CN202644799U - Prestressed concrete hollow floor structure based on plastic balls - Google Patents

Prestressed concrete hollow floor structure based on plastic balls Download PDF

Info

Publication number
CN202644799U
CN202644799U CN 201220098260 CN201220098260U CN202644799U CN 202644799 U CN202644799 U CN 202644799U CN 201220098260 CN201220098260 CN 201220098260 CN 201220098260 U CN201220098260 U CN 201220098260U CN 202644799 U CN202644799 U CN 202644799U
Authority
CN
China
Prior art keywords
hollow
plastic
hollow ball
balls
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220098260
Other languages
Chinese (zh)
Inventor
刘明保
范波
郭文彤
张如杭
胡程鹤
张红和
齐虎
顾万黎
于滨
潘立
聂永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CABR Technology Co Ltd
Original Assignee
CABR Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CABR Technology Co Ltd filed Critical CABR Technology Co Ltd
Priority to CN 201220098260 priority Critical patent/CN202644799U/en
Application granted granted Critical
Publication of CN202644799U publication Critical patent/CN202644799U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model relates to a prestressed concrete hollow floor structure based on plastic balls. The hollow floor structure is composed of a prestressed concrete beam and a hollow panel, wherein the plastic balls which are hollow are adopted for the inner film of the hollow panel; the span (L) of the prestressed concrete beam is about 7-13.5 m; the prestressed concrete beam is provided with ordinary reinforcements and positive and negative parabolic prestressed reinforcements; the span-thickness ratio (L/H) of the hollow panel is about 24-32; the plastic hollow balls are arranged in the middle of the hollow panel; the clear distance of the plastic hollow balls is not lower than the width of a fixed mount; and a hidden beam can be arranged between adjacent plastic hollow balls. The hollow floor structure is characterized in that the plastic hollow balls are arranged in the middle of the hollow panel; and the positive and negative parabolic prestressed reinforcements are arranged between the plastic hollow balls. The prestressed concrete hollow floor structure based on the plastic balls disclosed by the utility model has the beneficial effects that a visual effect can be improved, the building clearance can be improved, materials can be saved, the dead load can be reduced, the construction period can be reduced, structural members generally cannot crack, and good thermal insulation, sound insulation and fire resistance performances are achieved.

Description

A kind of pre-stressed concrete hollow building cover structure based on baton round
Affiliated technical field
The utility model relates to a kind of pre-stressed concrete hollow building cover structure of building, especially to energy-conservation, save land, pre-stressed concrete hollow building cover structure that water saving, material-saving and protection of the environment etc. reach the green building requirement.
Background technology
At present, known pre-stressed concrete hollow building cover structure is after placing embedded inner mold by certain rule, forms the prestressed concrete floors of cavity in floor through poured in place concrete.Embedded inner mold is the general name that is embedded in the cast-in-place concrete hollow building roof in order to cylinder core, casing and the cylindrical shell block that forms cavity and do not take out, and is called for short internal mold.The requirement that existing inner membrance has " two-step pouring, one-shot forming " usually occurs because of first pouring concrete initial set, elder generation, the bad consequence of after-pouring concrete bonding occur; Some requirements is adopted polyphenyl plate or is fire-retardantly adopted the former fireproof performance bad from ceasing polyphenyl plate, adopts latter's cost too high.
Summary of the invention
In order to overcome the deficiency of pre existing prestressed concrete hollow floor structure globality, fire line and economy, the utility model provides a kind of pre-stressed concrete hollow building cover structure based on baton round, this structure adopts " one-time-concreting, one-shot forming ", avoided connecing batch consequence of face poor attachment because of designing requirement elder generation, rear two-step pouring concrete and appear at; The fire line of this structure employing plastic hollow ball and common plastics tube for building are basic identical, and be better than polyphenyl plate fireproof performance; The plastic hollow ball inner membrance that this structure adopts can utilize waste or used plastics to make, than the fire-retardant polyphenyl plate economy that certainly ceases.
The technical solution of the utility model is: the pre-stressed concrete hollow building cover structure of a kind of building based on baton round, formed by prestressed concrete beam and hollow slab, and the hollow slab inner membrance adopts the plastic hollow ball.The span L scope of prestressed concrete beam is about 7~13.5 meters, configures on request plain bars and positive and negative parabola shaped prestressed reinforcement.The thickness rate scope of striding of hollow slab is about L/H=24~32, by spot welding reinforced mesh fixed mount, the plastic hollow ball is arranged in the middle of hollow slab, the plastic hollow ball mainly is subjected to force direction to present " in-line " layout at two, the diameter of hollow ball is that hollow slab thickness deducts on the hollow slab, the minimum thickness of the Sub, the minimum thickness of hollow slab up/down surface layer is not less than 40 millimeters usually, the spacing of hollow ball is not less than the width on hollow ball fixed mount section base, between the plastic hollow ball, arrange positive and negative parabola presstressed reinforcing steel, on hollow slab, the Sub arranges plain bars.It is characterized in that: the plastic hollow ball is arranged in the hollow slab middle, between the plastic hollow ball, arranges at the upper and lower surface layer of hollow slab plain bars to be set by positive and negative parabola presstressed reinforcing steel.
Feature of the present utility model also is: by spot welding reinforced mesh fixed mount the plastic hollow ball is fixed, presented " in-line " at two main stress direction plastic hollow balls and arrange.
Feature of the present utility model also is: the plastic hollow ball can utilize waste or used plastics to make.
Feature of the present utility model also is: desirable 100,120,150,180,200,220,250,280,300,350,400,450,500 millimeters of the diameter D of plastic hollow ball, its physical and mechanical property meets the regulation of existing related standards.
Feature of the present utility model also is: the spacing of plastic hollow ball is not less than the width on hollow ball fixed mount section base usually, also can between adjacent plastic hollow ball dark beam can be set.
Feature of the present utility model also is: the plain bars of the upper and lower surface layer of hollow slab, can on-the-spot colligation, and also can adopt the spot welding reinforced mesh.
The beneficial effects of the utility model are, can realize that the surface is the floor on plane, can reduce height, the increase building of building cover structure and use headroom, integrality performance of the structure is better, be normally not present the crack, have preferably insulation, sound insulation and flameproof effect, can save material, alleviate deadweight, can shorten the construction period, reduce difficulty of construction.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is structural plan figure of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the B-B sectional view of Fig. 1.
1. frame columns among the figure, 2. prestressed concrete beam, 3. presstressed reinforcing steel, 4. stretching end/fixed end, 5. plastic hollow ball, 6. hollow slab, the 7. the Sub of hollow slab, 8. the upper layer of hollow slab, the 9. plain bars of the upper and lower surface layer of hollow slab, 10. hollow ball fixed mount.
The specific embodiment
In Fig. 1,2,3,12 * 12 meters of colum network sizes along the axis arranged prestressed concrete beam (2) of frame column (1), are arranged concrete hollow dull and stereotyped (6) between axis.Behind prestressed concrete beam (2) and hollow slab (6) bed die, the stressed plain bars (9) of colligation prestressed concrete beam (2) and hollow slab the Sub, plastic hollow ball (5) is packed in its fixed mount (10), hollow ball fixed mount (10) is fixed on the hollow slab bed die, baton round fixed mount (10) is in the horizontal and vertical direction " in-line " and arranges, 256.5 millimeters of spacings, be positioned at the hollow slab middle, arrange in the horizontal and vertical direction positive and negative parabola unbonded prestressing tendon (3) between the plastic hollow ball (5), the stressed plain bars (9) of colligation hollow slab upper layer, concreting gets final product.

Claims (7)

1. the building pre-stressed concrete hollow building cover structure based on baton round is comprised of prestressed concrete beam and hollow slab, and the hollow slab inner membrance adopts the plastic hollow ball; The span L of prestressed concrete beam is 7~13.5 meters, configuration plain bars and positive and negative parabola shaped prestressed reinforcement; The thickness rate of striding of hollow slab is L/H=24~32, by spot welding reinforced mesh fixed mount, the plastic hollow ball is arranged in the middle of hollow slab, the plastic hollow ball mainly is subjected to force direction to present " in-line " layout at two, the diameter of hollow ball is that hollow slab thickness deducts on the hollow slab, the minimum thickness of the Sub, the minimum thickness of hollow slab up/down surface layer is not less than 40 millimeters, the spacing of hollow ball is not less than the width on hollow ball fixed mount section base, between the plastic hollow ball, arrange positive and negative parabola presstressed reinforcing steel, on hollow slab, the Sub arranges plain bars, it is characterized in that: the plastic hollow ball is arranged in the hollow slab middle, between the plastic hollow ball, arrange positive and negative parabola presstressed reinforcing steel, on hollow slab, the Sub arranges plain bars.
2. the pre-stressed concrete hollow building cover structure of a kind of building according to claim 1 based on baton round, it is characterized in that: the presstressed reinforcing steel in the above-mentioned prestressed concrete beam replaces with plain bars.
3. the pre-stressed concrete hollow building cover structure of a kind of building according to claim 1 based on baton round, it is characterized in that: by spot welding reinforced mesh fixed mount the plastic hollow ball is fixed, presented " in-line " at two main stress direction plastic hollow balls and arrange.
4. the pre-stressed concrete hollow building cover structure of a kind of building according to claim 1 based on baton round, it is characterized in that: the plastic hollow ball utilizes waste or used plastics to make.
5. the pre-stressed concrete hollow building cover structure of a kind of building according to claim 1 based on baton round, it is characterized in that: the spacing of plastic hollow ball is not less than the width on hollow ball fixed mount section base.
6. the pre-stressed concrete hollow building cover structure of a kind of building according to claim 1 based on baton round is characterized in that: can between adjacent plastic hollow ball dark beam be set.
7. the pre-stressed concrete hollow building cover structure of a kind of building according to claim 1 based on baton round is characterized in that: the plain bars of the upper and lower surface layer of hollow slab, on-the-spot colligation or employing spot welding reinforced mesh.
CN 201220098260 2012-03-15 2012-03-15 Prestressed concrete hollow floor structure based on plastic balls Expired - Fee Related CN202644799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220098260 CN202644799U (en) 2012-03-15 2012-03-15 Prestressed concrete hollow floor structure based on plastic balls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220098260 CN202644799U (en) 2012-03-15 2012-03-15 Prestressed concrete hollow floor structure based on plastic balls

Publications (1)

Publication Number Publication Date
CN202644799U true CN202644799U (en) 2013-01-02

Family

ID=47413923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220098260 Expired - Fee Related CN202644799U (en) 2012-03-15 2012-03-15 Prestressed concrete hollow floor structure based on plastic balls

Country Status (1)

Country Link
CN (1) CN202644799U (en)

Similar Documents

Publication Publication Date Title
CN204252376U (en) Light cement foam side fascia
CN105421652A (en) Composite heat-preserving wallboard
CN108589969B (en) Combined assembly type shear wall with vertical ECC energy consumption belt and manufacturing method thereof
CN211775115U (en) Steel pipe mixed concrete composite structure
CN100564736C (en) A kind of hollow building cover of permanent assemblied mould arranged along beam and job practices thereof
CN100365218C (en) Combined hollow floor slab comprising steel, concrete and hung fireproof ardealite plate and its production process
CN106677362B (en) Opening box type heat-insulation wallboard structure with built-in connecting bolt and construction method thereof
CN108005301A (en) Steel plate fiber composite connecting piece for prefabricated sandwich thermal insulation wall and assembling process thereof
CN205314308U (en) Have composite wall of bearing and heat preservation function concurrently
CN203174881U (en) FRP-RC (fibreglass reinforced polyester-reinforced concrete) composite beam of local constraint fiber sleeve
CN202644799U (en) Prestressed concrete hollow floor structure based on plastic balls
CN204311630U (en) A kind of prefabricated loss of weight concrete dense-rib superimposed sheet and close rib building roof thereof
CN102653963B (en) Plastic-ball-based prestressed concrete hollow floor structure
CN102031839B (en) hollow core slab for combined use of filling rods and filling boxes
CN104818784A (en) Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof
CN211850265U (en) Hollow superstructure structure of assembled
CN203113579U (en) Honeycomb type rib frame prestress reinforced concrete superimposed board
CN203603332U (en) Box type prestressed concrete light laminated slab
CN201050127Y (en) Cast in-situ light aggregate reinforcing steel concrete composite floor slab
CN106193404A (en) A kind of unformed cast-in-situ floor and construction method thereof
CN206769205U (en) A kind of SMC FRP concrete combination columns
CN201047126Y (en) Prefabricated building module component
CN201158880Y (en) Pre-stress hollow slab filled with cast-in-situ light composite unit
CN203654596U (en) Close type embedded light-weight filling block prestressed-concrete light-duty superimposed plate
CN201713983U (en) Precast slab for superimposed sheet

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20150315

EXPY Termination of patent right or utility model