CN202578783U - Bored decompression side-ditch centralized drainage structure for traffic tunnel - Google Patents

Bored decompression side-ditch centralized drainage structure for traffic tunnel Download PDF

Info

Publication number
CN202578783U
CN202578783U CN 201220243831 CN201220243831U CN202578783U CN 202578783 U CN202578783 U CN 202578783U CN 201220243831 CN201220243831 CN 201220243831 CN 201220243831 U CN201220243831 U CN 201220243831U CN 202578783 U CN202578783 U CN 202578783U
Authority
CN
China
Prior art keywords
drainage
tunnel
gutter
traffic
ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220243831
Other languages
Chinese (zh)
Inventor
孙荣博
郑光伟
崔金铁
王福运
刘占军
张少武
齐志坚
马龙彪
郑徳湘
张军
徐怀聚
黄�俊
黄相军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA WATER NORTHEASTERN INVESTIGATION DESIGN AND RESEARCH Co Ltd
Original Assignee
CHINA WATER NORTHEASTERN INVESTIGATION DESIGN AND RESEARCH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA WATER NORTHEASTERN INVESTIGATION DESIGN AND RESEARCH Co Ltd filed Critical CHINA WATER NORTHEASTERN INVESTIGATION DESIGN AND RESEARCH Co Ltd
Priority to CN 201220243831 priority Critical patent/CN202578783U/en
Application granted granted Critical
Publication of CN202578783U publication Critical patent/CN202578783U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a bored decompression side-ditch centralized drainage structure for a traffic tunnel, and belongs to traffic tunnels. A tunnel arch drainage channel is fixedly communicated with drainage side ditches; a concrete bottom drainage blind ditch is fixedly communicated with the drainage side ditches; the drainage side ditches are covered with reinforced concrete cover plates; plastic drainage blind ditches for surrounding rocks at the lower part of the tunnel are fixedly communicated with the drainage side ditches; and the included angles between the plastic drainage blind ditches for the surrounding rocks at the lower part of the tunnel and a plumb line direction is alpha, which is 10 degrees. The bored decompression side-ditch centralized drainage structure has the advantages that the bored decompression side-ditch centralized drainage structure is novel in structure, capable of removing underground confined water of the traffic tunnel effectively, simple in construction process, short in construction period, convenient and fast in construction method, clear in principle, easy to master, and suitable for traffic tunnels of various types on roads of II level or lower than II level, so as to be a new breakthrough of the design of drainage facilities for the traffic tunnel.

Description

The centralized discharge structure of traffic tunnel boring decompression gutter
Technical field
The utility model belongs to traffic tunnel, especially the traffic tunnel discharge structure on the highway.
Background technology
Because traffic tunnel passes through massif or imbeds underground; Phreatic activity makes tunnel surface get damp, seep water, freeze; This phenomenon not only makes tunnel lining concrete produce calcium loss and freeze-thaw damage, influences tunnel application life, and traffic safety is brought serious hidden danger.
For the transport solution tunnel gets damp, infiltration, ice formation issues, in the design and construction of traffic tunnel, the normal employing is provided with central buried gutter and gets rid of the underground water in the rock mass.This method system enters central buried gutter with the underground water in the rock mass through transverse drain, concentrates through the buried gutter of central authorities to be discharged to the outer highway gutter of traffic tunnel to underground water again.But it is comparatively complicated that shortcoming is a construction technology, and construction costs is high, and the construction period is longer.Though the excavated volume of central buried gutter own is also little, for rock excavation, channel excavation can be wasted the more time, and in digging process, need take the controlled blasting measure, otherwise will destroy the groove surrounding rock body.In case rock mass goes to pot, just must fractured rock be excavated, and adopt concrete to carry out backfill, can increase more investment like this.Just can carry out the construction on road surface after accomplishing central buried gutter and transverse drain simultaneously, influence the construction period, and for ease of maintenance, require at certain distance manhole to be set, manhole is also influential to traffic safety.
Summary of the invention
The utility model provides a kind of traffic tunnel boring decompression gutter centralized discharge structure, and to solve present traffic tunnel drainage construction complex process, construction costs is high, and the construction period is long, and the problem of well to the traffic safety influence that detect is set.
The technical scheme of the utility model is: arch, tunnel drainage channel fixedly is communicated with gutter; The concrete base weeper drain fixedly is communicated with gutter; Cover the steel concrete cover plate above the gutter; Bottom, tunnel country rock water drainage plastics french drain fixedly is communicated with gutter, and bottom, tunnel country rock water drainage plastics french drain and plumb line angular separation are α, and the α angle is 10 °.
The advantage of the utility model is: novel structure; The underground artesian water that can get rid of traffic tunnel effectively; And construction technology is simple, save the construction period, job practices is convenient, clear principle, easy master, applicable to II level and II level with the various forms of traffic tunnels on getting down the highway.It is the new breakthrough of traffic tunnel drainage design.
Description of drawings
Fig. 1 is the structural representation of the utility model.
The specific embodiment
Arch, tunnel drainage channel 2 fixedly is communicated with gutter 1; Concrete base weeper drain 3 fixedly is communicated with gutter 1; Cover steel concrete cover plate 5 above the gutter 1; Bottom, tunnel country rock water drainage plastics french drain 4 fixedly is communicated with gutter 1, and bottom, tunnel country rock water drainage plastics french drain 4 is α with the plumb line angular separation, and the α angle is 10 °.
In conjunction with walkway, both sides, traffic tunnel road surface or maintaining roadway, gutter is set below it as main drainage channel.Gutter is arranged to have certain longitudinal grade, so that get rid of surface gathered water and guarantee that water does not freeze under flow regime.Cover the steel concrete cover plate above the gutter, be convenient to pedestrian or maintainer walking.Drainage channel gutter below the sidewalk in arch, tunnel links to each other, and underflow around the hogback is gone into to gutter, finally is rejected to outside the tunnel.Be exuded to pavement concrete bottom underground water,, underground water be incorporated into the both sides gutter, be discharged to outside the tunnel again through burying the method for concrete base weeper drain underground.Weeper drain is arranged to have certain longitudinal gradient, and pavement concrete bottom artesian water just can be drained in the gutter smoothly like this.The mode that bottom, tunnel country rock artesian water adopts rig to beat drain hole drains in the gutter, both sides underground water.Plug is filled out the plastic draining french drain in the hole, prevents the drain hole obstruction and reduces seepage pressure.Descend artesian water just can well be drained in the gutter of both sides in this wise, can play good effect the generation that solves road surface counter tide, the phenomenon of freezing along the plastic draining french drain.

Claims (2)

1. the centralized discharge structure of traffic tunnel boring decompression gutter; Arch, tunnel drainage channel fixedly is communicated with gutter; The concrete base weeper drain fixedly is communicated with gutter; Cover the steel concrete cover plate above the gutter, bottom, tunnel country rock water drainage plastics french drain fixedly is communicated with gutter, it is characterized in that: bottom, tunnel country rock water drainage plastics french drain and plumb line angular separation are α.
2. according to the centralized discharge structure of claim 1 said traffic tunnel boring decompression gutter, it is characterized in that: the α angle is 10 °.
CN 201220243831 2012-05-29 2012-05-29 Bored decompression side-ditch centralized drainage structure for traffic tunnel Expired - Lifetime CN202578783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220243831 CN202578783U (en) 2012-05-29 2012-05-29 Bored decompression side-ditch centralized drainage structure for traffic tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220243831 CN202578783U (en) 2012-05-29 2012-05-29 Bored decompression side-ditch centralized drainage structure for traffic tunnel

Publications (1)

Publication Number Publication Date
CN202578783U true CN202578783U (en) 2012-12-05

Family

ID=47248204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220243831 Expired - Lifetime CN202578783U (en) 2012-05-29 2012-05-29 Bored decompression side-ditch centralized drainage structure for traffic tunnel

Country Status (1)

Country Link
CN (1) CN202578783U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986836A (en) * 2016-06-14 2016-10-05 中铁隧道勘测设计院有限公司 Single-line railway tunnel substrate waterproof and drainage reinforcing system
CN108049915A (en) * 2017-12-12 2018-05-18 中国水利水电第十工程局有限公司 The drainage system of underground traffic tunnels
CN109973147A (en) * 2019-03-08 2019-07-05 中铁十九局集团第三工程有限公司 A kind of vcehicular tunnel drainage groove applies method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986836A (en) * 2016-06-14 2016-10-05 中铁隧道勘测设计院有限公司 Single-line railway tunnel substrate waterproof and drainage reinforcing system
CN105986836B (en) * 2016-06-14 2018-12-14 中铁隧道勘测设计院有限公司 A kind of single-track railway tunnel substrate guarded drainage strengthen the system
CN108049915A (en) * 2017-12-12 2018-05-18 中国水利水电第十工程局有限公司 The drainage system of underground traffic tunnels
CN108049915B (en) * 2017-12-12 2019-06-18 中国水利水电第十工程局有限公司 The drainage system of underground traffic tunnels
CN109973147A (en) * 2019-03-08 2019-07-05 中铁十九局集团第三工程有限公司 A kind of vcehicular tunnel drainage groove applies method

Similar Documents

Publication Publication Date Title
CN105421485B (en) Construction method of high-fill prefabricated cast-in-situ combined pile slab wall protection structure
US11753937B2 (en) Ultra-long tunnel sewage disposal, separation and drainage structure suitable for cold regions
CN105545355B (en) The discharge structure of tunnel bottom suitable for rich water lithostratigraphy
CN206386150U (en) A kind of Underground Subway Station draining and examination and repair system
CN205116217U (en) Height is filled and is prefabricated cast -in -place combination formula stake siding wall protective structure
CN103953008B (en) A kind of modified mixed dam being applicable to Tailings Dam
CN107401413A (en) Tunnel structure for expansive stratum
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN105926391B (en) A kind of curb method for widening of existing railway roadbed
CN103541762A (en) Permanent and temporary combined anti-freezing drainage structure and method for high altitude severe cold rich water tunnel
CN108757027B (en) Multifunctional drainage system in tunnel
CN202578783U (en) Bored decompression side-ditch centralized drainage structure for traffic tunnel
CN208982109U (en) A kind of tunnel structure with antiseepage drain function
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN103089298B (en) Structure and method for building side direction multicolumn gob-side entry retaining filling wall body
CN201635745U (en) Ribbed-arch multi-arch tunnel
CN208380578U (en) Precast construction in a kind of roads and tunnels
CN110230273A (en) A kind of safeguard structure of small-sized rockfall
CN105625446A (en) Construction method for railway under tunnel
CN203547763U (en) High backfilling anti-sliding open cut tunnel structure
CN210946536U (en) Protective structure of small dangerous rock falling stone
CN106968259A (en) A kind of underground three-dimensional garage crater wall structure frozen construction method
CN106988748B (en) High-order parallel heading construction and capacity expansion revamping are the construction method of double line tunnel
CN109322315A (en) A kind of retaining structure and its construction method for high Steep Slope Embankment location
CN215292503U (en) Tunnel structure passing through karst cavity

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121205