Background technology
Along with the increase of power plant expansion project and the continuous compression of power plant's floor space, power plant's inner high voltage overhead outlet is arranged and is become increasingly complex, difficulty, even the engineering that the overhead wire outlet can't realize has appearred, only take other forms of outlet--high-tension cable or the outlet of SF6 gas-insulated pipeline bus.Because general outlet distance is all long, at least one span, adopt SF6 gas-insulated pipeline bus cost too high, thereby the engineering that a plurality of high-tension cable outlets occurred, I all adopt the high-tension cable outlet at Dongying strand engineering, Malaysian wood glue engineering and Vietnam Yongxin the second stage of the project of institute's design.Because there is certain failure rate in high-tension cable, and the high-tension cable Maintenance and Repair cycle is longer, therefore in order to shorten the time of causing the power plant to send owing to outlet cable fault, employing is implemented with the design of spare phase for the high-voltage terminal cable.And a simple high-tension cable for subsequent use is as spare phase; can not fully play the effect of Reduction of failure time, adopt cable termination, overvoltage protection measure, connection gold utensil etc. to arrange that fully the alternative scheme of installing can shorten the time that the power plant (electric substation) that is caused by the high-tension cable fault can't send electricity greatly.
The utility model content
The purpose of this utility model provides the arrangement that spare phase in a kind of high-tension cable outlet design substitutes fault phase fast, this arrangement is simple in structure, spare phase replaces the processing time of fault phase short, can at spare phase run duration trouble shooting phase cable, overhaul very convenient.
[0004]For achieving the above object, the utility model provides the high-tension cable outlet of a kind of power plant that quick spare phase arrangement is set, high-tension cable adopts tunnel or raceway groove to lay, whenever return back out line A is set, B, C three addition spare phase cables, cable adopts and is arranged in juxtaposition, it is characterized in that: the spare phase cable leaves binding post, the spare phase cable termination is installed at the two ends of spare phase cable, spare phase cable termination and working cable terminal level and vertical direction distance all are not less than intersects not the nothing of interruption maintenance simultaneously and blocks distance between the live part, adopt post insulator to be built with a pipe bus at the cable outlet two ends, this pipe bus and spare phase cable termination are arranged in juxtaposition, connect by flexible conductor, this pipe bus and working cable terminal are arranged in parallel, and the outlet of main transformer high-pressure side adopts overhead wire to be connected with the working cable terminal.
[0005]By taking the high-tension cable arrangement with quick spare phase, can greatly shorten the nonscheduled down time that causes because of outlet cable fault.Simultaneously, this arrangement has been considered the band electrical distance, can overhaul failure cable during unit operation.To a high voltage fault cable check fully, the projects such as reparation, withstand voltage test may need a week even longer time, and adopt quick spare phase arrangement, just can finish the work of spare phase cable replacement failure cable in several hours.For 1 600MW unit, take the 0.394 yuan/kWh of stake electrovalence of Liaoning Area as example, 1 hour energy output of every increase can bring 23.64 ten thousand yuan income.Therefore reduce the nonscheduled down time that the high-tension cable fault causes, still all have high economic worth and social value for the electricity consumption client for electricity power enterprise.
Description of drawings
Fig. 1 is the high-tension cable outlet floor plan schematic diagram with quick spare phase;
Fig. 2 is the high-tension cable outlet transformer side sectional schematic diagram with the spare phase cable termination;
Fig. 3 is the high-tension cable outlet power distribution equipment side section schematic diagram with the spare phase cable termination.
Embodiment
With reference to Fig. 1, set up two frameworks 1 in transformer side and cable termination side, transformer 2, lightning arrester 3, working cable terminal 4, spare phase cable termination 5, pipe bus 6 and post insulator 7 become row to arrange successively, and high-tension cable 8 adopts and is arranged in juxtaposition.Spare phase cable termination 5 and working cable terminal 4 levels and vertical direction distance all are not less than intersects not the nothing of interruption maintenance simultaneously and blocks distance between the live part, the distance of spare phase cable termination 5 and pipe bus 6 and working cable terminal 4 by not simultaneously interruption maintenance consider.For making things convenient for each phase outlet to be connected with electric phase cable terminal 5 for subsequent use, set up pipe bus 6 with post insulator 7, pipe bus 6 adopts flexible conductor to be connected with spare phase cable termination 5.Each opposite position installs the connection gold utensil in advance on the pipe bus.
[0008]With reference to Fig. 2, the HV Terminal of transformer 2, lightning arrester 3, working cable terminal 4 adopt aerial condutor to connect.In the time of any phase cable fault, after the shutdown, the flexible conductor of fault phase taken apart at working cable terminal 4 places be transferred on the pipe bus 6, realize the replacement of this side high-tension cable.
[0009]With reference to Fig. 3, the other end of high-tension cable adopts the design same with transformer side, be provided with equally spare phase cable termination 5, the facilities such as pipe bus 6, working cable terminal 4 and lightning arrester 3, when any phase cable fault, the flexible conductor of fault phase taken apart at working cable terminal 4 places be transferred on the pipe bus 6, realize the replacement of this side high-tension cable, thereby realize the replacement of whole failure cable.Because cable termination has been considered not simultaneously interruption maintenance in distance, and the high-tension cable metal sheath takes to prevent the overvoltage measure, be not more than 50V at normal operation period metal outer jacket induced voltage peak, so failure cable can overhaul during unit operation, overhauling can become the work phase after complete again during unit maintenance.