CN202711056U - Generator set controller self-examination device - Google Patents

Generator set controller self-examination device Download PDF

Info

Publication number
CN202711056U
CN202711056U CN 201220243695 CN201220243695U CN202711056U CN 202711056 U CN202711056 U CN 202711056U CN 201220243695 CN201220243695 CN 201220243695 CN 201220243695 U CN201220243695 U CN 201220243695U CN 202711056 U CN202711056 U CN 202711056U
Authority
CN
China
Prior art keywords
generator set
set controller
oil pressure
controller
contact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220243695
Other languages
Chinese (zh)
Inventor
卜艳红
钟伟亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIHAO POWER SUPPLY TECHNOLOGY CO LTD
Original Assignee
TAIHAO POWER SUPPLY TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIHAO POWER SUPPLY TECHNOLOGY CO LTD filed Critical TAIHAO POWER SUPPLY TECHNOLOGY CO LTD
Priority to CN 201220243695 priority Critical patent/CN202711056U/en
Application granted granted Critical
Publication of CN202711056U publication Critical patent/CN202711056U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

The utility model discloses a generator set controller self-examination device, comprising an oil pressure potentiometer, a generator set controller, oil valve relays, a voltage detection port, an analog input port. The device is characterized in that electric supply is respectively connected with a contact of normally open contacts of the binary output point oil valve relays of the generator set controller through the oil pressure potentiometer, and the other contact is respectively connected with the voltage detection port and the analog input port of the generator set controller. The device is simple, easy in implementation, and low in cost, and plays a great guiding part in simulating and debugging of the generator set controller.

Description

A kind of generator set controller is checked oneself device
Technical field
The utility model relates to a kind of device of checking oneself, and relates in particular to a kind of generator set controller and checks oneself device.
Background technology
In the debugging of being transported to electric system of host computer to genset monitoring and PLC control; and the genset occasion of separating with gen-set control system; the operational process that needs simulation generator set; but starter-generator group controller only; because controller can't read generating voltage value and oil pressure value; the controller shutdown of can reporting to the police; causing can't communication with host computer; whether the design concept that also can't test the generator set control circuit is correct; whether the wiring circuit is normal, whether reaches expectation function.Based on above-mentioned background, proposed a kind of gen-set control system and checked oneself circuit.
Summary of the invention
The purpose of this utility model is to provide a kind of generator set controller to check oneself device; process by generator set control line simulation unit operation; solve in host computer and the control system communication debugging and repeat the start and stop problem, and can be used as that PLC controls be transported to the electric system function debugging.
The utility model is to realize like this, it comprises oil pressure potentiometer, generator set controller, fuel tap relay, voltage detecting port, analog input port, it is characterized in that civil power and oil pressure potentiometer are received respectively the contact of normally opened contact of the scale-of-two output point fuel tap relay of generator set controller, voltage detecting port and the analog input port of generator set controller guided to respectively in the another one contact.
After generator set controller sends startup command, scale-of-two output point fuel tap relay closes is often opened the auxiliary contact closure, and civil power and oil pressure potentiometer are linked into the corresponding detection port of generator set controller, controller thinks that genset starts successfully, is operated in running status.After controller sent halt command, scale-of-two output point fuel tap relay disconnected, and often drove auxiliary contact and disconnected, and the detection port of generator set controller can't detect civil power and oil pressure potentiometer, and controller thinks that genset shuts down successfully, is operated in the state of awaiting your instructions.
Press controller and start button, after the startup, the access of the voltage detecting port of generator set controller and rated voltage size, frequency, the civil power that line system is consistent access potentiometer at the analog input port and simulate oil pressure.Specific practice is that the number of teeth of at first revising generator set controller is revised as by frequency meter, a contact of then civil power and oil pressure potentiometer being received respectively the normally opened contact of scale-of-two output point fuel tap relay, voltage detecting port and the analog input port of generator set controller guided to respectively in the another one contact.After controller sends startup command, scale-of-two output point fuel tap relay closes is often opened the auxiliary contact closure, and civil power and oil pressure potentiometer are linked into the corresponding detection port of generator set controller, controller thinks that genset starts successfully, is operated in running status.After controller sent halt command, scale-of-two output point fuel tap relay disconnected, and often drove auxiliary contact and disconnected, and the detection port of generator set controller can't detect civil power and oil pressure potentiometer, and controller thinks that genset shuts down successfully, is operated in the state of awaiting your instructions.
If the unit operation pattern is directly received scale-of-two input point GCB combined floodgate feedback with the output of scale-of-two output point GCB on/off switch, can simulate the on/off switch process of unit.
For the control system that the parallel operation requirement is arranged, on the basis of above-mentioned circuit, need to increase air switch.At first scale-of-two output point GCB closing relay is often opened the closing coil that auxiliary contact are received air switch, scale-of-two output point GCB separating brake relay normally open auxiliary contact are received the switching winding of air switch, air switch is often left auxiliary contact receive scale-of-two input point GCB combined floodgate feedback.Secondly, access homology voltage in operation circuit.After starting a generator set controller and closing a floodgate, start next generator set controller, press the combined floodgate button after starting successfully, two controllers have same voltage, same frequency, same-phase and reach the parallel operation requirement, can realize parallel function.
The utility model has the advantages that: do not need to access unit, just can simulate unit running process by gen-set control system, for checking whether the line design principle is correct, time-delay is controlled, whether the wiring circuit is normal, whether expectation function is realized, especially significant in the debugging of host computer and the communication of generator set control circuit.Circuit is simple and reliable, implements easily, and is with low cost.
Description of drawings
Fig. 1 is the utility model separate unit connection circuit schematic diagram.
In the drawings, 1, oil pressure potentiometer 2, generator set controller 3, fuel tap relay 4, voltage detecting port 5, analog input port.
Embodiment
As shown in Figure 1, the utility model is to realize like this, it comprises oil pressure potentiometer 1, generator set controller 2, fuel tap relay 3, voltage detecting port 4, analog input port 5, civil power and oil pressure potentiometer 1 are received respectively the contact of normally opened contact of the scale-of-two output point fuel tap relay 3 of generator set controller 2, voltage detecting port 4 and the analog input port 5 of generator set controller 2 guided to respectively in the another one contact.
After generator set controller sends startup command, startup, fuel tap output, fuel tap relay 3 closures, the oil pressure potentiometer 1 access oil pressure detection port of simulation fuel injection pressure signal, (the fuel tap relay coil is connected with fuel tap relay normally open auxiliary contact fuel tap relay 3 closures simultaneously, fuel tap relay 3 electric after, the fuel tap relay closes), the three-phase and four-line line voltage adds the generating voltage detection port.Gen-set control system has detected generating voltage and oil pressure, thinks the unit starting success to be operated in state in the unit operation.
Gen-set control system sends when closing a floodgate order, and gen-set control system has received the combined floodgate feedback signal, thinks that air switch closes a floodgate successfully, is operated in "on" position of unit.When gen-set control system sent the separating brake order, the combined floodgate feedback signal disappeared, and gen-set control system thinks that the air switch separating brake is successful, is operated in state in the unit operation.
After gen-set control system sent halt command, fuel tap stopped output, and the fuel tap relay disconnects, and the potentiometer of simulation fuel injection pressure signal disconnects from the oil pressure detection port, and the fuel tap relay disconnects simultaneously, and the three-phase and four-line line voltage disconnects from the generating voltage detection port.Gen-set control system can't detect generating voltage and oil pressure, thinks compressor emergency shutdown success, is operated in the unit middle state of awaiting your instructions.

Claims (1)

1. a generator set controller is checked oneself device, it comprises oil pressure potentiometer, generator set controller, fuel tap relay, voltage detecting port, analog input port, it is characterized in that civil power and oil pressure potentiometer are received respectively the contact of normally opened contact of the scale-of-two output point fuel tap relay of generator set controller, voltage detecting port and the analog input port of generator set controller guided to respectively in the another one contact.
CN 201220243695 2012-05-29 2012-05-29 Generator set controller self-examination device Expired - Fee Related CN202711056U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220243695 CN202711056U (en) 2012-05-29 2012-05-29 Generator set controller self-examination device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220243695 CN202711056U (en) 2012-05-29 2012-05-29 Generator set controller self-examination device

Publications (1)

Publication Number Publication Date
CN202711056U true CN202711056U (en) 2013-01-30

Family

ID=47591338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220243695 Expired - Fee Related CN202711056U (en) 2012-05-29 2012-05-29 Generator set controller self-examination device

Country Status (1)

Country Link
CN (1) CN202711056U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863808A (en) * 2016-06-16 2016-08-17 哲弗智能***(上海)有限公司 Vehicle power system cooling device with self-inspection function and use method of vehicle power system cooling device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863808A (en) * 2016-06-16 2016-08-17 哲弗智能***(上海)有限公司 Vehicle power system cooling device with self-inspection function and use method of vehicle power system cooling device
CN105863808B (en) * 2016-06-16 2018-06-29 哲弗智能***(上海)有限公司 Automotive power temperature cooling device and its application method with self-checking function

Similar Documents

Publication Publication Date Title
CN203825164U (en) Detection platform for DC circuit breaker
CN104966457B (en) A kind of maintenance electrician's intelligent training checking system based on MCGS interfaces
CN103252053A (en) Singlechip-based small routing inspection controller for fire pump group
CN102826471A (en) Crane as well as operation safety control system and method thereof
CN203054190U (en) Vacuum circuit breaker running-in experiment facility and multi-station experiment platform thereof
CN202196323U (en) Main transformer cooling intelligent control system of hydroelectric station
CN202711056U (en) Generator set controller self-examination device
CN202196301U (en) Seepage draining intelligence control system of water power station
CN203799255U (en) Control circuit of equipment control cabinet
CN109591655A (en) Emergent stopping charging unit, charging pile and working method
CN207731496U (en) A kind of functional simulation control flow applied to diesel-driven generator control system
CN202228325U (en) Medium voltage air compressor intelligent control system of hydropower station
CN203310938U (en) Startup/shutdown test system of electronic device
CN206117293U (en) Each other is equipped with control circuit industrial furnace fan dual supply converter
CN204575812U (en) Portable beaker analogue means
CN103077644A (en) Split-phase breaker hydraulic operation mechanism training device
CN211319056U (en) Frequency converter debugging device
CN204925351U (en) Permanent magnetism switch function testing arrangement
CN204331319U (en) A kind of diesel emergency generating set redundant manipulator switching device shifter of configuration arranged side by side
CN203338059U (en) Intelligent motor protection control device
CN203907236U (en) Control system with high reliability for oil source
CN202839480U (en) Safe intelligent plastic casing breaker
CN103389664B (en) Intelligent electric motor protection and control device
CN202872335U (en) Circuit protection device for self-coupling voltage reduction starting box
CN202939429U (en) Arc extinguishing cabinet controller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130130

Termination date: 20200529