CN202631580U - Installation assembly for state monitoring equipment of high-voltage transmission lines - Google Patents

Installation assembly for state monitoring equipment of high-voltage transmission lines Download PDF

Info

Publication number
CN202631580U
CN202631580U CN 201220193088 CN201220193088U CN202631580U CN 202631580 U CN202631580 U CN 202631580U CN 201220193088 CN201220193088 CN 201220193088 CN 201220193088 U CN201220193088 U CN 201220193088U CN 202631580 U CN202631580 U CN 202631580U
Authority
CN
China
Prior art keywords
shaped
transmission line
monitoring device
ultra
state monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220193088
Other languages
Chinese (zh)
Inventor
周瑜
何艳娇
路自强
杨小库
张仲秋
孟可风
张海宁
王鹏飞
郑勇
吴克胜
王辉
张正超
夏文强
焦通
春江
王芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Electric Power Research Technology Co ltd
Shanghai Yongneng Energy Technology Development Co ltd
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Electric Power Research Institute of State Grid Qinghai Electric Power Co Ltd
Original Assignee
Shanghai Yongneng Energy Technology Co Ltd
QINGDAO ELECTRIC POWER RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yongneng Energy Technology Co Ltd, QINGDAO ELECTRIC POWER RESEARCH INSTITUTE filed Critical Shanghai Yongneng Energy Technology Co Ltd
Priority to CN 201220193088 priority Critical patent/CN202631580U/en
Application granted granted Critical
Publication of CN202631580U publication Critical patent/CN202631580U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses an installation assembly for state monitoring equipment of high-voltage transmission lines, which can decrease the amount of installation accessories and simplify the installation process. The installation assembly comprises at least one L-shaped buckling piece which is fixed on a housing of the equipment via a screw or in a welding manner. The L-shaped bucking piece is reversely engaged with an L-shaped angle iron of a transmission line tower, and the L-shaped bucking piece is fastened with the L-shaped angle iron via screws, thereby installing the state monitoring equipment of the high-voltage transmission lines.

Description

Ultra-high-tension power transmission line condition monitoring device installation component
Technical field
The utility model relates to a kind of assembly that is used for erecting equipment, relates in particular to the installation component to the ultra-high-tension power transmission line condition monitoring device.
Background technology
It is representative that China's intelligent grid proposes " strong intelligent grid " with State Grid Corporation of China; " strong intelligent grid " is to be the basis with strong rack; With communication information platform is support; With the Based Intelligent Control is means, comprises generating, transmission of electricity, power transformation, distribution, electricity consumption and scheduling six big links, covers all electric pressures; Realizing the height integral fusion of " flow of power, information flow, Business Stream ", is strong reliable, economical and efficient, clean energy resource, transparent opening, friendly interactive modern power network.Need badly the power transmission and transforming equipment running status carried out overall monitor under extra-high voltage and the intelligent complicated big electrical network that combines in that China is this, thus realize electric power netting safe running visual, can control.
China intelligent grid gets into all-round construction period, and everything goes well with your work advances for each item, but also be faced with all difficult problems in the process of construction.Need badly the transmission facility running status carried out overall monitor under extra-high voltage and the intelligent complicated big electrical network that combines in that China is this, thus realize electric power netting safe running visual, can control.The transmission facility status monitoring is occupying extremely important status aspect the bottom monitoring in the intelligent grid framework, be the basis that Chinese intelligent grid is built.
Along with increasing condition monitoring device is installed on the ultra-high-tension power transmission line an iron rake with three to six teeth, each Electric Power Design Institute begins its mounting means of increasing concern: whether whether overweight, firm, whether design is reasonable or the like.Each condition monitoring device manufacturer is also constantly attempting new installation and design, to reach the purpose that installation process is simple, light, cost is lower.
Monitoring equipment is installed on the open-air iron tower in transmission line of electricity corridor usually; But its mounting means is a big problem, and former usual manner is through installation accessories, on iron tower, builds a chain-wales; Condition monitoring device is fixed on this chain-wales; But this kind mode need consume more installation accessories, has increased the weight of equipment set virtually, and installation process is comparatively loaded down with trivial details
The utility model content
The purpose of the utility model is to address the above problem, and a kind of ultra-high-tension power transmission line condition monitoring device installation component is provided, and can reduce the quantity of installation accessories, simplifies installation process.
The technical scheme of the utility model is: the utility model has disclosed a kind of ultra-high-tension power transmission line condition monitoring device installation component, comprising:
At least one fastener is fixed on the ultra-high-tension power transmission line condition monitoring device shell, and the ultra-high-tension power transmission line condition monitoring device is through L shaped fastener and the reverse interlock of L shaped electric power line pole tower angle bar, and through fastening L shaped fastener of screw and L shaped angle bar.
The utility model contrast prior art has following beneficial effect: because the shaft tower of ultra-high-tension power transmission line is by the L shaped angle bar assembling of different model; And form through screw is fastening; Therefore the scheme of the utility model is the reciprocal L shaped buckle of a kind of and L shaped angle bar of design; Be fixed on the back side of condition monitoring device through welding or screw, buckle fastens angle bar downwards during installation, carries out fastening getting final product through screw tightening.Compared to prior art, the installation component of the utility model has been simplified installation process, has shortened the set-up time, has reduced the quantity of installation accessories, and influence significantly reduces to body of the tower, has improved the construction factor of assurance, and equipment self also more shows attractive in appearance simultaneously.
Description of drawings
Fig. 1 shows the mounting means synoptic diagram of embodiment of the ultra-high-tension power transmission line condition monitoring device installation component of the utility model.
Fig. 2 shows the mounting means explosive view of embodiment of the ultra-high-tension power transmission line condition monitoring device installation component of the utility model.
Embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is done further to describe.
Fig. 1 shows the mounting means of embodiment of the equipment installation component of the utility model, and Fig. 2 shows the blast schematic construction of mounting means.Please be simultaneously referring to Fig. 1 and Fig. 2, the ultra-high-tension power transmission line condition monitoring device installation component of present embodiment comprises: angle bar 1, fastener 2a, 2b (being illustrated as 2 in the present embodiment).Fastener 2a, 2b fix (for example with welding manner or screw fastening means) on the shell of monitoring equipment 4 (for example being the ultra-high-tension power transmission line condition monitoring device).Monitoring equipment 4 is fastenedly connected through fastener 2a, 2b and angle bar 1, is installed on the ultra-high-tension power transmission line condition monitoring device installation component.
In the present embodiment, angle bar 1 is the general tower material that shaft tower uses that erects power transmission lines, and is L shaped.Fastener 2a, 2b all are L shaped fasteners, which is provided with screw.Fixed screw is through being screwed into the screw of fastener 2a, 2b, until the firm angle bar 1 that withstands.
The foregoing description provides to those of ordinary skills and realizes and use the utility model; Those of ordinary skills can be under the situation of the invention thought that does not break away from the utility model; The foregoing description is made various modifications or variation; Thereby the protection domain of the utility model do not limit by the foregoing description, and should be the maximum magnitude that meets the inventive features that claims mention.

Claims (1)

1. a ultra-high-tension power transmission line condition monitoring device installation component is characterized in that, comprising:
At least one L shaped fastener; Be fixed on the ultra-high-tension power transmission line condition monitoring device shell; The ultra-high-tension power transmission line condition monitoring device is through L shaped fastener and the reverse interlock of L shaped electric power line pole tower angle bar, and through fastening L shaped fastener of screw and L shaped electric power line pole tower angle bar.
CN 201220193088 2012-04-28 2012-04-28 Installation assembly for state monitoring equipment of high-voltage transmission lines Expired - Lifetime CN202631580U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220193088 CN202631580U (en) 2012-04-28 2012-04-28 Installation assembly for state monitoring equipment of high-voltage transmission lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220193088 CN202631580U (en) 2012-04-28 2012-04-28 Installation assembly for state monitoring equipment of high-voltage transmission lines

Publications (1)

Publication Number Publication Date
CN202631580U true CN202631580U (en) 2012-12-26

Family

ID=47384770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220193088 Expired - Lifetime CN202631580U (en) 2012-04-28 2012-04-28 Installation assembly for state monitoring equipment of high-voltage transmission lines

Country Status (1)

Country Link
CN (1) CN202631580U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116958A (en) * 2013-01-22 2013-05-22 绍兴电力局 Intelligent monitoring device for power grid intelligent external force damage prevention

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116958A (en) * 2013-01-22 2013-05-22 绍兴电力局 Intelligent monitoring device for power grid intelligent external force damage prevention

Similar Documents

Publication Publication Date Title
JP2013085369A5 (en)
CN105762918A (en) Caravan energy control system
CN204194206U (en) A kind of self-powered lamp light fountain shower nozzle
CN202631580U (en) Installation assembly for state monitoring equipment of high-voltage transmission lines
CN202663043U (en) Wire fixing clamp
CN203166339U (en) Module combination installation type power control box
CN202260321U (en) Improved electric box structure
CN103405922B (en) One is bolted wheel
CN202971843U (en) Novel electric power storage (EPS) speed reducer shell
CN201230289Y (en) Integrated panel turnover type solar electric power generation equipment
CN202514778U (en) Multifunctional fan
CN201756151U (en) Chain wheel protection frame of electric bicycle
CN205039740U (en) Portable solar power power that generates electricity
CN203153598U (en) Portable aromatherapy tissue box
CN202678347U (en) Combined solar battery
CN219535680U (en) Portable pull rod power supply
CN203010562U (en) A remote control having a lighting function
CN203223337U (en) Pitch-variable cabinet structure
CN208376670U (en) Caravan electrical system integrated control case
CN208889727U (en) A kind of integral type UAV Intelligent battery case
CN211371827U (en) Comprehensive management and control equipment for intelligent transformer substation
CN204008779U (en) Panel type meter case
CN205195574U (en) Multifunctional power adapter
CN201584889U (en) Anti-dropping bolt structure of frequency converter
CN201499000U (en) Solar energy power box

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID QINGHAI ELECTRIC POWER COMPANY

Effective date: 20140402

Owner name: STATE GRID QINGHAI ELECTRIC POWER COMPANY ELECTRIC

Free format text: FORMER OWNER: SHANGHAI YONGNENG ENERGY TECHNOLOGY CO., LTD.

Effective date: 20140402

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID QING

Free format text: FORMER NAME: QINGDAO ELECTRIC POWER RESEARCH INSTITUTE

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 810008 XINING, QINGHAI PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 54 Xining West Road, Qinghai, No. 8, No. 810008

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID QINGHAI ELECTRIC POWER Co.

Patentee after: Shanghai Yongneng Energy Technology Development Co.,Ltd.

Address before: 54 Xining West Road, Qinghai, No. 8, No. 810008

Patentee before: Electric Power Research Institude of State Grid Qinghai Electric Power Co.

Patentee before: Shanghai Yongneng Energy Technology Development Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20140402

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID QINGHAI ELECTRIC POWER Co.

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID QINGHAI ELECTRIC POWER Co.

Patentee after: Shanghai Yongneng Energy Technology Development Co.,Ltd.

Patentee after: QINGHAI ELECTRIC POWER RESEARCH TECHNOLOGY CO.,LTD.

Address before: 54 Xining West Road, Qinghai, No. 8, No. 810008

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID QINGHAI ELECTRIC POWER Co.

Patentee before: Shanghai Yongneng Energy Technology Development Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121226