CN202600100U - On-line monitoring device of high-voltage transformer bushing tap grounding - Google Patents

On-line monitoring device of high-voltage transformer bushing tap grounding Download PDF

Info

Publication number
CN202600100U
CN202600100U CN 201220099708 CN201220099708U CN202600100U CN 202600100 U CN202600100 U CN 202600100U CN 201220099708 CN201220099708 CN 201220099708 CN 201220099708 U CN201220099708 U CN 201220099708U CN 202600100 U CN202600100 U CN 202600100U
Authority
CN
China
Prior art keywords
shell
transformer
bushing
monitoring device
end screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220099708
Other languages
Chinese (zh)
Inventor
张世才
马呈霞
秦睿
吴金辉
葛智平
郭涛
张顺
***
马林东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Gansu Electric Power Co Ltd
Priority to CN 201220099708 priority Critical patent/CN202600100U/en
Application granted granted Critical
Publication of CN202600100U publication Critical patent/CN202600100U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Testing Relating To Insulation (AREA)

Abstract

The utility model relates to an on-line monitoring device of high-voltage transformer bushing tap grounding, which comprises three tap grounding detection devices, a sample transmission device, a remote monitoring device and a solar cell array, wherein the three tap grounding detection devices are connected with the sample transmission device by cables, the sample transmission device is connected with the remote monitoring device wirelessly, and the solar cell array is connected with the sample transmission device. The tap grounding device provided by the utility model enables the transformer bushing tap grounding to be more reliable; current of the transformer bushing tap grounding is detected by a measuring coil installed in the tap grounding device; sampling voltage outputted by the measuring coil is led out by a measuring wire to act as input signals of the sample transmission device; the sample transmission device outputs signals to the remote monitoring device; and the tap grounding current can be continuously monitored through the remote monitoring device. According to the utility model, real-time remote continuous monitoring on states of the transformer bushing tap grounding current is realized by adopting the on-line monitoring device, and the working condition of the on-line monitoring device is reliable and stable.

Description

High voltage transformer bushings end screen ground connection on-Line Monitor Device
Technical field
The utility model belongs to the facility that the power transmission and transformation field is detected high voltage transformer bushings end screen ground state, specifically a kind of high voltage transformer bushings end screen ground connection on-Line Monitor Device.
Background technology
In order to make 110kV and the above radial and axial field intensity of bushing shell for transformer even; Its insulation system generally adopts capacitor type; Promptly on conducting rod, wrap many insulation courses, accompany many aluminium foils according to the field strength distribution characteristics therebetween, to form a string concentric cylindrical capacitor.Outermost layer aluminium foil i.e. end screen is drawn through small casing, supplies Jie who measures sleeve pipe to decrease and electric capacity, and the end screen is in operation and answers ground connection.If because a variety of causes causes end screen imperfect earth; The end screen can form an electric capacity over the ground so, and this electric capacity is much smaller than the electric capacity of sleeve pipe itself, according to the capacitances in series principle; To between end screen and ground, form very high suspension voltage; Cause the discharge over the ground of end screen, near the insulant burning, the bushing explosion accident also can take place in serious.
The bushing shell for transformer of 110 kV and above electric pressure is generally the oilpaper capacitor type, and it is furnished with bottom shielding of bushing with the seat junction that raises.Bottom shielding of bushing is as a vitals of bushing shell for transformer, and its practical application is very extensive.The effect of bottom shielding of bushing in transformer test mainly contain following some:
1. by the responder of bottom shielding of bushing as winding deformation;
2. utilize bottom shielding of bushing to carry out the calibration of square wave;
3. by bottom shielding of bushing calibration transformer high-voltage side voltage;
4. rely on bottom shielding of bushing to extract local discharge signal;
5. rely on bottom shielding of bushing to carry out the measurement of dielectric dissipation factor.
Common bottom shielding of bushing is configured with spring compression type, only bar outlet formula, shell fragment contact etc. at present.Can also there be complete on-Line Monitor Device for the monitoring of bushing shell for transformer end screen ground connection reliability.Existing monitoring means mainly contains two: one of which, and the power transformation operation personnel are when the equipment of tour, and whether inspection bushing shell for transformer end screen device seepage and greasy dirt situation occur, and last screen place has or not the paradoxical discharge situation; Its two, the bushing shell for transformer of 1lOkV and above electric pressure end screen carries out the emphasis inspection when overhauling prerun.Two kinds of methods are all accomplished by manual work and can't be carried out continuous monitoring, have the erroneous judgement phenomenon of failing to judge.Bottom shielding of bushing is one of important accessory of bushing shell for transformer. the quality of end screen performance directly has influence on the quality of sleeve pipe state.According to statistics, the bushing shell for transformer fault that causes by end screen reason and occupy sizable ratio unusually.Though bushing shell for transformer end screen earthing device is very little parts on transformer, it is extremely important for the safe operation of transformer.For example 2008, certain 330kV electric substation of UHV (ultra-high voltage) company was because the conducting rod of 3# main transformer high-pressure side B phase bottom shielding of bushing ground connection small casing and end screen loose contact cause low-yield shelf depreciation; Inwardly develop through the long period, the ablation short circuit partition capacitance screen, under WV, cause the high pressure shorted to earth; Cause bushing explosion; Initiation A, C two phase sleeve pipes burst, and cause main transformer three side switch trip stoppage in transit power transformation ordinary accidents, and this time accident causes the #3 main transformer to stop using half a year; Not only cause huge direct economic loss, bring hidden danger to electric power netting safe running simultaneously.
At present State Grid Corporation of China is building the intelligent grid engineering energetically, and a large amount of electric substations are designed to unmanned electric substation, and this just has higher requirement to the comprehensive online distant place watch-keeping of operating condition of the major equipment transformer of electric substation.So research provides high voltage transformer bushings end screen ground connection on-line monitoring, and safe operation has important practical significance for high-tension transformer.
The utility model content
The purpose of the utility model provides a kind of bushing shell for transformer end screen ground connection on-Line Monitor Device reliable, that phenomenon is failed to judge in the elimination erroneous judgement of monitoring, and can't realize the defective of long-range watch-keeping to overcome existing apparatus.
The technical scheme that the utility model realization above-mentioned purpose is taked is following: a kind of bushing shell for transformer end screen ground connection on-Line Monitor Device; Comprise three end screen ground detection devices, sampling conveyer, remote monitoring device, solar battery group; Three end screen ground detection devices are connected by cable with the sampling conveyer, and the sampling conveyer is connected by radio communication with the remote monitoring device, and solar battery group is connected with the sampling conveyer.
Screen ground detection device in end makes bushing shell for transformer end screen reliable ground, and makes and can go measurement to ground current; The sampling conveyer carries out conversion and measures teletransmission sample rate current; Solar battery group provides power supply for sampling conveyer branch; The remote monitoring device, the current signal that a distant place is transmitted carries out record analysis, demonstration, and unusual sleeve pipe is carried out alarm, prompting operations staff inspection.
End screen earthing device comprises shell, conduction contact lever, guide sleeves, insulating bushing, back up pad, spring, pressing plate, coil brace, measurement coil and end cap; Shell is provided with flange, and the conduction contact lever is installed at the shell center, the conduction contact lever front portion guide sleeves that is slidingly installed; The guide sleeves rear end fixedly mounts back up pad, pocketed springs and installation pressing plate successively, between guide sleeves, back up pad, spring and pressing plate and the shell insulating bushing is installed, conduction contact lever rear portion fixed installation coil brace; Twine on the coil brace and measure coil; Two outlet nuts are installed on the coil brace, are measured the coil two ends and be individually fixed in two outlet nuts, two outlet nuts are connected with the measurement lead respectively; The other end of measuring lead is positioned at enclosure, and outer casing back is threaded with end cap.
End screen earthing device is installed on the bushing shell for transformer through flange, and flange is provided with the rim of the mouth, guarantees the correct centering of end screen earthing device, and the conduction contact lever accurately docks with transformer end screen leading-off rods.During on-the-spot the installation, tighten flange bolt, conduction contact lever and the back up pad, coil brace and the measurement coil that are fixed on the conduction contact lever will move backward, and spring is compressed, and make the conduction contact lever reliably contact with transformer end screen leading-off rods.
The bushing shell for transformer end screen that uses now is directly grounded, can't detect ground current.The utility model end screen earthing device structural design makes that bushing shell for transformer end screen ground connection is more reliable; Detect bushing shell for transformer end screen ground current through the measurement coil of installing in the screen earthing device of end; Measuring the sampled voltage of coil output draws through measuring lead; As the input signal of sampling conveyer, the sampling conveyer can continuous monitoring end screen ground current through the remote monitoring device to remote monitoring device output signal.The utility model has been realized the real time remote continuous monitoring to bushing shell for transformer end screen ground current state, duty reliable and stable.
If end screen earthing device ground loop open circuit, electric power system, the signal transmission loop of sampling conveyer will be born high voltage; If adopt conventional power supply for the power supply of sampling conveyer, will burn electric power system.The utility model adopts solar battery group for the power supply of sampling conveyer, thoroughly solves this difficult problem; The wireless communication transmissions form is adopted in the signal transmission, has realized the isolation of sampling conveyer and other system electrical, has solved electrical isolation problem between sampling conveyer and the remote monitoring device.
The utility model provides reliably bushing shell for transformer end screen grounding monitoring device accurately of a kind of reliable Information Monitoring, overcome the defective that existing apparatus can't be realized long-range watch-keeping.Existing bushing shell for transformer end screen earthing device can't be grounded the supervision of electric current because design is too simple, can only check ruuning situation by manual regular, can't carry out continuous monitoring, also easily fault generating is judged by accident the phenomenon of failing to judge.
Description of drawings
Fig. 1 is the structural representation of the utility model,
Fig. 2 is the structural representation of end screen ground detection device,
Fig. 3 is the grounded inspection circuit schematic diagram of end screen ground detection device,
Fig. 4 is the structural representation of sampling conveyer and remote monitoring device.
Among the figure: 1-end screen ground detection device, 1A-first end screen earthing device, 1B-second end screen earthing device, 1C-the 3rd end screen earthing device, 2-sampling conveyer; 3-remote monitoring device, 4-solar battery group, 5-shell, 6-insulating bushing, 7-conduction contact lever; 8-back up pad, 9-spring, 10-pressing plate, 11-coil brace, 12-measurement coil; 13-outlet nut, 14-end cap, 15-fairlead, 16-guide sleeves, 17-clamp nut; 18-the first jump ring, 19-the second jump ring, 20-the three jump ring, 21-the four jump ring, 22-O-ring seal; 23-measure lead, 24-RS-485 communication, 25-bushing shell for transformer end screen equivalent electrical circuit, 26-D/A converter module, 26A-first D/A converter module; 26B-second D/A converter module, 26C-the 3rd D/A converter module, 27-programmable controller, 28A-first data radio station, 28B-second data radio station; 29-industrial computer, 30-warning output relay, 31-audible-visual annunciator, V0-bushing shell for transformer output voltage, C-bottom shielding of bushing equivalent capacity; R-end screen stake resistance, V1-sampled voltage, V1A-first sampled voltage, V1B-second sampled voltage, V1C-the 3rd sampled voltage.
Embodiment
As shown in Figure 1: a kind of bushing shell for transformer end screen ground connection on-Line Monitor Device comprises three end screen ground detection devices 1, sampling conveyer 2, remote monitoring device 3, solar battery group 4; Three end screen ground detection devices 1 and sampling conveyer 2 are connected by cable, and sample conveyer 2 and remote monitoring device 3 are connected by wireless communication transmissions, and solar battery group 4 is connected with the conveyer 2 of sampling.
Referring to Fig. 2: end screen earthing device 1 comprises shell 5, conduction contact lever 7, guide sleeves 16, insulating bushing 6, back up pad 8, spring 9, pressing plate 10, coil brace 11, measures coil 12 and end cap 14; Shell 5 is provided with flange, and conduction contact lever 7 is installed at shell 5 centers, the conduction contact lever 7 front portions guide sleeves 16 that is slidingly installed; Guide sleeves 16 rear ends fixedly mount back up pad 8, pocketed springs 9 successively and pressing plate 10 are installed, and insulating bushing 6 is installed between guide sleeves 16, back up pad 8, spring 9 and pressing plate 10 and the shell 5, and the rear end of insulating bushing 6 and front end are fixedly mounted on shell 5 through first jump ring 18 and the 4th jump ring 21 respectively; Insulating bushing 6 makes conduction contact lever 7, guide sleeves 16, back up pad 8, spring 9 and pressing plate 10 and shell 5 insulate; Back up pad 8 positions with 10 pairs of springs 9 of pressing plate, and back up pad 8 is fixing by the 3rd jump ring 20 with conduction contact lever 7, pressing plate 10 and conduction contact lever 7 clearance fit; Second jump ring 19 that is fixed on insulating bushing 6 is equipped with in pressing plate 10 rear ends; Pressing plate 10 rear ends are carried out spacing, conduction contact lever 7 rear portions fixed installation coil brace 11, clamp nut 17 is fixed in conduction contact lever 7 with coil brace 11; Twine on the coil brace 11 and measure coil 12; Two outlet nuts 13 are installed on the coil brace 11, and measurement coil 12 two ends are individually fixed in 13, two outlet nuts 13 of two outlet nuts and are connected with measurement lead 23 respectively; Fairlead 15 will be connected on measurement lead 23 on the outlet nut 13 and draw shell 5 and seal; The other end of measuring lead 23 is positioned at shell 5 outsides, and shell 5 rear ends are threaded with end cap 14, and 22 pairs of body seals of O-ring seal are installed between shell 5 rear ends and the end cap 14.
Three end screen earthing device 1 are installed on three sleeve pipes of transformer through flange, and flange is provided with the rim of the mouth, guarantees end screen earthing device and the correct centering of sleeve pipe.The A of every transformer, B, C three-phase end screen sleeve pipe shield with three ends that earthing device is corresponding one by one to join.Butut direction with Fig. 2 is an example: during on-the-spot the installation; Tighten flange bolt; Conduction contact lever 7 and other parts that are fixed on the conduction contact lever are back up pad 8, coil brace 11 and measure coil 12 toward moving right; Spring 9 is compressed, and makes conduction contact lever 7 reliably contact with transformer end screen leading-off rods.
The grounded inspection circuit principle of end screen earthing device is as shown in Figure 3: be bushing shell for transformer end screen equivalent electrical circuit 25 in the frame of broken lines among Fig. 3, V0 is the bushing shell for transformer output voltage, and C is the bottom shielding of bushing equivalent capacity.The measurement coil 12 of end screen ground detection device 1 is the resistance R of end screen ground detection device 1, and the sampled voltage V1 that measures coil 12 outputs draws through measuring lead 23, as the voltage input signal of sampling conveyer 2.
Referring to Fig. 1 and Fig. 4: sampling conveyer 2 comprises three D/A converter modules 26, programmable controller 27 and the first data radio station 28A; Three D/A converter module 26 input ends and three end screen earthing device 1 join through cable is corresponding one by one, receive through measuring the sampled voltage V1 signal of lead 23 outputs; Be connected with the first D/A converter module 26A like the first end screen earthing device 1A; Receive the first sampled voltage V1A signal; Second end is shielded earthing device 1B and is connected with the second D/A converter module 26B; Receive the second sampled voltage V1B signal, the 3rd end screen earthing device 1C is connected with the 3rd mould modular converter 26C, receives the 3rd sampled voltage V1C signal; Three D/A converter module 26 output terminals are connected with programmable controller 27 input ends, and programmable controller 27 output terminals are connected through RS-485 communication 24 with the first data radio station 28A input end; Remote monitoring device 3 comprises that the second data radio station 28B and industrial computer 29, the first data radio station 28A are connected with the second data radio station 28B signal, and the second data radio station 28B output terminal is connected with industrial computer 29; Industrial computer 29 receives the wireless signal that sampling conveyer 2 transmits through data radio station 28, realizes every transformer end screen ground signalling collection.
Three D/A converter modules 26 convert three last sampled voltage V1 that shield earthing device 1 output into the 4-20mA standard signal respectively, are about to the first sampled voltage V1A signal, the second sampled voltage V1B signal and the 3rd sampled voltage V1C signal input programmable logic controller 27; Input signal reaches the first data radio station 28A through programmable controller 27 computings through the RS-485 communication.
For the staff who the transformer abnormal information is informed in time transformer is on-the-spot, perfect as the utility model, referring to Fig. 4: programmable controller 27 output terminals are connected with audible-visual annunciator 31 through warning output relay 30; With unusual sleeve pipe alerting signal output, prompting field operator inspection.
Industrial computer is equipped with functional software; Look screen at industrial computer and realize that the ground current signal trend of transformer end, distant place screen device transmission writes down in real time, analyzes and shows, realize that transformer end screen ground signalling historical trend shows and the abnormity early warning prompting of transformer end screen state.
The utility model through experimental verification and be used for the trial run.Experimental technique inserts the bushing shell for transformer end screen grounding monitoring device of the utility model with a standard capacitor analogue transformer capacitance of bushing, loads different high pressure in the standard capacitor high-pressure side and makes an experiment, and test principle is seen Fig. 3.
Experimental example 1 loads the 10KV high pressure in the standard capacitor high-pressure side and makes an experiment:
1, loads the 10KV high pressure to the standard capacitor high-pressure side; Inspection end screen earthing device and grounded inspection circuit part, sampling conveyer branch, solar battery group, remote monitoring device working condition; The current values that record remote monitoring device shows; Read measured value continuously 10 times, get its mean value as measured current.
2, relatively, calculate the measured deviation value with the theoretical current value under measured current value and the 10KV high pressure.
Experimental example 2 loads the 110KV high pressure in the standard capacitor high-pressure side and makes an experiment:
1, loads the 110KV high pressure to the standard capacitor high-pressure side; Inspection end screen earthing device and grounded inspection circuit part, sampling conveyer branch, solar battery group, remote monitoring device working condition; The current values that record remote monitoring device shows; Read measured value continuously 10 times, get its mean value as measured current.
2, relatively, calculate the measured deviation value with the theoretical current value under measured current value and the 110KV high pressure.
Experimental example 3 loads the 220KV high pressure in the standard capacitor high-pressure side and makes an experiment:
1, loads the 220KV high pressure to the standard capacitor high-pressure side; Inspection end screen earthing device and grounded inspection circuit part, sampling conveyer branch, solar battery group, remote monitoring device working condition; The current values that record remote monitoring device shows; Read measured value continuously 10 times, get its mean value as measured current.
2, relatively, calculate the measured deviation value with the theoretical current value under measured current value and the 220KV high pressure.
Prove through above-mentioned experiment: end screen earthing device 1 voltage withstand class meets insulating requirements under the 220KV high pressure; Sampling conveyer 2 reliable operations, the digital-to-analog conversion precision satisfies the requirement of transformer safety monitoring system; Remote monitoring device 3 software functions meet design requirement, and real-time tendency record, analysis and Presentation Function satisfy the requirement of transformer safety monitoring system, and data radio station is in proper working order, can tolerate power transmission and transformation field highfield environment.

Claims (6)

1. the ground connection on-Line Monitor Device is shielded at a bushing shell for transformer end, it is characterized in that: this monitoring device comprises three end screen ground detection devices (1), sampling conveyer (2), remote monitoring device (3), solar battery group (4); Three end screen ground detection devices (1) are connected by cable with sampling conveyer (2), and sampling conveyer (2) is connected by wireless communication transmissions with remote monitoring device (3), and solar battery group (4) is connected with sampling conveyer (2).
2. a kind of bushing shell for transformer as claimed in claim 1 end screen ground connection on-Line Monitor Device is characterized in that: end screen earthing device (1) comprises shell (5), conduction contact lever (7), guide sleeves (16), insulating bushing (6), back up pad (8), spring (9), pressing plate (10), coil brace (11), measures coil (12) and end cap (14); Shell (5) is provided with flange; Conduction contact lever (7) is installed at shell (5) center; Conduction contact lever (7) the front portion guide sleeves (16) that is slidingly installed; Guide sleeves (16) rear end fixedly mounts back up pad (8), pocketed springs (9) successively and pressing plate (10) is installed, and between guide sleeves (16), back up pad (8), spring (9) and pressing plate (10) and the shell (5) insulating bushing (6) is installed, conduction contact lever (7) rear portion fixed installation coil brace (11); Coil brace (11) is gone up to twine and is measured coil (12); Coil brace (11) is gone up two outlet nuts (13) is installed, and measures coil (12) two ends and is individually fixed in two outlet nuts (13), and two outlet nuts (13) are connected with respectively measures lead (23); The other end of measuring lead (23) is positioned at shell (5) outside, and shell (5) rear end is threaded with end cap (14).
3. a kind of bushing shell for transformer as claimed in claim 2 end screen ground connection on-Line Monitor Device; It is characterized in that: clamp nut (17) is fixed in conduction contact lever (7) with coil brace (11); Fairlead (15) will be connected on measurement lead (23) on the outlet nut (13) and draw shell (5) and seal, and between shell (5) rear end and the end cap (14) O-ring seal (22) will be installed.
4. a kind of bushing shell for transformer as claimed in claim 3 end screen ground connection on-Line Monitor Device; It is characterized in that: the rear end of insulating bushing (6) and front end are fixedly mounted on shell (5) through first jump ring (18) and the 4th jump ring (21) respectively; Back up pad (8) is fixing by the 3rd jump ring (20) with conduction contact lever (7); Pressing plate (10) and conduction contact lever (7) clearance fit, second jump ring (19) that is fixed on insulating bushing (6) is equipped with in pressing plate (10) rear end.
5. like any described a kind of bushing shell for transformer end screen ground connection on-Line Monitor Device of claim 1 to 4; It is characterized in that: sampling conveyer (2) comprises three D/A converter modules (26), programmable controller (27) and first data radio station (28A), and joining through cable is corresponding one by one of earthing device (1) shielded at three D/A converter modules (26) input end and three ends; Three D/A converter modules (26) output terminal is connected with programmable controller (27) input end, and programmable controller (27) output terminal is connected through RS-485 communication (24) with first data radio station (28A) input end; Remote monitoring device (3) comprises second data radio station (28B) and industrial computer (29), and first data radio station (28A) is connected with second data radio station (28B) signal, and second data radio station (28B) output terminal is connected with industrial computer (29).
6. a kind of bushing shell for transformer as claimed in claim 5 end screen ground connection on-Line Monitor Device, it is characterized in that: programmable controller (27) output terminal is connected with audible-visual annunciator (31) through warning output relay (30).
CN 201220099708 2012-03-16 2012-03-16 On-line monitoring device of high-voltage transformer bushing tap grounding Withdrawn - After Issue CN202600100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220099708 CN202600100U (en) 2012-03-16 2012-03-16 On-line monitoring device of high-voltage transformer bushing tap grounding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220099708 CN202600100U (en) 2012-03-16 2012-03-16 On-line monitoring device of high-voltage transformer bushing tap grounding

Publications (1)

Publication Number Publication Date
CN202600100U true CN202600100U (en) 2012-12-12

Family

ID=47317631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220099708 Withdrawn - After Issue CN202600100U (en) 2012-03-16 2012-03-16 On-line monitoring device of high-voltage transformer bushing tap grounding

Country Status (1)

Country Link
CN (1) CN202600100U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102540034A (en) * 2012-03-16 2012-07-04 甘肃电力科学研究院 High-voltage transformer bushing tap grounding on-line monitoring device
CN107424730A (en) * 2017-07-31 2017-12-01 国网天津市电力公司电力科学研究院 A kind of Transformer Bushing Tap earthing or grounding means with earthing detection function
CN107831410A (en) * 2017-09-26 2018-03-23 杭州西湖电子研究所 A kind of capacitive bottom shielding of bushing signal supervisory instrument
CN113759293A (en) * 2021-09-01 2021-12-07 咸亨国际(杭州)电气制造有限公司 Simulated power transformer for training and modeling method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102540034A (en) * 2012-03-16 2012-07-04 甘肃电力科学研究院 High-voltage transformer bushing tap grounding on-line monitoring device
CN107424730A (en) * 2017-07-31 2017-12-01 国网天津市电力公司电力科学研究院 A kind of Transformer Bushing Tap earthing or grounding means with earthing detection function
CN107831410A (en) * 2017-09-26 2018-03-23 杭州西湖电子研究所 A kind of capacitive bottom shielding of bushing signal supervisory instrument
CN113759293A (en) * 2021-09-01 2021-12-07 咸亨国际(杭州)电气制造有限公司 Simulated power transformer for training and modeling method thereof

Similar Documents

Publication Publication Date Title
CN102540034B (en) High-voltage transformer bushing tap grounding on-line monitoring device
CN202957123U (en) Self-test and self-protection oil-immersed power transformer
CN101900782B (en) Testing system of gas insulated combined electric appliance equipment
CN202421421U (en) Insulating-performance online monitoring device of capacitive high-voltage electrical equipment
CN103454580B (en) A kind of circuit-breaker switching on-off coil characteristics proving installation
CN104215835A (en) Automatic measuring system for main transformer
CN202600100U (en) On-line monitoring device of high-voltage transformer bushing tap grounding
CN103426620B (en) Open-close type electronic current transformer
CN101614798B (en) Polarity detection system of electronic transformer
CN204129166U (en) One can phase shift alternating-current voltage resistance test device
CN105067998A (en) Voltage and current fluctuation detector
CN103884915A (en) Device and method for automatically measuring direct-current resistance of windings of power transformers
CN204256059U (en) A kind of 10kV shunt reactor switching service test system
CN101726687A (en) Method for monitoring one-point grounding of secondary neutral point of voltage transformer between transformer substation and power plant
CN201569508U (en) Temperature rise monitoring and analyzing device of high-pressure equipment
CN102543410B (en) Cascade high-potential energy supply device
CN202256512U (en) Multifunctional phase check instrument
CN201697974U (en) Cable and wireless integral nuclear phase instrument
CN203216999U (en) Capacitive equipment dielectric loss live line measurement sampling device
CN205120899U (en) Locomotive high voltage insulation detecting system
CN203352283U (en) Remotely controllable and maintainable 10 kV on-column transformer
CN203786256U (en) Low-frequency superposition type measuring circuit
CN204129137U (en) A kind of electric power dry reactor strand distribution of current analog testing platform
CN203250629U (en) Mutual inductor secondary winding connection box
CN102759691B (en) Positive/negative polarity direct-current high-voltage partial discharge testing system for GIS fault diagnosis

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20121212

Effective date of abandoning: 20140528

RGAV Abandon patent right to avoid regrant