CN202718071U - 降低库区淤沙的拦河坝结构 - Google Patents

降低库区淤沙的拦河坝结构 Download PDF

Info

Publication number
CN202718071U
CN202718071U CN201220440398.7U CN201220440398U CN202718071U CN 202718071 U CN202718071 U CN 202718071U CN 201220440398 U CN201220440398 U CN 201220440398U CN 202718071 U CN202718071 U CN 202718071U
Authority
CN
China
Prior art keywords
dam
barrage
spillover
rubber
weir crest
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220440398.7U
Other languages
English (en)
Inventor
陈艳丽
王勇
代巧枝
宋海印
宋修昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201220440398.7U priority Critical patent/CN202718071U/zh
Application granted granted Critical
Publication of CN202718071U publication Critical patent/CN202718071U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

本实用新型公开了一种降低库区淤沙的拦河坝结构,包括设置在主河槽内的拦河坝溢流坝段,溢流坝为重力式结构,溢流坝的坝后与消能设施衔接;在溢流坝堰顶设置有橡胶坝,橡胶坝锚固在溢流坝堰顶,用于橡胶坝充、排水的管路布置在溢流坝堰顶混凝土结构内。本实用新型优点在于采取在拦河坝溢流坝堰顶设置橡胶坝这种结构,与常规闸坝式排沙泄流建筑相比,不再设闸门及启闭设备,整个建筑结构形式简单;溢流坝采用重力式结构,钢筋用量少,施工速度快;橡胶坝靠水泵充排水控制,其坝袋和操作控制***造价低。按照本实用新型建造的拦河坝充分利用了水力资源,大大节省了工程投资,提高了电站的开发效益。

Description

降低库区淤沙的拦河坝结构
技术领域
本实用新型涉及用于堤坝式电站的排沙泄洪建筑,尤其是涉及降低库区淤沙的拦河坝结构。
背景技术
在水电站梯级开发特别是低水头堤坝式电站开发中,上、下游电站间可利用水头显得异常珍贵,它能直接影响电站的投资价值。要想最大限度地利用水头,必须解决排沙泄洪问题,使库尾泥沙淤积和回水位不影响上游电站的正常发电和防洪安全。目前的常规做法是将泄洪排沙建筑布置成闸坝型式。而这种靠闸门控制的布置型式,结构较复杂,闸门及启闭设备投资很高,会使许多电站失去了投资开发价值,造成水力势能的浪费。
发明内容
本实用新型目的在于提供一种结构简单、工程造价低廉的降低库区淤沙的拦河坝结构。
为实现上述目的,本实用新型采取下述技术方案:
本实用新型所述降低库区淤沙的拦河坝结构,包括设置在主河槽内的拦河坝溢流坝段,所述溢流坝为重力式结构,溢流坝的坝后与消能设施衔接;在溢流坝堰顶设置有橡胶坝,所述橡胶坝锚固在溢流坝堰顶,用于橡胶坝充、排水的管路布置在溢流坝堰顶混凝土结构内。
本实用新型优点在于采取在拦河坝溢流坝堰顶设置橡胶坝这种结构,与常规闸坝式排沙泄流建筑相比,不再设闸门及启闭设备,整个建筑结构形式简单;溢流坝采用重力式结构,钢筋用量少,施工速度快;橡胶坝靠水泵充排水控制,其坝袋和操作控制***造价低。按照本实用新型建造的拦河坝充分利用了水力资源,大大节省了工程投资,提高了电站的开发效益。
附图说明
图1是本实用新型的结构示意图。
具体实施方式
如图1所示,本实用新型所述降低库区淤沙的拦河坝结构,包括设置在主河槽内的拦河坝溢流坝1段,所述溢流坝1为重力式结构,溢流坝1的坝后与消能设施6衔接,溢流坝1的长度根据河道宽度确定,;在溢流坝1堰顶设置有橡胶坝2,所述橡胶坝2锚固在溢流坝1堰顶;水库正常蓄水位根据各种工况回水不抬高上游电站发电尾水位确定,橡胶坝2顶高程3设置高出水库正常蓄水位的0.1-0.2m;溢流坝1堰顶高程4根据库尾淤沙末端不超过上游电站尾水出口位置确定。用于橡胶坝2充、排水的管路5布置在溢流坝1堰顶混凝土结构内,控制泵房设置在靠近溢流坝1段适当位置。
水库正常运行时,利用溢流坝1堰顶的橡胶坝2立坝挡水壅高水位,壅高水位以不高于上游电站发电尾水为准;洪水期间,橡胶坝2塌坝泄洪排沙,控制坝前泥沙淤积不超过溢流坝1堰顶高程4、库区淤沙末端不超过上游电站尾水出口。

Claims (1)

1.一种降低库区淤沙的拦河坝结构,其特征在于:包括设置在主河槽内的拦河坝溢流坝(1)段,所述溢流坝(1)为重力式结构,溢流坝(1)的坝后与消能设施(6)衔接;在溢流坝(1)堰顶设置有橡胶坝(2),所述橡胶坝(2)锚固在溢流坝(1)堰顶,用于橡胶坝(2)充、排水的管路(5)布置在溢流坝(1)堰顶混凝土结构内。
CN201220440398.7U 2012-08-31 2012-08-31 降低库区淤沙的拦河坝结构 Expired - Lifetime CN202718071U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220440398.7U CN202718071U (zh) 2012-08-31 2012-08-31 降低库区淤沙的拦河坝结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220440398.7U CN202718071U (zh) 2012-08-31 2012-08-31 降低库区淤沙的拦河坝结构

Publications (1)

Publication Number Publication Date
CN202718071U true CN202718071U (zh) 2013-02-06

Family

ID=47619897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220440398.7U Expired - Lifetime CN202718071U (zh) 2012-08-31 2012-08-31 降低库区淤沙的拦河坝结构

Country Status (1)

Country Link
CN (1) CN202718071U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410086A (zh) * 2013-07-23 2013-11-27 李尚喜 一种新型水闸消力设施与施工
CN105821815A (zh) * 2016-04-01 2016-08-03 山东省水利科学研究院 一种用于过流鼻坎的防护装置
WO2021143329A1 (zh) * 2020-01-14 2021-07-22 浙江大学 一种用于高桩码头后方防淤的充水式橡胶坝冲排沙***

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410086A (zh) * 2013-07-23 2013-11-27 李尚喜 一种新型水闸消力设施与施工
CN105821815A (zh) * 2016-04-01 2016-08-03 山东省水利科学研究院 一种用于过流鼻坎的防护装置
CN105821815B (zh) * 2016-04-01 2017-07-14 山东省水利科学研究院 一种用于过流鼻坎的防护装置
WO2021143329A1 (zh) * 2020-01-14 2021-07-22 浙江大学 一种用于高桩码头后方防淤的充水式橡胶坝冲排沙***

Similar Documents

Publication Publication Date Title
CN103510493B (zh) 过水低坝洞库式水电站
CN103306250B (zh) 一种隧道内引水式梯级水电站及其建设方法
CN203846465U (zh) 放空洞或非常泄洪洞布置***
CN201874614U (zh) 引水隧洞放空检修排水结构
CN202323895U (zh) 用于阶梯式水利枢纽的尾水渠结构
CN103410130A (zh) 一种多用途隧洞布置结构
CN203429606U (zh) 一种临时围堰改建而成的拦沙坎
CN202718071U (zh) 降低库区淤沙的拦河坝结构
CN202181543U (zh) 一种泄洪隧洞结构
CN203320497U (zh) 一种电站的尾水检修闸门
CN204919482U (zh) 一种利用钢管拍门的导流洞快速封堵结构
CN204753696U (zh) 山区河道用的取水结构
CN104674772A (zh) 一种改善闸坝进口拉沙效果的方法及结构
CN206529749U (zh) 一种兼顾环保及排沙需求的电站发电引水建筑物布置结构
CN104099909B (zh) 基于泄洪隧洞的泄洪发电同步组合消能工
CN117513260A (zh) 结合导流洞、泄放洞和竖井式泄洪洞的泄流结构
CN206752427U (zh) 一种水电站地面厂房尾水出口结构及其水电站
CN102797240A (zh) 降低库区淤沙的拦河坝建造方法
CN205604193U (zh) 一种高坝水库放空装置
CN204982820U (zh) 用于高拱坝导流底孔的闸室布置结构
CN204715318U (zh) 一种山体内导流洞闸门井结构
CN202265807U (zh) 用于导流泄水建筑物的闸室
CN204163061U (zh) 水电泄水沟消能结构
CN204000796U (zh) 河床式水电站结构
CN102352617B (zh) 灯泡贯流式水电站厂房导流的施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130206