CN202644477U - Monumentation concrete foot mould frame device - Google Patents

Monumentation concrete foot mould frame device Download PDF

Info

Publication number
CN202644477U
CN202644477U CN 201220201077 CN201220201077U CN202644477U CN 202644477 U CN202644477 U CN 202644477U CN 201220201077 CN201220201077 CN 201220201077 CN 201220201077 U CN201220201077 U CN 201220201077U CN 202644477 U CN202644477 U CN 202644477U
Authority
CN
China
Prior art keywords
steel pipe
template
concrete
steel pipes
templates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220201077
Other languages
Chinese (zh)
Inventor
吕敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Original Assignee
SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd filed Critical SHANGHAI HYDRAULIC ENGINEERING GROUP Co Ltd
Priority to CN 201220201077 priority Critical patent/CN202644477U/en
Application granted granted Critical
Publication of CN202644477U publication Critical patent/CN202644477U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a monumentation concrete foot mould frame device, wherein oppositely pulling screw rods (1) used for fixing penetrate through templates (3) on the two opposite sides; brackets for steel pipes (4) are fixed at the outer parts of the templates (3) on the two sides; and in addition, each bracket for each steel pipe (4) is in the shape of a right triangle, that is, the brackets comprise steel pipes (4) vertically fixed at the outer parts of the templates (3), steel pipes (4) horizontally fixed at the outer parts of the templates (3) and steel pipes (4) stayed between the upper ends of the vertical steel pipes (4) and the outer ends of the horizontal steel pipes (4) in an inclined way. Steel pipe fixing devices adopting triangular structures are installed on the two sides of the two groups of opposite templates, so that the template groups can be fixed stably and effectively, and the unity structure can be achieved, as a result, the monumentation concrete foot mould frame device is convenient and simple to install and fasten, the state is stable when the monumentation concrete foot mould frame device operates, and the performance is reliable and durable.

Description

The concrete town pin die set device of layinging of markstone
Technical field
The utility model relates to the template mounting bracket device technique field in the hydraulic engineering, the concrete town pin die set device of especially layinging of markstone.
Background technology
At present, in the hydraulic engineering burrock bank protection bottom is needed to carry out the cast-in-place concrete town pin of layinging of markstone, domatic to reinforce, because its present position is narrow short, template installs and fixes comparatively difficulty, yet, if this die set device can not suitably be installed the follow-up cast-in-place construction of direct obstruction.
Summary of the invention
Goal of the invention of the present utility model is to provide a kind of concrete town pin die set device of layinging of markstone.
Realize that goal of the invention measure of the present utility model is: relatively pass Screw arbor with nut at both-ends between the template of both sides and fix, fixing steel pipe support outside the template of both sides, the steel pipe support triangle that meets at right angles namely is comprised of the steel pipe and the steel pipe of oblique pull between vertical steel tube upper end and horizontal steel tube outer end that vertically are fixed in template outer steel pipe, level and are fixed in the template outside.
The utility model has the advantage of, by the steel tube fixing device of three-legged structure is installed in relative two groups of template both sides, so that template group obtains stable and strong fixing, realize the unity structure, thereby realization is installed, fastening convenience is simple and direct, and in stable condition during work, dependable performance is durable.
Description of drawings
Fig. 1 is cross-section structure of the present utility model and scheme of installation
Reference numeral comprises:
Screw arbor with nut at both-ends 1, bank protection 2, template 3, steel pipe 4, Concrete seat pad 5.
The specific embodiment
It is fixing relatively to pass Screw arbor with nut at both-ends 1 between the template 3 of both sides, template 3 outer fixedly steel pipe 4 supports in both sides, the steel pipe 4 supports triangle that meets at right angles namely is comprised of the steel pipe 4 and the steel pipe 4 of oblique pull between vertical steel tube 4 upper ends and horizontal steel tube 4 outer ends that vertically are fixed in template 3 outer steel pipe 4, levels and are fixed in template 3 outsides.
Be fixed on the middle and lower part in homonymy vertical steel tube 4 outsides by horizontal steel tube 4 the inners of steel pipe 3 supports of bank protection 2 one side, its outer end is bearing on the Concrete seat pad 5 on the bank protection 2.
Steel pipe 4 support bottom two supports outside the concrete town outside of foot template of layinging of markstone 3 are on Concrete seat pad 5.
In the utility model, template 3 adopts combined steel formworks, and the relative template 3 in both sides connects with split bolt 1, and template 3 outsides are supported with steel pipe 4,3 of templates with the sponge bar with the adhesive tape grouting.
In the utility model, template 3 supports and ensures enough Rigidity and strengths, takes triangle steel pipe 4 scaffolds to support, when guaranteeing to build template 3 indeformable, be not shifted, build form removal after appearance and size meet design requirement.
In the utility model, after the concrete concreting of layinging of markstone, suitable curing condition is arranged and prevent abnormal contraction for guaranteeing concrete, should in time carry out maintenance, concrete is kept wet.After entering hot weather construction, the maintenance of sprinkling water adopts straw bag, plastic sheeting to cover, and carries out maintenance.For preventing that stormy waves from washing away the concrete destruction of the concrete of layinging of markstone, carry out blanking in strict accordance with match ratio and stir, and brushing half an hour setting accelerator is protected with the geotechnological woven cloth of covering before tidewater comes.
In the utility model, building the concrete town pin total length of layinging of markstone is 9.916km, and the day of finishing the work is 40 days.
In above embodiment, do not reach the employing prior aries such as other necessary technologies that relate to enforcement of narration, enumerate no longer successively detailed description.

Claims (3)

1. the concrete town pin die set device of layinging of markstone, it is characterized in that: it is fixing relatively to pass Screw arbor with nut at both-ends (1) between the template (3) of both sides, fixing steel pipe (4) support outside the template (3) of both sides, steel pipe (4) the support triangle that meets at right angles, namely by vertically be fixed in template (3) outer steel pipe (4), level be fixed in the steel pipe (4) in template (3) outside and oblique pull on the vertical steel tube (4) and the steel pipe (4) between horizontal steel tube (4) outer end form.
2. the concrete town pin die set device of layinging of markstone as claimed in claim 1, it is characterized in that, be fixed on the middle and lower part in homonymy vertical steel tube (4) outside by horizontal steel tube (4) the inner of steel pipe (4) support of bank protection (2) one side, its outer end is bearing on the Concrete seat pad (5) on the bank protection (2).
3. the concrete town pin die set device of layinging of markstone as claimed in claim 1 is characterized in that, steel pipe (4) the support bottom two supports outside the outboard template (3) is on Concrete seat pad (5).
CN 201220201077 2012-05-08 2012-05-08 Monumentation concrete foot mould frame device Expired - Lifetime CN202644477U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220201077 CN202644477U (en) 2012-05-08 2012-05-08 Monumentation concrete foot mould frame device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220201077 CN202644477U (en) 2012-05-08 2012-05-08 Monumentation concrete foot mould frame device

Publications (1)

Publication Number Publication Date
CN202644477U true CN202644477U (en) 2013-01-02

Family

ID=47413607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220201077 Expired - Lifetime CN202644477U (en) 2012-05-08 2012-05-08 Monumentation concrete foot mould frame device

Country Status (1)

Country Link
CN (1) CN202644477U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442897A (en) * 2015-11-09 2016-03-30 深圳市市政工程总公司 Double-layer secondary sedimentation tank special-shaped wall construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442897A (en) * 2015-11-09 2016-03-30 深圳市市政工程总公司 Double-layer secondary sedimentation tank special-shaped wall construction method
CN105442897B (en) * 2015-11-09 2018-06-26 深圳市市政工程总公司 Double-deck secondary settling tank abnormity wall construction method

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
JP3160565U (en) Installation structure of solar panel mount
JP4928429B2 (en) Tunnel arch concrete reinforcement self-supporting method
CN202644477U (en) Monumentation concrete foot mould frame device
CN106013158A (en) Aluminum alloy formwork one-edge formwork-supporting device
CN202323717U (en) Cantilever type pre-stress hoop and special tensioning device thereof
CN202530816U (en) A hurricane-shielding reinforcing device of a prefabricated house
CN206448549U (en) The beam slab double deck type bracing members frame of encorbelmenting of steadiness can be improved
CN206634889U (en) Elevator hoistways ins and outs
CN211396591U (en) Concrete shear wall root reinforcing apparatus
CN204475145U (en) Self-anchored suspension bridge anchoring is across cast-in-place box beam
JP2011241547A (en) Strut and building provided with the same
CN203223233U (en) Tunnel steel-edged water stopping belt installment device
JP2011241548A (en) Building
CN206158192U (en) Concrete pump pipe's simple easily fixable device on concrete face
CN104563515A (en) Template bracing structure for ultrahigh shear wall and construction method thereof
CN205557292U (en) Assembled sloping leg steel suspension bridge
CN212002172U (en) Assembled building stores pylon convenient to it is fixed
CN203961252U (en) The regularization rigid connecting tube device of scaffold
CN205047985U (en) Horizontal fixing device of superelevation layer pump sending concrete duct
CN202031308U (en) Inverted-hanging type scaffold
CN102002979A (en) Method for fixing embedded part by using screw
CN104562918A (en) Self-anchored suspension bridge anchor span cast-in-place concrete box beam and construction method thereof
CN206180943U (en) Photovoltaic module adjustment support of swift installation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130102