CN202671018U - Welding waste material transportation cableway bucket - Google Patents

Welding waste material transportation cableway bucket Download PDF

Info

Publication number
CN202671018U
CN202671018U CN 201220223264 CN201220223264U CN202671018U CN 202671018 U CN202671018 U CN 202671018U CN 201220223264 CN201220223264 CN 201220223264 CN 201220223264 U CN201220223264 U CN 201220223264U CN 202671018 U CN202671018 U CN 202671018U
Authority
CN
China
Prior art keywords
bucket
bucket body
waste material
material transportation
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220223264
Other languages
Chinese (zh)
Inventor
王昌明
王彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI ZHONGJI CHENGJIAN CONSTRUCTION CO.,LTD.
Original Assignee
MAANSHAN JIANCHENG METAL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAANSHAN JIANCHENG METAL STRUCTURE CO Ltd filed Critical MAANSHAN JIANCHENG METAL STRUCTURE CO Ltd
Priority to CN 201220223264 priority Critical patent/CN202671018U/en
Application granted granted Critical
Publication of CN202671018U publication Critical patent/CN202671018U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pallets (AREA)

Abstract

The utility model discloses a welding waste material transportation cableway bucket which comprises a bucket body, wherein the upper ends of four side walls of the bucket body are respectively provided with a lifting lug, a plurality of sloping baffles are arranged on an inner wall of the bucket body, a fixing plate is arranged on an outer wall of the bucket body, and the fixing plate is provided with a locating hole. The bucket body is a bucket with a bottom and is formed by welding steel plates, and cross section of the bucket body is in ladder shape. The fixing plate is a rectangular steel plate, and is provided with a locating hole for a steel wire rope to penetrate through. According to the welding waste material transportation cableway bucket, the ladder-shaped bucket body is designed so that bottom stress is reduced. The four sides of the bucket are all provided with a lifting lug, so that the bucket can be stable when the bucket is lifted, and damage to the bottom of the bucket can be effectively prevented. The fixing plate is installed on the side of the bucket and the steel wire rope is penetrated through the fixing board so that the functions of protection and shaking prevention are achieved.

Description

A kind of welding waste material transportation suspension bucket
Technical field:
The utility model relates to steel structure production facilities field, relates in particular to a kind of welding waste material transportation suspension bucket.
Background technology:
In the steel structure production process, have a large amount of welding and the generation of cutting waste material, because the steel waste material is quite heavy, therefore need to use suspension bucket to cooperate elevator machinery that waste material is transported, and the suspension bucket that in the past used is rectangle, both sides are provided with hanger, are not easy to keep balance during its lifting, and the bottom is owing to stressed being easy to greatly damaged.Therefore imagination provides a kind of equipment to solve this problem.
The utility model content:
The purpose of this utility model just provides a kind of welding waste material transportation suspension bucket, solve in the steel structure production process, have a large amount of welding and the generation of cutting waste material, because the steel waste material is quite heavy, therefore need to use suspension bucket to cooperate elevator machinery that waste material is transported, and the suspension bucket that in the past used is rectangle, both sides are provided with hanger, its lifting the time is not easy to keep balance, and the bottom is because the stressed problem damaged of being easy to greatly.
The technical solution adopted in the utility model is:
A kind of welding waste material transportation suspension bucket comprises bucket body: bucket body four sidewall upper all are equipped with hanger, are provided with some sloping baffles on the bucket body inwall, are provided with adapter plate on the bucket body outer wall, have knock hole on the adapter plate.
Described bucket body is the bottom bucket that has of Plate Welding one-tenth, and its cross-sectional plane is trapezoidal.
Described adapter plate is rectangular steel plates, has knock hole on it for steel wire penetrating.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is by the trapezoidal bucket body of design, and is stressed bottom reducing, and in the structure that four side is all installed hanger, can guarantee steadily when lifting, and effectively prevents the bottom damage; At the side mounting plate, can pass steel rope and play protection and prevent the effect that bucket body rocks simultaneously.
Description of drawings:
Accompanying drawing 1 is the utility model structural representation.
The specific embodiment:
Below in conjunction with accompanying drawing, by embodiment the utility model is described in further detail:
A kind of welding waste material transportation suspension bucket, comprise bucket body 1: bucket body 1 four sidewall upper all are equipped with hanger 2, be provided with some sloping baffles 3 on bucket body 1 inwall, be provided with adapter plate 4 on bucket body 1 outer wall, have knock hole 5 on the adapter plate 4, bucket body 1 is the bottom bucket that has of Plate Welding one-tenth, and its cross-sectional plane is trapezoidal, adapter plate 4 is rectangular steel plates, has knock hole 5 on it for steel wire penetrating.
Above-described embodiment only is better embodiment of the present utility model, and in addition, the utility model can also have other implementations.Need to prove that under the prerequisite that does not break away from the utility model design, any apparent improvement and modification all should fall within the protection domain of the present utility model.

Claims (3)

1. a welding waste material transportation suspension bucket comprises bucket body, and it is characterized in that: bucket body four sidewall upper all are equipped with hanger, are provided with some sloping baffles on the bucket body inwall, are provided with adapter plate on the bucket body outer wall, have knock hole on the adapter plate.
2. welding waste material transportation suspension bucket according to claim 1 is characterized in that: described bucket body be Plate Welding become bottom bucket arranged, its cross-sectional plane is trapezoidal.
3. welding waste material transportation suspension bucket according to claim 1, it is characterized in that: described adapter plate is rectangular steel plates, has knock hole on it for steel wire penetrating.
CN 201220223264 2012-05-17 2012-05-17 Welding waste material transportation cableway bucket Expired - Fee Related CN202671018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220223264 CN202671018U (en) 2012-05-17 2012-05-17 Welding waste material transportation cableway bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220223264 CN202671018U (en) 2012-05-17 2012-05-17 Welding waste material transportation cableway bucket

Publications (1)

Publication Number Publication Date
CN202671018U true CN202671018U (en) 2013-01-16

Family

ID=47491936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220223264 Expired - Fee Related CN202671018U (en) 2012-05-17 2012-05-17 Welding waste material transportation cableway bucket

Country Status (1)

Country Link
CN (1) CN202671018U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106542940A (en) * 2016-08-26 2017-03-29 湖北凯龙化工集团股份有限公司 A kind of cooling hanging column mechanism for thermoplastics type's explosive-source explosive post

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106542940A (en) * 2016-08-26 2017-03-29 湖北凯龙化工集团股份有限公司 A kind of cooling hanging column mechanism for thermoplastics type's explosive-source explosive post

Similar Documents

Publication Publication Date Title
CN103991787A (en) Electric precipitation anode plate installing and lifting device for power plants
CN202671018U (en) Welding waste material transportation cableway bucket
CN204368690U (en) A kind of locomotive wheel storage rack
CN201324915Y (en) Adjustable box-beam overturn device
CN203008391U (en) Reversed T-shaped hoisting connecting piece for prefabricated part hoisting
CN203391981U (en) Pile shoe supporting device
CN202848841U (en) Steel structure transporting hanger
CN203033610U (en) Car bottom plate for elevator
CN203715156U (en) Convenient crane
CN202263718U (en) Vibration screen lower cross beam flange
CN201914830U (en) Rope separator of tower hoist
CN202139573U (en) Wave elimination slope protection block
CN202245671U (en) Lifting cross beam of evaporator component
CN104401872A (en) Steel structure used for box girder of crane hoisting equipment
CN205990123U (en) A kind of convenient packing to pouring weight
CN203023654U (en) Horizontal four-way of cable bridge
CN204038810U (en) A kind of reinforcing vertical beam
CN204434114U (en) The hanging beam of crane in bridge type
CN204148462U (en) Sandbox
CN203997411U (en) The marine double-layered transporting bracket of heavy wind tower
CN203967271U (en) A kind of large moment of flexure concurrent earth wire support device
CN203345183U (en) Reusable boundary guardrail for container ship
CN203359337U (en) Storage frame bent of prefabricated concrete wall
CN202674750U (en) Steel structure platform with bolts on upper surface
CN203097404U (en) Anti-skidding triangular poling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 243100 Anhui city of Ma'anshan province Dangtu County Gu Shu Industrial Park

Patentee after: Anhui Cheng Cheng environmental protection equipment Technology Co.,Ltd.

Address before: 243100 Anhui city of Ma'anshan province Dangtu County Gu Shu Industrial Park

Patentee before: Ma'anshan Cheng Cheng metal structure Co.,Ltd.

Address after: 243100 Anhui city of Ma'anshan province Dangtu County Gu Shu Industrial Park

Patentee after: Ma'anshan Cheng Cheng metal structure Co.,Ltd.

Address before: 243100 Anhui city of Ma'anshan province Dangtu County Gu Shu Industrial Park

Patentee before: MAANSHAN JIANCHENG METAL STRUCTURE Co.,Ltd.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170123

Address after: 243100 Anhui city of Ma'anshan province Dangtu County Gu Shu Industrial Park

Patentee after: ANHUI ZHONGJI CHENGJIAN CONSTRUCTION CO.,LTD.

Address before: 243100 Anhui city of Ma'anshan province Dangtu County Gu Shu Industrial Park

Patentee before: Anhui Cheng Cheng environmental protection equipment Technology Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130116

Termination date: 20180517