CN202614846U - An intelligent electricity meter - Google Patents

An intelligent electricity meter Download PDF

Info

Publication number
CN202614846U
CN202614846U CN 201220222727 CN201220222727U CN202614846U CN 202614846 U CN202614846 U CN 202614846U CN 201220222727 CN201220222727 CN 201220222727 CN 201220222727 U CN201220222727 U CN 201220222727U CN 202614846 U CN202614846 U CN 202614846U
Authority
CN
China
Prior art keywords
electrically connected
electricity meter
signal lamp
starter
charge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220222727
Other languages
Chinese (zh)
Inventor
孙权
张建冲
何奇伟
孙涛
赵洪丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoyuan Power Supply Co Ltd Of Jilin Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Liaoyuan Power Supply Co Ltd Of Jilin Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoyuan Power Supply Co Ltd Of Jilin Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Liaoyuan Power Supply Co Ltd Of Jilin Electric Power Co Ltd
Priority to CN 201220222727 priority Critical patent/CN202614846U/en
Application granted granted Critical
Publication of CN202614846U publication Critical patent/CN202614846U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to an intelligent electricity meter and belongs to electrical equipment. A current counter and a clock timer are electrically connected with a digital signal central processor which is electrically connected with a signal lamp starter 1, a pulse counter, and a signal lamp starter 2. The signal lamp starter 1 is electrically connected with a charge prompting display lamp, while the pulse counter is electrically connected with an electronic pulse counting lamp. The signal lamp starter 2 is electrically connected with a power cut display lamp. The intelligent electricity meter is advantaged by simple structure, easy use, usage of computer, communication and Unionpay internet technology, and integration of electric energy metering, charge recording, environmental friendly charge reminding, and power cut and delivery. The intelligent electricity meter gives a prompt without interference with users when charge in the electricity meter is insufficient and timely notifies customers by short message or other methods, achieving double insurance while saving manpower and material resources. Further, not a defaulting user is present so that pressure of marketing system is relieved.

Description

Intelligent electric meter
Technical field
The utility model belongs to power equipment, refers in particular to a kind of ammeter.
Background technology
The management of current big industry, commerce, residential electricity consumption is too backward, adopt for many years always first electricity consumption, after the traditional work mode of checking meter, paying again.At present, the Northeast's electric energy meter basically all changes automatic meter reading system into, and the manual work that remains unchanged of arrearage advice note is sent to.Usually whole unit arrearage advice note is attached to building face or the arrearage advice note of one of each household pasted on the ammeter box outdoors.List after the subsides often just was torn less than two days, and often fallen by rain-out summer, was stained with winter or was easy to, and these all can cause the arrearage family not see that arrearage is single.Urge the end of month Fei Yuan to begin to have a power failure, do not see that advice note is just had a power failure, cause conflicting through regular meeting and conflict with the client.This inefficient working method has caused human and material resources, temporal significant wastage to administrative authority.In order to adapt to needs of society, guarantee user security, rationally, electricity consumption easily, the management mode transformation of traditional ammeter and electricity consumption is seemed necessary.
Summary of the invention
The utility model provides a kind of intelligent electric meter, needs manual metering, notice, power failure to solve existing ammeter, causes human and material resources, the problem of significant wastage on the time.
The technical scheme of the utility model is: galvanometer measuring device, clock timer are electrically connected with the digital signal central processing unit respectively; The digital signal central processing unit is electrically connected with signal lamp starter one, impulse meter, signal lamp starter two respectively; Signal lamp starter one is electrically connected with expense prompting display lamp; Impulse meter is electrically connected with electronic impulse counting lamp, and signal lamp starter two is electrically connected with the power failure display lamp.
The advantage of the utility model is: novel structure is simple; Easy to use, appliance computer, communication, Unionpay's Internet technology; Have electric energy metrical, remember that expense, environmental protection are urged expense, stopped sending electricity is one; The prompting that do not disturb residents of expense deficiency can also adopt additive methods such as note in time to notify the client in the table, reaches dual fail-safe and uses manpower and material resources sparingly.Do not have the defaulting subscriber to occur, alleviate marketing system pressure.
Description of drawings
Fig. 1 is the theory diagram of the utility model.
Embodiment
Galvanometer measuring device 2, clock timer 3 are electrically connected with digital signal central processing unit 1 respectively; Digital signal central processing unit 1 is electrically connected with signal lamp starter 1, impulse meter 5, signal lamp starter 26 respectively; Signal lamp starter 1 is electrically connected with expense prompting display lamp 7; Impulse meter 5 is electrically connected with electronic impulse counting lamp 8, and signal lamp starter 26 is electrically connected with power failure display lamp 9.
Through the design and the distant communication function of electronic integrated circuit, control with computer networking and employing software.On dial plate, be provided with three row's pilot lamp, point out behind the bright lamp of expense prompting display lamp, the electricity charge amount of money gets into the lower limit of setting, and simultaneously, sends SMS to the user, or points out to the voice call of carrying out of base.The every flicker of electronic impulse counting lamp is for 3200 times every kilowatt hour kilowatt-hour.After the power failure display lamp lighted, computer was to this user success that had a power failure.Computer carries out uninterrupted tracking in 24 hours to be checked meter, urges expense, stop sending electricity, can notify at any time to pay the fees at any time and send at any time.Absolutely satisfied for reaching the client, Customs Assigned Number, title, the pay the fees amount of money and account balance, to the same day electric energy meter the expression number be dealt into client's mobile phone with note.Guarantee that through such mode the not enough client of the electricity charge in time carries out premium notice, stop arrearage and do not obtain notifying the incident that just has a power failure.Also break away from and be in arrears with the huge electricity charge after large enterprises close down.

Claims (1)

1. intelligent electric meter; It is characterized in that: galvanometer measuring device, clock timer are electrically connected with the digital signal central processing unit respectively; The digital signal central processing unit is electrically connected with signal lamp starter one, impulse meter, signal lamp starter two respectively; Signal lamp starter one is electrically connected with expense prompting display lamp, and impulse meter is electrically connected with electronic impulse counting lamp, and signal lamp starter two is electrically connected with the power failure display lamp.
CN 201220222727 2012-05-18 2012-05-18 An intelligent electricity meter Expired - Lifetime CN202614846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220222727 CN202614846U (en) 2012-05-18 2012-05-18 An intelligent electricity meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220222727 CN202614846U (en) 2012-05-18 2012-05-18 An intelligent electricity meter

Publications (1)

Publication Number Publication Date
CN202614846U true CN202614846U (en) 2012-12-19

Family

ID=47348535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220222727 Expired - Lifetime CN202614846U (en) 2012-05-18 2012-05-18 An intelligent electricity meter

Country Status (1)

Country Link
CN (1) CN202614846U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103605331A (en) * 2013-10-25 2014-02-26 国家电网公司 Intelligent electricity consumption service system based on UC technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103605331A (en) * 2013-10-25 2014-02-26 国家电网公司 Intelligent electricity consumption service system based on UC technology
CN103605331B (en) * 2013-10-25 2016-08-17 国家电网公司 A kind of intelligent power service system based on UC technology

Similar Documents

Publication Publication Date Title
CN103617717B (en) The electricity charge based on Quick Response Code check meter pay method
CN202693653U (en) Single-phase fee control intelligent electric energy meter
CN103632260B (en) The electricity charge based on Quick Response Code check meter pay system
CN105631760A (en) Handheld power phone inquiry system
CN203039432U (en) Intelligent concentrator
CN202887424U (en) Meter reading system with arrearage early warning function
CN205080548U (en) Electricity bill payment reminding inquiry system based on electric power broadband carrier wave
CN204066252U (en) A kind of individual event local charge control intelligent electric energy meter
CN202614846U (en) An intelligent electricity meter
Kappagantu et al. Smart grid implementation in India–A case study of Puducherry pilot project
CN103680106A (en) Intelligent air switch system
CN104240149A (en) Energy efficiency metering system
CN201974471U (en) Single-phase electronic carrier electric energy meter
Rao et al. GSM based Energy meter reading and billing
CN104459253A (en) Intelligent electric meter based on network
CN202855064U (en) Remote electric energy metering management system
CN202649304U (en) Prepaid metering device
CN201804256U (en) Combined management and control system for water, electricity and gas
CN103455952A (en) Indoor information displaying and publishing system
Auditor-General Realising the benefits of smart meters
CN205583848U (en) Intelligent ammeter cabinet
CN205080601U (en) Electricity bill payment reminding inquiry terminal based on power consumption information collection system
CN204008760U (en) Combination unit is play in a kind of ammeter box advertisement
CN203896365U (en) Power grid user intelligent interaction terminal
CN209785144U (en) Double-section prepayment electric energy meter based on NB-IOT communication

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121219

CX01 Expiry of patent term