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway
CN203174619U (en) Reverse raft concrete terrace
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN202416195U (en) Pier deviation correcting and reinforcing system
CN203462484U (en) Existing retaining wall reinforcement structure
CN202247575U (en) Structure for strengthening roadbed in high-speed railway station turnout area with highly developed karst
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN109680671A (en) A kind of liquefaction foundation treatment method based on building waste
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN202220341U (en) Support structure for foundation pit in sludge
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN202745032U (en) Novel hard-concrete-rubble dynamic compaction replacement single mound composite foundations
CN201330403Y (en) Composite foundation with lateral confinement structure
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN101736730A (en) Mixed reinforcement method of high-fill sand foundation
CN110172980A (en) A kind of coarse grain block stone superelevation fill foundation ruggedized construction and its construction method
CN203007761U (en) Grouting reinforcement structure for steel floral tube of existing railway roadbed under operation condition
CN201809777U (en) Silently-pressed mini-group-pile foundation for transmission line towers
CN203256771U (en) Semi-gravity type column and board combined retaining wall structure
CN201981530U (en) Down hole deep dynamic compaction pile in collapsible loess area
CN205420939U (en) Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw
CN204530685U (en) A kind of cement-soil stiff composite pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20180821