CN202571647U - Feeding device for strengthening rib in steel structure round pipe - Google Patents
Feeding device for strengthening rib in steel structure round pipe Download PDFInfo
- Publication number
- CN202571647U CN202571647U CN 201220167566 CN201220167566U CN202571647U CN 202571647 U CN202571647 U CN 202571647U CN 201220167566 CN201220167566 CN 201220167566 CN 201220167566 U CN201220167566 U CN 201220167566U CN 202571647 U CN202571647 U CN 202571647U
- Authority
- CN
- China
- Prior art keywords
- round pipe
- guide post
- guide rod
- strengthening rib
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to the field of manufacturing of steel structures and relates to a feeding device for a strengthening rib in a steel structure round pipe. The feeding device for the strengthening rib in the steel structure round pipe comprises a base plate and guide devices, wherein the guide devices are uniformly distributed and installed on the circumference with the center of the base plate as a circle center; each guide device comprises a fixing sleeve (1) and a guide rod (4); the guide rod is embedded into the fixing sleeve; the inner side end part of the fixing sleeve matched with the guide rod is provided with a return spring (5); the outer end of the guide rod extends out of the fixing sleeve; the top part of the outer end of the guide rod is provided with a guide wheel (6); the fixing sleeve matched with the guide rod is provided with a rack and pinion mechanism used for regulating a position; and the fixing sleeve is simultaneously provided with a guide rod locking bolt (3). The feeding device for the strengthening rib in the steel structure round pipe is simple in structure and convenient to operate and use, the high-speed feeding of the strengthening rib in the steel structure round pipe can be realized, the feeding device can be widely applied to production construction of round pipe members in the steel structure industry, and the assembly and installation working efficiency of the strengthening rib in the round pipe is improved.
Description
Technical field
The utility model belongs to steel construction and makes the field, relates to ribs feeding method in a kind of steel construction pipe class, particularly relates to ribs pay-off in a kind of steel construction pipe class.
Background technology
Making the field at steel construction at present, when relating in the pipe class ribs welding production, all is the method that adopts artificial feeding basically, inconvenient operation, and time-consuming, operating efficiency is low, has had a strong impact on the making that steel construction pipe class makes up.And the at present also ripe without comparison quick feeding device and method that is applicable to ribs in the steel construction pipe class is unfavorable for the production and construction of steel construction industry pipe class A of geometric unitA.
Summary of the invention
The utility model is not enough to prior art; Ribs pay-off in a kind of simple in structure, easy to operate steel construction pipe class is proposed; The production and construction that can be widely used in steel construction industry pipe class A of geometric unitA realizes that the quick assembling of ribs is made in the pipe class.
The technical scheme that the utility model adopted:
Ribs pay-off in a kind of steel construction pipe class; Comprise base plate (2), guider; Said guider is uniformly distributed with that to be installed in the base plate center be on the circumference in the center of circle; Each guider comprises fixed sleeving (1) and guide post (4), and said guide post (4) is nested in the said fixed sleeving (1), and the fixed sleeving medial end cooperates with guide post and is provided with back-moving spring (5); Stretch out outside the fixed sleeving (1) the guide post outer end; Guide post (4) top, outer end is provided with directive wheel (6), and said fixed sleeving (1) cooperates the pinion and rack that is provided with in order to the adjustment position with guide post (4), be provided with guide post clamping screw (3) on the fixed sleeving (1) simultaneously.
Ribs pay-off in the described steel construction pipe class; On base plate (2), be provided with device preventing tilting; Said device preventing tilting comprises a connecting rod (7), and said connecting rod is hinged on base plate through an engaging lug, and connecting rod (7) free end fixedly mounts a directive wheel.
The beneficial effect of the utility model:
1, ribs pay-off in the utility model steel construction pipe class; Simple in structure; Operation, easy to use; Can realize the quick feeding of ribs in the steel construction pipe class, can be widely used in the production and construction of steel construction industry pipe class A of geometric unitA, improve the upright installment work efficient of group of ribs in the pipe class.
2, ribs pay-off in the utility model steel construction pipe class is provided with device preventing tilting, can prevent effectively that ribs from tilting to overturn tilt adjustable.
Description of drawings
Fig. 1: ribs pay-off master TV structure sketch map in the utility model steel construction pipe class;
Fig. 2: ribs pay-off left view shown in Figure 1 (having removed a guider of below).
The specific embodiment
Embodiment one: referring to Fig. 1, Fig. 2, ribs pay-off in the utility model steel construction pipe class comprises base plate 2, guider; Said guider is uniformly distributed with that to be installed in the base plate center be on the circumference in the center of circle; Each guider comprises fixed sleeving 1 and guide post 4, and said guide post 4 is nested in the said fixed sleeving 1, and the fixed sleeving medial end cooperates with guide post and is provided with back-moving spring 5; Stretch out outside the fixed sleeving 1 the guide post outer end; Top, guide post 4 outer end is provided with directive wheel 6, and said fixed sleeving 1 cooperates the pinion and rack that is provided with in order to the adjustment position with guide post 4, be provided with guide post clamping screw 3 on the fixed sleeving 1 simultaneously.
Ribs pay-off in the utility model steel construction pipe class is connected on the member through base plate during use, and base plate and member are used bolt, and base plate can be dismantled.Base plate and ribs fix, and four guiders withstand on the round tube inner wall, and manual work pushes, and accomplish the feeding of ribs in the pipe class, accomplish welding at random.
Embodiment two: referring to Fig. 1, Fig. 2; Ribs pay-off in the steel construction pipe class of present embodiment; Be with the difference of embodiment one: on base plate 2, be provided with device preventing tilting; Said device preventing tilting comprises a connecting rod 7, and connecting rod 7 is hinged on base plate through an engaging lug, and connecting rod 7 free ends fixedly mount a directive wheel.Radial position is adjustable, and retractable prevents that ribs from tilting to overturn.
Claims (2)
1. ribs pay-off in the steel construction pipe class; Comprise base plate (2), guider; It is characterized in that: said guider is uniformly distributed with that to be installed in the base plate center be on the circumference in the center of circle; Each guider comprises fixed sleeving (1) and guide post (4), and said guide post (4) is nested in the said fixed sleeving (1), and the fixed sleeving medial end cooperates with guide post and is provided with back-moving spring (5); Stretch out outside the fixed sleeving (1) the guide post outer end; Guide post (4) top, outer end is provided with directive wheel (6), and said fixed sleeving (1) cooperates the pinion and rack that is provided with in order to the adjustment position with guide post (4), be provided with guide post clamping screw (3) on the fixed sleeving (1) simultaneously.
2. ribs pay-off in the steel construction pipe class according to claim 1; It is characterized in that: on base plate (2), be provided with device preventing tilting; Said device preventing tilting comprises a connecting rod (7); Said connecting rod is hinged on base plate through an engaging lug, and connecting rod (7) free end fixedly mounts a directive wheel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220167566 CN202571647U (en) | 2012-04-19 | 2012-04-19 | Feeding device for strengthening rib in steel structure round pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220167566 CN202571647U (en) | 2012-04-19 | 2012-04-19 | Feeding device for strengthening rib in steel structure round pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202571647U true CN202571647U (en) | 2012-12-05 |
Family
ID=47241099
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220167566 Expired - Fee Related CN202571647U (en) | 2012-04-19 | 2012-04-19 | Feeding device for strengthening rib in steel structure round pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202571647U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106525335A (en) * | 2016-12-08 | 2017-03-22 | 厦门金龙联合汽车工业有限公司 | Movable type three-line pendulum adjustable auxiliary support device |
CN113322950A (en) * | 2021-04-29 | 2021-08-31 | 上海长凯岩土工程有限公司 | Inclined strut steel pipe middle locking type remote constraint bin grouting device and construction method thereof |
-
2012
- 2012-04-19 CN CN 201220167566 patent/CN202571647U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106525335A (en) * | 2016-12-08 | 2017-03-22 | 厦门金龙联合汽车工业有限公司 | Movable type three-line pendulum adjustable auxiliary support device |
CN113322950A (en) * | 2021-04-29 | 2021-08-31 | 上海长凯岩土工程有限公司 | Inclined strut steel pipe middle locking type remote constraint bin grouting device and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202187431U (en) | Adjustable support rod | |
CN204934266U (en) | Manual pipe bender | |
CN202571647U (en) | Feeding device for strengthening rib in steel structure round pipe | |
CN204097920U (en) | A kind of novel guardrail | |
CN203604807U (en) | Supporting device | |
CN201559059U (en) | Wire-hanging type aligner | |
CN102145873B (en) | Oil supplementing device for bellows expander | |
CN204465425U (en) | A kind of solar panels ground mounting support structure | |
CN204573326U (en) | A kind of central air-conditioning pipe installation clip | |
CN105178698A (en) | Fence capable of being mounted quickly | |
CN201769170U (en) | Small-aperture wire thread insert mounting tool | |
CN211776064U (en) | Adjustable support system of precast beam component | |
CN204997646U (en) | Support frame device with adjustable | |
CN211071583U (en) | Table type bending machine | |
CN204546369U (en) | For the servicing unit that steering column and damper assemble | |
CN202627508U (en) | Mandrel adjustable support rod | |
CN202032778U (en) | Solar water heater bracket | |
CN103624186B (en) | Processing unit (plant) of field fabrication large diameter circular arc reinforcing bar and preparation method thereof | |
CN202007110U (en) | Device for overturning polygonal and irregularly-shaped steel tubes | |
CN204531587U (en) | New corrugated pipe water tower | |
CN103075661A (en) | Telescopic universal adjusting lamp | |
CN201386386Y (en) | Integral template device used for chimney construction | |
CN212507339U (en) | Pole setting self-lock device for scaffold frame | |
CN204348920U (en) | A kind of grid antenna device | |
CN204756332U (en) | Fixed structure of heat exchanger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121205 Termination date: 20150419 |
|
EXPY | Termination of patent right or utility model |