CN202674817U CN 201220342522 CN201220342522U CN202674817U CN 202674817 U CN202674817 U CN 202674817U CN 201220342522 CN201220342522 CN 201220342522 CN 201220342522 U CN201220342522 U CN 201220342522U CN 202674817 U CN202674817 U CN 202674817U
Authority
CN
China
Prior art keywords
cng
skid body
control cabinet
cylinder group
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220342522
Other languages
Chinese (zh)
Inventor
许世民
万磊
江帆
李泽
陶小秀
许安东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jinke Environmental Protection Technology Co Ltd
Original Assignee
Sichuan Jinke Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jinke Environmental Protection Technology Co Ltd filed Critical Sichuan Jinke Environmental Protection Technology Co Ltd
Priority to CN 201220342522 priority Critical patent/CN202674817U/en
Application granted granted Critical
Publication of CN202674817U publication Critical patent/CN202674817U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a hydraulic compressed natural gas (CNG) filling substation, in particular an integrated hydraulic CNG filling substation, belongs to the technical field of CNG filling equipment and provides an integrated hydraulic CNG filling substation which is low in investment cost in the process of building a filling station. The integrated hydraulic CNG filling substation comprises a control cabinet, a hydraulic compressor comprising a gas discharge column, a gas storage cylinder group comprising a mechanical sequential control disc, and a mounting skid body, wherein the hydraulic compressor, the gas storage cylinder group and the control cabinet are connected with one another; the hydraulic compressor, the gas storage cylinder group and the control cabinet which are connected with one another are integrated into a whole pressurizing gas storage system through the mounting skid body; and the pressurizing gas storage system inputs CNG through the gas discharge column and outputs CNG through the mechanical sequential control disc.

Description

A kind of integrated form CNG hydraulic pressure air entraining substation
Technical field
The utility model relates to a kind of CNG hydraulic pressure air entraining substation, especially relates to a kind of integrated form CNG hydraulic pressure air entraining substation, belongs to CNG aerating equipment manufacturing technology field.
Background technique
Present CNG gas station all is stationary structure usually.Namely when we need to be when setting up somewhere an air entraining substation, usually all be to consist of discharge column, hydraulic compressor, mechanical sequence control dish, air cylinder group and the control cabinet etc. of air entraining substation, then the fixing place that need to set up air entraining substation that is installed in reconnects filling machine respectively.Before the aerating, input CNG gas by discharge column, hydraulic compressor and control cabinet to the air cylinder group with the tube bank trailer first, and store.Then, when having automobile to need aerating, can directly get CNG gas in the air cylinder group by filling machine to refueling.The air entraining substation of this structure, not only cost of investment is high, and irremovable, and aerating is very inconvenient.
The model utility content
Technical problem to be solved in the utility model is: provide a kind of when setting up gas station, the integrated form CNG hydraulic pressure air entraining substation that cost of investment is little.
For solving the problems of the technologies described above the technological scheme that adopts be: a kind of integrated form CNG hydraulic pressure air entraining substation, comprise control cabinet, contain the hydraulic compressor of discharge column and contain the air cylinder group of mechanical sequence control dish, hydraulic compressor, air cylinder group and control cabinet interconnect, also comprise the installation skid body, interconnective hydraulic compressor, air cylinder group and control cabinet are by installing the integrated as a whole supercharging gas storage system of skid body, described supercharging gas storage system is by discharge column input CNG gas, by mechanical sequence control dish output CNG gas.
Further be, also comprise being integrated in the filling machine of installing on the skid body that the input end of filling machine is connected with the output terminal of mechanical sequence control dish.
Further be, skid body be installed in horizontal plane, be projected as rectangular that filling machine is arranged in right-hand member, air cylinder group and hydraulic compressor broad ways side by side be arranged in left end, control cabinet is positioned at the left side of filling machine.
Further be, also comprise the skid body shell, hydraulic compressor, air cylinder group and control cabinet are installed on the interior installation skid body of skid body shell.
Further be to be provided with the skid body door on the skid body shell of installation hydraulic compressor and control cabinet position.
The beneficial effects of the utility model are: adopt described with interconnective hydraulic compressor, air cylinder group and control cabinet by the structure of the integrated as a whole supercharging gas storage system of skid body is installed, like this when building a station, only need to set up at needs the place of air entraining substation, arrange for the basis that installs and fixes described installation skid body to get final product.After layout is finished, directly described supercharging gas storage system is fixed on the basis by described installation skid body, has just finished the process of building a station.Saved and set up respectively a large amount of work and investments that the basis is installed, thereby saving greatly cost of investment, simultaneously, the installation basis amount that need to set up of building a station is few, no matter be in advance installation, or the described supercharging gas storage system of the integrated moving in later stage very convenience all.In addition, it is little that described supercharging gas storage system also has floor space, the fireballing advantage of building a station.
Description of drawings
Fig. 1 is the plan view of a kind of integrated form CNG of the utility model hydraulic pressure air entraining substation;
Fig. 2 is the plan view of Fig. 1;
Fig. 3 is the side view of Fig. 1.
Be labeled as among the figure: control cabinet 1, discharge column 2, hydraulic compressor 3, mechanical sequence control dish 4, air cylinder group 5, installation skid body 6, supercharging gas storage system 7, skid body shell 8, skid body door 9, filling machine 10.
Embodiment
As Fig. 1, Fig. 2 and shown in Figure 3 be the utility model provide a kind of when setting up gas station, the integrated form CNG hydraulic pressure air entraining substation that cost of investment is little.Described integrated form CNG hydraulic pressure air entraining substation comprises control cabinet 1, contain the hydraulic compressor 3 of discharge column 2 and contain the air cylinder group 5 of mechanical sequence control dish 4, hydraulic compressor 3, air cylinder group 5 and control cabinet 1 interconnect, also comprise skid body 6 is installed, interconnective hydraulic compressor 3, air cylinder group 5 and control cabinet 1 are by installing skid body 6 integrated as a whole supercharging gas storage systems 7, described supercharging gas storage system 7 makes up filling machine by mechanical sequence control dish 4 output CNG gases to air cylinder by discharge column 2 input CNG gases.Adopt above-mentioned interconnective hydraulic compressor 2, air cylinder group 5 and control cabinet 1 by the structure of the integrated as a whole supercharging gas storage system of skid body is installed, like this when building a station, only need to set up at needs the place of air entraining substation, arrange for the basis that installs and fixes described installation skid body 6 to get final product.After layout is finished, directly described pressurization system 7 is fixed on the basis by described installation skid body 6, has just finished the process of building a station.Saved and set up respectively a large amount of work and investments that the basis is installed, thereby saving greatly cost of investment, simultaneously, the installation basis amount that need to set up of building a station is few, no matter be in advance installation, or the described supercharging gas storage system of the integrated moving in later stage very convenience all.
In the above-mentioned mode of execution, install and mobile described integrated form CNG hydraulic pressure air entraining substation for convenient, particularly in order conveniently to install and move the filling machine 10 that consists of air entraining substation, when fabrication and installation skid body 6, reserve the mounting point that adds gas 10, and filling machine 10 is integrated into installs on the skid body 6, simultaneously, the input end of filling machine 10 is connected with the output terminal of mechanical sequence control dish 4.Like this, in the time will setting up air entraining substation, and during mobile described air entraining substation, more convenient.
In the above-mentioned mode of execution, in order to make the more compact structure of whole integrated form CNG hydraulic pressure air entraining substation, floor space is less, when fabrication and installation skid body 6, with being installed, skid body 6 is formed in the rectangular that is projected as in the horizontal plane, then filling machine 10 is arranged in right-hand member, air cylinder group 5 and hydraulic compressor 3 broad wayss side by side be arranged in left end, control cabinet 1 is positioned at the left side of filling machine 10.For when building a station; reduce the investment of Infrastructure; simultaneously can well protect the assemblies such as hydraulic compressor 3, air cylinder group 5 and control cabinet 1 again; air entraining substation of the present utility model also comprises skid body shell 8, and hydraulic compressor 3, air cylinder group 5 and control cabinet 1 are installed on the installation skid body 6 in the skid body shell 8.Be installed in each assembly in the skid body shell 8 for the ease of maintenance, be provided with skid body door 9 at the skid body shell 8 that hydraulic compressor 3 and control cabinet 1 position are installed.

Claims (5)

1. integrated form CNG hydraulic pressure air entraining substation, comprise control cabinet (1), contain the hydraulic compressor (3) of discharge column (2) and contain the air cylinder group (5) of mechanical sequence control dish (4), hydraulic compressor (3), air cylinder group (5) and control cabinet (1) interconnect, it is characterized in that: also comprise skid body (6) is installed, interconnective hydraulic compressor (3), air cylinder group (5) and control cabinet (1) are by installing the integrated as a whole supercharging gas storage system (7) of skid body (6), described supercharging gas storage system (7) is by discharge column (2) input CNG gas, by mechanical sequence control dish (4) output CNG gas.
2. a kind of integrated form CNG hydraulic pressure air entraining substation according to claim 1 is characterized in that: also comprise being integrated in the filling machine (10) of installing on the skid body (6), the input end of filling machine (10) is connected with the output terminal of mechanical sequence control dish (4).
3. a kind of integrated form CNG hydraulic pressure air entraining substation according to claim 2, it is characterized in that: skid body (6) is installed in horizontal plane, is projected as rectangular, filling machine (10) is arranged in right-hand member, air cylinder group (5) and hydraulic compressor (3) broad ways side by side be arranged in left end, control cabinet (1) is positioned at the left side of filling machine (10).
4. according to claim 1,2 or 3 described a kind of integrated form CNG hydraulic pressure air entraining substations, it is characterized in that: also comprise skid body shell (8), hydraulic compressor (3), air cylinder group (5) and control cabinet (1) are installed on the interior installation skid body (6) of skid body shell (8).
5. a kind of integrated form CNG hydraulic pressure air entraining substation according to claim 4 is characterized in that: be provided with skid body door (9) on the skid body shell (8) of installation hydraulic compressor (3) and control cabinet (1) position.
CN 201220342522 2012-07-16 2012-07-16 Integrated hydraulic compressed natural gas (CNG) filling substation Expired - Fee Related CN202674817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220342522 CN202674817U (en) 2012-07-16 2012-07-16 Integrated hydraulic compressed natural gas (CNG) filling substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220342522 CN202674817U (en) 2012-07-16 2012-07-16 Integrated hydraulic compressed natural gas (CNG) filling substation

Publications (1)

Publication Number Publication Date
CN202674817U true CN202674817U (en) 2013-01-16

Family

ID=47495723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220342522 Expired - Fee Related CN202674817U (en) 2012-07-16 2012-07-16 Integrated hydraulic compressed natural gas (CNG) filling substation

Country Status (1)

Country Link
CN (1) CN202674817U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883873A (en) * 2014-04-10 2014-06-25 安徽省鸿申压缩机有限公司 Skid-mounted compressed natural gas automobile air-entrapping device
US10072487B2 (en) 2016-09-22 2018-09-11 I-Jack Technologies Incorporated Lift apparatus for driving a downhole reciprocating pump
US10087924B2 (en) 2016-11-14 2018-10-02 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
US10544783B2 (en) 2016-11-14 2020-01-28 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
US11519403B1 (en) 2021-09-23 2022-12-06 I-Jack Technologies Incorporated Compressor for pumping fluid having check valves aligned with fluid ports
US11952995B2 (en) 2020-02-28 2024-04-09 I-Jack Technologies Incorporated Multi-phase fluid pump system
US11982269B2 (en) 2022-05-05 2024-05-14 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883873B (en) * 2014-04-10 2015-12-09 安徽省鸿申压缩机有限公司 Skid-mounted compressed natural gas filling device for automobile
CN103883873A (en) * 2014-04-10 2014-06-25 安徽省鸿申压缩机有限公司 Skid-mounted compressed natural gas automobile air-entrapping device
US10352138B2 (en) 2016-09-22 2019-07-16 I-Jack Technologies Incorporated Lift apparatus for driving a downhole reciprocating pump
US10072487B2 (en) 2016-09-22 2018-09-11 I-Jack Technologies Incorporated Lift apparatus for driving a downhole reciprocating pump
US10544783B2 (en) 2016-11-14 2020-01-28 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
US10167857B2 (en) 2016-11-14 2019-01-01 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
US10087924B2 (en) 2016-11-14 2018-10-02 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
US11162491B2 (en) 2016-11-14 2021-11-02 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
US11242847B2 (en) 2016-11-14 2022-02-08 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
US11339778B2 (en) 2016-11-14 2022-05-24 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing
US11952995B2 (en) 2020-02-28 2024-04-09 I-Jack Technologies Incorporated Multi-phase fluid pump system
US11519403B1 (en) 2021-09-23 2022-12-06 I-Jack Technologies Incorporated Compressor for pumping fluid having check valves aligned with fluid ports
US11982269B2 (en) 2022-05-05 2024-05-14 I-Jack Technologies Incorporated Gas compressor and system and method for gas compressing

Similar Documents

Publication Publication Date Title
CN202674817U (en) Integrated hydraulic compressed natural gas (CNG) filling substation
CN201528142U (en) Combined box substation provided with transformer chassis truck
CN202927471U (en) Automobile gas filling sub-station system
CN205226235U (en) Four sections flexible arms to high altitude construction carry out side tow chain device that pipeline was carried
CN201875428U (en) Rapid gas-filling device of CNG (compressed natural gas) station with double gas sources for gas filling
CN203727883U (en) Vehicular CNG cylinder unit quick-inflation tool
CN103208753A (en) Vehicle-mounted mobile substation
CN203375169U (en) Pump valve pry for LNG (liquefied natural gas) refueling station
CN201895571U (en) Rack for liquefied natural gas cylinder
CN201699020U (en) Photovoltaic module combination frame
CN202302707U (en) Compressed natural gas (CNG) storage and transportation gas filling trailer
CN202320533U (en) Rear floor structure for arranging spare tire
CN205640221U (en) Mothers and sons dual -purpose pneumatic quick -operation joint that stands
CN204674438U (en) Tire Information Mobile Service car
CN102410442A (en) CNG (Compressed Natural Gas) storage and transportation gas filling trailer
CN201605858U (en) Easy assembly and disassembly road construction fence
CN202245133U (en) Baking and material loading pneumatic workbench for automotive carpet
CN201260043Y (en) Split movable transforming plant
CN205168481U (en) Gas cylinder composite set and highway rail hydraulic haulage car
CN204845678U (en) Miniature tire removes service cart
CN203871674U (en) 220kV power distribution unit outgoing line structure
CN202877434U (en) Novel hydraulic device
CN203312635U (en) Secondary connection modularizing structure for load switch cabinet
CN203312670U (en) Vacuum circuit breaker maintenance bracket
CN102832827B (en) A kind of high-power three-level explosion-proof frequency converter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130116

Termination date: 20180716